Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer © Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure © Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg. <br /> Tank ID 1-91 2-87-Master 3-87-Siphon 4-Diesel <br /> Tank Manufacturer CSI CSI CSI CSI <br /> Tank Capacity 12K 10K 10K 10K <br /> Test Start Time 9:30 9:40 9:50 10:00 <br /> Initial Reading -10" Hg. -10" Hg. -10" Hg. -10" Hg. <br /> Test End Time 10:30 10:40 10:50 11:00 <br /> Final Reading -10" Hg. -10" Hg. -10" Hg. -10" Hg. <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail I ® Pass ❑ Fail ® Pass ❑ Fail I ® Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br /> Pipe Run ID 1-91-Product 2-91-Vent 3-87-M-Pro 4-87-Siphon <br /> Pipe Manufacturer Smith Smith Smith Smith <br /> Test Start Time 9:35 9:38 9:43 9:48 <br /> Initial Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time 10:35 10:38 10:43 10:48 <br /> Final Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Pipe Run ID 5-87M/S-Vent 6-Dsl Pro 7-Dsl Vent 8-Gas Vapor <br /> Pipe Manufacturer Smith Smith Smith Smith <br /> Test Start Time 9:50 9:53 9:58 9:46 <br /> Initial Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time 10:50 10:53 10:58 10:46 <br /> Final Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2of5 <br />