My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2022 4:10:16 PM
Creation date
1/24/2022 9:54:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer D Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used: Incon Tester <br /> Sump/UDC ID UDC 1/2 UDC 3/4 UDC 5/6 UDC 7/8 <br /> Sump Manufacturer Bravo Steel Bravo steel Bravo steel Bravo steel <br /> Sump Depth (inches) 12" 12" 12" 12" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 4" 4" 4" 4" <br /> (inches) <br /> Test Start Time 10:33 am 10:33 am N/A 10:33 am <br /> Initial Reading 0.8811 2.5264 N/A 3.5362 <br /> Test End Time 10:48 am 10:48 am N/A 10:48 am <br /> Final Reading 0.8643 2.5261 N/A 3.5363 <br /> Change in Reading 0.0168 0.0003 N/A 0.0001 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results ❑ Pass 0 Fail 0 Pass ❑ Fail ❑ Pass 0 Fail 0 Pass ❑ Fail <br /> Sump/UDC ID UDC 9/10 <br /> Sump Manufacturer Bravo steel <br /> Sump Depth (inches) 12" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 4" <br /> (inches) <br /> Test Start Time 10:33 am <br /> Initial Reading 2.7509 <br /> Test End Time 10:48 am <br /> Final Reading 2.7501 <br /> Change in Reading 0.0008 <br /> Pass/Fail Criteria 0.002 <br /> Tightness Test Results 0 Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.