MECHANICAL EQUIPMENT SCHEDULE
<br /> HVAC EQUIPMENT AND MATERIALS DUCTWORK AND ACCESSORIES CONTROLS AND OPERATION
<br /> ..
<br /> EXISTING B Y LANDLORD Filters sheetmetal Ductwork control wiring
<br /> ROOF TOP UNITS
<br /> ( ) Provide three(3)sets of pleated disposable filters. Use one set until completion of construction. All ductwork to be rigid sheetmetal constructed from galvanized sheet steel in accordance with SMACNA low The Mechanical Contractor shall provide all control wiring in conduit necessary for the
<br /> Install one set at completion of construction and deliver one set of filters to Starbucks labeled to velocity duct construction standards. Fiberglass ductboard is not allowed. All exposed ductwork to be round, complete and proper operating temperature controls stem. ..
<br /> COOLING HEATING ELECTRICAL Y 9 P P p P P g p y
<br /> SUPPLY EXT. FAN WEIGHT SEER TRAN E denote their respective air handling unit. Filters to be Farr or similar. spiral,or rectangular lock-seam type,as shown on HVAC Plan sheet M-1102. Assemble and install ductwork in
<br /> MARK SEN TOT COOL IN OUT AIR S.P. REMARKS accordance with recognized industry practice for achieving airtight(5%leakage)and noiseless(no objectionable EMS Thermostat
<br /> BHP VOLT P H MCA M 0 CP (LBS) /EER MODEL NUMBER Exhaust Fans t Thermostats shall be Venstar with non-switching subbase and remote sensors furnished
<br /> (MBH) (MBH) (TON) (MBH) (MBH) (CFM) (I N) noise)systems,capable of performing each indicated service. Furnish all required dampers,transitions, ( ) g sensor(s)
<br /> ContraGreenctoreck
<br /> direct drive rooftop model#G-80-D, provided per lease agreement. The Mechanical connections to air terminals,and other accessories necessary for complete operating system. No variation of duct by Starbucks, unless otherwise noted,for installation by the Mechanical Contractor. One
<br /> Contractor is responsible for coordinating discharge location with new and existing vents and thermostat and sensor is provided for each air handling unit. Mount thermostats at 48"
<br /> RTU-1 63.5 83.5 7.5 120.0 96.0 3,000 0.80 2.8 208 3 42.0 50 1,420 12.6 YHC092 1-12 intakes, providing complete installation including curbs, backdraft,damper,and ductwork from configuration or sizes will be permitted except by permission from the Engineer. P 9 thermostat(s)
<br /> RTU-2 63.5 1 83.5 7.5 120.0 1 96.0 3,000 0.80 1 2.8 208 3 42.0 50 1,420 12.6 YHC092 1-5.7-12 restroom grille to unit and necessary accessories,and providing warranty. Exhaust fan(s)to be above finished floor in location as indicated on drawings. Mechanical Contractor to provide
<br /> thermostat identification labels with 1/8"high white letters on kelly green or black phenolic
<br /> TR A N E IS THE BASIS OF DESIGN. HIGH EFFICIENCY CARRIER, LE N N 0 X, A A 0 N OR YORK ARE EQUAL. interlocked with operated in conjunction with air handling unit(s). Route fan wiring via fan control relay to be Duct Sealant background,i.e. "AC-1:Workroom"and" C-2:Customer Area". Refer to thermostat setup
<br /> EMS. Provide control relay and 24V AC control power supply with overload Seal all longitudinal and transverse joints with a non-hardening, non- ndA
<br /> migrating mastic or liquid elastic sealant of a instructions below for additional requirements.
<br /> COOLING CAPACITIES ARE BASED ON EXPECTED SITE CONDITIONS: 80°F D B/ 64-F WB INDOOR ENTERING AIR protection. Install power supply and fan control relay adjacent to one another in accessible ceiling type recommended by the manufacturer for sealing joints and seams in sheet metal ductwork. Cover all field joints,
<br /> TEMPERATURE, 1107 DB AIR ENTERING OUTDOOR FAN. SCHEDULED UNIT MAY DIFFER FROM A H R I STANDARD CFM. space and extend low voltage wiring between auxiliary relay and fan control relay. Provide joints around spin-in fittings,and fastening screws with mastic. Thermostat Setup Instructions ©2017 STARBUCKS COFFEE COMPANY
<br /> REMARKS: additional wiring to vav damper as required. Coordinate all requirements with Mechanical Provide the following setup and programming on the Venstar thermostat:
<br /> 1. PROVIDE EQUIPMENT WITH SCCR GREATER THAN THE AVAILABLE FAULT CURRENT AT THE EQUIPMENT OR UPSTREAM PANELBOARD. Contractor. Supports 1. Follow instructions in the Manual which comes with the thermostat.
