Laserfiche WebLink
2705 Country Club, Stockton, CA PR0231072 <br /> 05/11/2022 Program: UST <br /> PHOTO 3: <br /> The 04/08/2022 des, nated o erator monthly inspection report reported an incorrect secondary containment test date <br /> �I Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> Date last 1 <br /> -- Yes No NA performed gpeedwsy:6822 A <br /> 10. TESTING AND MAINTENANCE 0: ountry Club <br /> be' completed within the past Q ❑ 5117 1 liddress: 2705 <br /> Co <br /> Has monitoring system certification been comp First <br /> environmer 12 months? 0 ❑ Last <br /> 25971 T"^e G completed within the past �Izm <br /> Has spill container testing been <br /> 12 months? <br /> Has overfill prevention equipment inspection been completed within Q El 1:1 y/0 <br /> the past 36 months? Ronnell <br /> Nam Has secondary containment testing been completed within the past 0 414119 <br /> KhaW*Kh 36 months? <br /> Ale and=r pp Has tank tightness testing been completed within required Griselcia <br /> victor_ ❑ ❑ NIA Alegria <br /> h sun timeframes? <br /> 1.5-_- Ti line tightness testing been completed within the required <br /> Ked�Coles WA <br /> Kaidin Cohn <br /> timeframes? ❑ ❑ Suddith Dawn <br /> Kevin sutra Other Test 1 Maintenance: ❑ ❑ 0 WA <br /> Oscar Gar01 Other Test/Maintenance: <br /> WA <br /> KBee Gott- ❑ ❑ 0 Melenolrez <br /> Other Test/Maintenance: Francisco <br /> Christopher ❑ ❑ � WA (Frank) <br /> Noah inma1 11. FACILITY EMPLOYEE TRAINING Yes No <br /> JorgeK1101, Have all individuals performing facility employee duties received the required facility <br /> Sane in employee training within the past 12 months? ' ez <br /> Steven pAa � Cristina <br /> Scott 13. COMMENTS <br /> Joee tOre Acrey Ng This section may be used to <br /> record comments or observations that are not current compliance 0epa� Tatiana <br /> llffanN9 <br /> deficiencies. sse <br /> Joseph Pa <br /> 1.No Priority alarms since previous inspection. <br /> Steven Pen 2.No sump alarms since previous inspection. Edwards <br /> on Rlo <br /> ryam3.Initial Overfill Prevention E ��2mlrt <br /> n River Quipm <br /> Eveent Ins <br /> lY_ pection condu <br /> Ruvew .initial seconds sled°n 517/20.Retest <br /> Huls -- 1 secondary Containment testing completed Madave <br /> JOge Sante 9 conducted on q/4/f 9 10/7/20. <br /> Solos 5.Employees trained on 418/22 S Retest com le T kl <br /> Justin Steel See attached em P ted on 12/27/19. { AI <br /> Roman PloYee training roster, M° <br /> -- oavld Soto n4lge2 <br /> lens <br /> ''IGha Toped StePhanle <br /> R` Ts"o- Rash <br /> Ahyso Zpen Mk"ne <br /> 1741 <br /> StagbRf <br /> All answersF <br /> marked <br /> NO"must be a <br /> described <br /> by the desl9nate <br /> d UST°perator in Section 3. <br /> Page 4 of 4 <br /> SPEEDWAY-66221-04/06/2022 <br /> VICKY VANG-LEE, REHS Page 3 of 4 <br />