My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2024 12:50:23 PM
Creation date
1/24/2022 3:17:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Test Duration Test Pressure P/F Threshold <br /> Tank Annular-Vacuum 1 hr, 20k or less tank 10" hg 0 loss, int dry before and after test <br /> Tank Annular-Vacuum 2 hr, >20k tank 10" hg 0 loss, int dry before and after test <br /> Line Annular- Pressure 1 hr 5 psi 0 loss <br /> less than 1/8" over hour, settle time <br /> 4" above highest penetration of 15 minutes minimum prior to <br /> STP Sump - Hydro 1 hr or sidewall seam starting the test <br /> less than 1/8" over hour, settle time <br /> 4" above highest penetration of 15 minutes minimum prior to <br /> UDC Sump - Hydro 1 hr or sidewall seam starting the test <br /> no greater than 4" we vaccum decay <br /> Spill Bucket - SW Vac 1 min 30" we bucket must be dry <br /> less than 1/8" over hour, settle time <br /> within 1.5" of top of the of 5 minutest minimum prior to <br /> Spill Bucket - SW Hydro 1 hr bucket starting the test <br /> no greater than 3" we vaccum decay <br /> Spill Bucket - DW Vac 1 min 15" we int must be dry <br />
The URL can be used to link to this page
Your browser does not support the video tag.