<br /> REFER TO THE ELECTRICAL ONE LINE DIAGRAM AND PANEL SCHEDULES FOR AVAILABLE FAULT CURRENT AT UPSTREAM PANELBOARD. Provide hot-dipped galvanized steel,fasteners,anchors, rods,straps,trim,and angles for support of ductwork. 2. Set DIP switches and jumpers as follows: STARBUCKS COFFEE
<br /> Air Curtains
<br /> 2. PROVIDE WITH FACTORY INSTALLED DISCONNECT, UNPOWERED CONVENIENCE OUTLET, THROUGH THE BASE ELECTRICAL CONNECTION. Air curtains,when required,shall be furnished and installed by the General Contractor. Coordinate a. Degrees"F"display
<br /> Dampers b. 12 Hour Clock COMPANY
<br /> 3. PROVIDE WITH 14 INCH HEIGHT ROOF CURB. with Electrical Contractor for location of power connection. c. Continuous Fan Operation in Occupied Mode
<br /> 4. PROVIDE WITH DRY BULB ECONOMIZER AND POWER EXHAUST. Provide opposed-blade,multi-leaf volume control dampers where indicated on drawings and at points on low P P
<br /> pressure supply, return,and exhaust ducts where branches are taken from larger ducts. Provide UL listed and d. Disable Keyboard Programming 2401 UTAH AVENUE SOUTH
<br /> 5. ECONOMIZER SHALL INCLUDE FAULT DETECTION DIAGNOSTICS (FDD). DAMPER LEAKAGE SHALL MEET APPLICABLE ENERGY CODE. fire/smoke dampers where required and in accordance with NFPA and local codes. Provide conveniently located e. Cut jumper if unit is a Heat Pump SEATTLE,WASHINGTON 98134
<br /> 6. PROVIDE DEMAND CONTROL VENTILATION AND WALL MOUNTED CO2 SENSOR. access doors of ample size and quantity for servicing the dampers. 3. Set clock and day. (206)318-1575
<br /> 7. PROVIDE WITH CONDENSER COIL HAIL GUARD. 4. Set to display current temperature
<br /> B. PROVIDE FACTORY INSTALLED SUPPLY DUCT SMOKE DETECTOR. Grilles, Registers,and Diffusers 5. Set Occupied Start Time at 30min before opening. Set Unoccupied start time at 30min
<br /> 9. PROVIDE WATER LEVEL MONITORING DEVICE IN DRAIN PAN TO SHUT OFF UNIT IF THE DRAIN LINE BECOMES RESTRICTED. Grilles, registers,and diffusers shall be manufactured by Titus and shall be General Contractor supplied,unless after closing. Verify hours with Store Manager or Construction manager. THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> 10. UNITS WITH COOLING CAPACITY GREATER THAN OR EQUAL TO 65 MBH SHALL HAVE MULTI-STAGE CAPABILITY otherwise noted. Diffusers shall be installed as indicated on the drawings and schedules.The Mechanical 6. Set Points shall be as follows: CONFIDENTIAL AND SHALL REMAIN THE SOLE
<br /> PER APPLICABLE ENERGY CODE. Contractor shall provide all miscellaneous items necessary for a complete and proper installation in the type of a. Occupied PROPERTY OF STARBUCKS CORPORATION,
<br /> 11. PROVIDE MERV 13 FILTERS. ceiling and walls used in this project. i. Heating: 70deg F WHICH IS THE OWNER OF THE COPYRIGHT IN
<br /> 12. CALIFORNIA PROJECTS: ECONOMIZER SHALL MEET ALL TITLE 24 REQUIREMENTS. ii. Cooling:72deg F THIS WORK. THEY SHALL NOT BE
<br /> Thermal Insulation b. Unoccupied REPRODUCED (IN WHOLE OR IN PART), SHARED
<br /> Provide external thermal insulation with an integral vapor barrier facing of sufficient thickness to meet local energy i. Heating:60deg F WITH THIRD PARTIES OR USED IN ANY MANNER
<br /> code requirements. Provide insulation on exhaust and outside air ducts,and on concealed portions of supply and ii. Cooling:78deg F ON OTHER PROJECTS OR EXTENSIONS TO THIS
<br /> EXHAUST FANS (EXISTING BY LANDLORD) return air ducts. Do not insulate exposed ductwork and portions of ductwork that are internally lined. Thermal 7. Set three(3)hour occupied override function to provide the following set point overrides: PROJECT WITHOUT THE PRIOR WRITTEN
<br /> insulation to comply with an NFPA flame spread of 25 or less,and smoke developed no greater then 50. a. Heating: +2deg F
<br /> EXTERNAL MOTOR DATA b. Cooling: -2deg F CONSENT OF STARBUCKS CORPORATION.
