Laserfiche WebLink
W.O.# NW1-2349708 <br /> Tanknology inc. <br /> r747� I I1�t10 N AfoPac Ecpnssrta},Suite 5tk)Austin,T\M." (RM19M-tX)10 14tlwly I1N1:V A <br /> 49 JOB CLEARANCE FORM&SITE SAFETY CHECKLIST-OVF <br /> ke\isol 21l U2UIV <br /> Sue Naa iq: o <br /> A,nval I line. Pepamilt,Time: rw ink• I WO <br /> "ape of 1.and As Pe i1,111s muss bw mmlobto ■s s <br /> epairs to LCiLlIPTI1011 01 tWy ,ov, Ht: <br /> Follow-up actions requinx:equpn,a,t isolated;conunw.: <br /> PPE-PERSONAL PROTE IVE EQUIPMENT REQUIRE Chock✓Items used or murk-M not w htfeab/s) <br /> ,BAfery Vest Safety Glasses _ Gloves I Hosting llio ,i,�is <br /> VJ/steer Toe soots Splash Goggloss ll Hard Flat f l father <br /> ✓ PRE-TEST PROCEDURES (Check ✓'each item completed or mark - if not applicable) <br /> 1. Discuss safety procedures with site personnel, Nearest hospit lz <br /> 2. -❑�or to fuel deliveries the UST system must be placed back Into working order, <br /> 3. J? secure entire work area with barricades(cones,flags.and exlenslm bars,caution lupe,pennant flags,or nti„, •: ,,:t; ,,i, <br /> 4. Place fire extinguishers and"No Smoking'signs in the work arse. <br /> 5. ❑ Confined Space Entry-If required complete separate CSE Chsck jst. if NO CSE REQUIRED check the following reason; <br /> ❑No CS's ❑CS's not opened ❑No entry only visual 0No entry-used tools C7Work from prone posidon wWo rlek of falling n, <br /> 6. ❑ Implement Lockout/Tagout per API 1646(when accessing product piping during tasks) <br /> ❑ Secure nozzles with"Out of Service"bags and nylon ties. 0 Secure the circuit breaker(s)with lookout devices end t:t„ <br /> ❑ Close ball valves or check valves on product piping, El Disconnent**Arial"bayonet"oonneaor from the STP(s). <br /> ❑ All applicable equipment disabled during tests). I'! Verify LOTO Is complete by tryln&operate um a <br /> SIGN IN / i,:r,i t,.on: :n,N;ria ra wctnu�Hwn,ignature <br /> General Safety Checks: <br /> All site personnel have been Informed. (� <br /> Is a fuel delivery due today? rw rexwWwuve anxzsite Ropmeertativo SiOnAturs <br /> LOTO procedures have been discussed, <br /> Work areas barricaded to protect workers,staff&public, <br /> ✓ POST-TEST PROCEDURES(Check✓each!tern completed or nark - If nor applicable) <br /> 1, ❑ Remove all"Lockoutrf agour devices and nozzle bagsRles, <br /> 2. ❑ Run all pumps and verify there are no leaks: I i Impost Valve Test Ports under dispensers <br /> ❑ Leak Detector Threads on STP's l) Functional I laments&Relief Screws <br /> 3. ❑ Install lead wire seal on all test plugs&leak detectors that were sendcod. <br /> Count LD threads: L1_ L2_ L3_ L4 w L5_ L6 <br /> 4, 9 Check following components operational; L.1 ATG probe*,sensors,&caps <br /> ❑fah floats,dry breaks&caps L I Rallfiodic protection operational <br /> Lrtainment sumps are dry I,'rblapensem&POS operational <br /> ispenser panels are replaced i ltubes,flapper valves,fill adapters&caps <br /> /❑ ak detectors&vent tubes nhole covers and sump lids <br /> Monitoring system is operational ^hear valves are open <br /> 1 1 Siphon lines and manifold valves open i) Spill containers&drain valves <br /> STP fittings and bayonet connoctors 1 i Vents&Extractors(not capped,plugged or isolated) <br /> 5. • Remove barricades, <br /> SIGN OUT&Operator Verification of Work(OVF) LwdT L"d Tsc9-nMc"ianMgimw,,, <br /> General Safety Checks: <br /> Work area hos been loft clean&safe. <br /> Site staff aware of work status including any remaining Isolation. OPttwwn w ww N411tvl Site ROPMmardativo,gnatuo <br /> Changes to equipment are documented and communicated, <br /> All Incidents,near Incidents,and unsafe situations reported, <br /> Sit*Representarivi,Commen s: - - <br /> COMPANY CONF1DKN IA1. ®Tanknnlogy Inc,2019,All Rights Reserved. <br /> need copies of this document aro unconnulktd The currant ver",,r..n.n�.,blr m tri;I.mknnlyW On•Line Document Control S tem. <br />