My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2022 4:10:16 PM
Creation date
1/24/2022 9:54:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2705 Country Club, Stockton, CA PR0231072 <br /> 05/11/2022 Program: UST <br /> PHOTO 4: <br /> The 05/06/2022 designated operator monthly inspection report reported an incorrect secondary containment test date <br /> Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> Date last <br /> 10. TESTING AND MAINTENANCE <br /> Yes No NA performed <br /> Has monitoring system certification been completed within the past <br /> 12 months? wow <br /> Has spill container testing been completed within the past Q 11 5/12121 <br /> 12 months? <br /> Has overfill prevention equipment inspection been completed within Q 0 517/20 <br /> the past 36 months? <br /> Has secondary containment testing been completed within the past 4/4/19 <br /> 36 months? <br /> Has tank tightness testing been completed within required ❑ N/A I <br /> timeframes? <br /> Has line tightness testing been completed within the required ❑ ❑ 0 N/A <br /> timeframes? <br /> N/A❑ <br /> Other Test!Maintenance: ❑ b <br /> Other Test/Maintenance: <br /> ❑ ❑ N/A �.,. <br /> Other Test/Maintenance: 11 El 0 N/A <br /> 11. FACILITY EMPLOYEE TRAINING <br /> Yes INo <br /> Have all individuals performing facility employee duties received the required facility ❑ <br /> employee training within the past 12 months? <br /> 13. COMMENTS ea s <br /> This section may <br /> be used to record comments or observations that are not current compliance PR"' <br /> deficiencies. - <br /> 1 No priority alarms since previous inspection. <br /> 2.No sump alarms since Previous inspection. <br /> 3.Initial Overfill Prevention Equipment Inspection conducted on 5/7/20.Retest completed 10/7/20. Nan <br /> containment testingconducted on 4/4/19.Retest completed on 12/27/19. 1Cc <br /> . <br /> IT Secondary <br /> Sp <br /> N <br /> 5.Trained employees on 5/6/22-see attached employee roster. \ <br /> i <br /> All answers marked"No"must be described by the designated UST operator in Section 3 <br /> I '. <br /> SPEED Page 4 of 4 <br /> WAY-66221-06/06/2022 <br /> VICKY VANG-LEE, REHS Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.