My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014681
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
25533
>
2600 - Land Use Program
>
PP-99-02
>
SU0014681
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 3:23:02 PM
Creation date
1/25/2022 9:25:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014681
PE
2600
FACILITY_NAME
PP-99-02
STREET_NUMBER
25533
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20909037
ENTERED_DATE
12/27/2021 12:00:00 AM
SITE_LOCATION
25533 S MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> Year 2020 Addendum AOT Automotive Traffic study <br /> 4.0 MITIGATION MEASURES <br /> 4.1 Proposed Measures <br /> For the year 2020 all study area intersections would need mitigation in order to meet the County's <br /> LOS D or better standard. The following mitigation measures would be needed to allow study <br /> intersections to operate at acceptable LOS based on County standards: <br /> • 1-580 Eastbound Ramps/Patterson Pass Road Intersection - Add a traffic signal, a <br /> northbound right turn lane, and an eastbound right turn lane. <br /> • 1-580 Westbound Ramps/Patterson Pass Road Intersection-Add a traffic signal. <br /> • Schulte Road/Mountain House Parkway Intersection - Improve traffic signal to include <br /> overlap right turn phasing. <br /> • At the Berkeley Road/Mountain House Parkway intersection -Add a traffic signal. <br /> • 1-205 Eastbound Ramps/Mountain House Parkway Intersection -Add a traffic signal and <br /> a northbound right turn lane. <br /> • 1-205 Westbound Ramps/Mountain House Parkway Intersection-Add a traffic signal. <br /> Year 2020 Plus Project intersection operations were tested with the addition of these mitigation <br /> measures. The resulting LOS for each intersection is summarized in Table 5. Addition of these <br /> mitigation measures would allow all of the intersections-to operate at acceptable levels of service <br /> based on County standards and year 2020 Plus Project traffic volumes. <br /> Table 5 <br /> Cumulative Year 2020 Plus Project With Mitigation Intersection LOS Summar <br /> Intersection No Project With Project With Project and Mitigation <br /> Peak <br /> Hour Los Delay' LOS Delay LOS Delay <br /> 1.580 Eastbound ramps/ AM F 19.1 F 202.4 c 16.2 <br /> Patterson Pass Road PM F OvBw F OVIIw D 35.1 <br /> 1.580 Westbound ramps/ AM E 3.0 F 4.4 A 2.3 <br /> Patterson Pass Road PM F 3.4 F 5.5 A 1.9 <br /> Mountain House AM D 26.4 D 39.6 D 27.0 <br /> arkway/Schulte PM F 62.4 F 92.7 0 31.0 <br /> 1.205 Eastbound ramps/ AM E 3.2 F 4.8 B 7.5 <br /> Mountain House Parkway PM F 25.3 F . 82.8 B 14.4 <br /> 1.205 Westbound Ramps/ AM F 64.8 F 232.6 c 20.4 <br /> Mountain House Parkway PM -F 867.7 F OVIIw c 22.8 <br /> Mountain House AM B 0.5 c 1.1 A 4.0 <br /> arkwayl PM F 14.8 F 371.8 B 12.3 <br /> Ber'Relev <br /> Source: Korve Engineering, Inc. I <br /> In addition to the intersection mitigation measures,parts of Mountain House Parkway and Schulte <br /> Road Will need to be widened in accordance With the Countys 2010 General Plan. Specifically, <br /> Mountain House Parkway will be widened to four lanes all the way from Shulte Road to 1-205. This <br /> includes the addition of extra lanes over the Delta Mendota Canal. Shulte road will be widened to <br /> six lanes east of Mountain House Parkway. <br /> Korve Englneedng,Inc. 11 Juty2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.