Laserfiche WebLink
Item No. 5 <br /> 5-81-6 <br /> P/C 4-16-81 <br /> Page 2 <br /> REFERRALS AND REPLIES <br /> - LAFCO <br /> - Continental Telephone Company <br /> - Pacific Gas & Electric Company -- The Pacific Gas and Electric Company is <br /> requesting that 10-foot public utility easements be dedicated on all lot ' <br /> frontages. <br /> The Company has an existing electric distribution pole line crossing a <br /> portion of the proposed subdivision as shown on the attached map. Any <br /> relocation or undergrounding of these facilities will be at the developer' s <br /> expense. <br /> - Caltrans -- "1. A left-turn pocket will be required. 2. Access will be <br /> limited to Ideal Parkway. 3. There appears to be a roadway easement along <br /> the east side of the property. If so, none of the lots should have access <br /> to it. It would be better to abandon it between Route 120 and the north <br /> end of Ideal Parkway where it meets the east property line. Access could <br /> then be via Ideal Parkway to that point, then the easement could continue <br /> north. " <br /> - Manteca School District <br /> - Manteca-Lathrop Fire District -- "Being that the proposed Industrial <br /> Subdivision is located outside Municipal or District water Supplies, it is <br /> most important that fixed water for Fire Protection be required. <br /> Should the application be approved by planning, I would request plans <br /> furnished SJ Bldg. also be furnished the Manteca-Lathrop Fire District for <br /> study. I would further request conditions be entered that owner supply to <br /> the Fire District for approval, a fire loop system for Fire Protection. <br /> Fire Flow information will be provided by Fire District. " <br /> - South San Joaquin Irrigation District --"As indicated on the tentative map <br /> the SSJID has a 30 foot wide easement which passes through the subdivision. <br /> The pipeline is a 36 inch diameter non-reinforced concrete pipe carrying <br /> water under pressure. In the present agricultural setting the pipe serves <br /> adequately. However, the pipeline is not adequate in the proposed <br /> industrial setting. <br /> The District requests that a condition of approval of the tentative map be <br /> established requiring the Developer and the District to come to an agree- <br /> ment as to modifying the pipeline. <br /> We understand that County standards will require reinforced pipe across <br /> the proposed roadway. " <br /> - City of Manteca <br /> - Fire Warden <br /> - Sheriff <br /> - Delta College <br /> - State Clearinghouse --"State agencies have commented on your negative <br /> declaration (see attached) . If you would like to discuss the concerns and <br /> recommendations in their comments, contact the staff from the agencies <br /> whose names and addresses appear on the comments. <br />