My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2024 12:50:23 PM
Creation date
1/24/2022 3:17:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sump "Lake " Test Details <br /> Access all sumps to be tested and verify no stray voltage is present. <br /> Fill out data sheet. <br /> Clean sump per "Test Fluid" Handling Procedures. <br /> Tighten gaskets on all penetration boots. Install terminating reducer fittings <br /> on piping as necessary. <br /> Identify any obvious failure points and make minor repairs if authorized by <br /> contract. <br /> 6. Seal and tighten any loose junction box covers or fittings. <br /> 7. Fill sump with water at least 4" above highest penetration or sidewall seam. <br /> 8. Measure level with a stick or other device with accuracy of 1 /16 . <br /> 9. After 1 hour record the ending water level. If the level changes 1/8" or more <br /> the test fails. <br /> 10. Record test finish time, total level change, and pass/fail result on data sheet. <br /> If alternate test protocols are followed, record the test method, data and <br /> pass/fail results as specified. <br /> Remove water per the Test Fluid Handling Procedures. <br /> 4-AW <br />
The URL can be used to link to this page
Your browser does not support the video tag.