<br /> AIRFLOW Acoustical Duct Liner THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> MARK LOCATION SERVICE STATIC SONES FAN RPM MANUFACTURER MODEL NUMBER REMARKS Unless otherwise indicated on the plans, provide 1" lass fiber acoustical duct liner on supply and return ductwork INTENDED TO EXPRESS DESIGN INTENT FORA
<br /> (CFM) (IN H2O) (HP) VOLT PH p g PPY
<br /> within 10 feet of the discharge and intake of air handling units. Increate duct sized indicated on plans 2"in each PROTOTYPICAL STARBUCKS STORE(WHICH IS
<br /> dimension to accommodate liner. Liner shall be fastened to duct with mechanical liner fasteners in accordance with SUBJECT TO CHANGE AT ANYTIME)AND DO
<br /> EF-1 ROOF RESTROOM/JAN 275 0.50 - 0.3 115 1 1,139 GREENHECK G-098-B 1-3 SMACNA. NOT REFLECT ACTUAL SITE CONDITIONS.
<br /> REMARKS: NEITHER PARTY SHALL HAVE ANY OBLIGATION
<br /> 1. PROVIDE SOLID STATE SPEED CONTROL. Flexible ductwork NOR LIABILITY TO THE OTHER(EXCEPT STATED
<br /> 2. PROVIDE MOTORIZED BACKDRAFT DAMPER. Flexible ductwork shall only be installed above AC tile ceiling and not above hard lid ceilings. Flexible ductwork ABOVE) UNTIL A WRITTEN AGREEMENT IS
<br /> 3. PROVIDE MINIMUM 12 INCH HEIGHT ROOF CURB. shall not exceed 5'-0"(152CM)in length and two 45°elbows. It shall be pulled taut and appropriately fastened to FULLY EXECUTED BY BOTH PARTIES.
<br /> rigid branch duct&diffuser. Bends shall be minimized and where needed be a full radious bend. Support bands
<br /> shall be installed so as to not crimp flex duct. Flexible ductwork shall meet specification requirements.
<br /> ARCHITECT OF RECORD
<br /> AIR CURTAINS mcg architecture
<br /> 'o L
<br /> HEATER FANS ELECTRICAL oW� �
<br /> LENGTH AIRFLOW TEMP y -
<br /> MARK (IN) (CFM) IN OUT RISE QTY HP CIRCUIT VOLT PH MANUFACTURER MODEL NUMBER REMARKS o
<br /> co M
<br /> (Kw) (MBH) F (QTY) SPECIFICATION NOTES LEED ABBREVIATIONS
<br /> U
<br /> AC-1 42.0 1,418 N/A - - 1 1 2 1 115 1 MARS STD42-1U 1,2 n
<br /> AC-2 36.0 1,379 N/A - - 1 1/2 1 115 1 MARS STD36-1U 1,2 SCOPE CONTRACTOR RESPONSIBILITIESFORBUILDINGCOMMISSIONING # I
<br /> AC-3 36.0 1,379 N A - - 1 1 2 1 115 1 MARS STD36-1 U 1,2 THE INTENT OF THE SPECIFICATIONS AND THE DRAWINGS IS TO PROVIDE A COMPLETE15635 Alton Parkway,Suite 100, Irvine,CA 92618
<br /> CONTRACTOR SHALL PROVIDE SUPPORT AND WORK AS SPECIFIED, NEEDED AND REQUIRED TO 3PL THIRD PARTY LOGISTICS ID INSIDE DIAMETER P: 949.553.1117 F:949.474.7056
<br /> REMARKS: AND FULLY OPERATIONAL MECHANICAL SYSTEM.THE MECHANICAL CONTRACTOR SHALL CONDUCT AND FACILITATE STARBUCKS STAFF BUILDING COMMISSIONING EFFORTS.THIS WORK A L
<br /> 1. PROVIDE AUTOMATIC DOOR SWITCH. FURNISH ALL LABOR, MATERIAL,AND EQUIPMENT NECESSARY TO COMPLETE THE
<br /> MECHANICAL WORK. WILL BE COMPRISED OF THREE DISTINCT EFFORTS: 1)SUPPORT STARBUCKS COMMISSIONING A/C AIR CONDITIONING LL LANDLORD PROFESSIONAL STAMP F Ess�o
<br /> 2. PROVIDE UNIT MOUNTED CONTROL PANEL. AGENT(CXA)DURING INSTALLATION VERIFICATION AND CORRECT DISCLOSED DEFICIENCIES;2) ACT ACOUSTICAL CEILING M '?,p,01 Nq
<br /> SITE EXAMINATION PERFORM TESTING,ADJUSTING, BALANCING AND SYSTEM STARTUP AND SUPPORT FUNCTIONAL TILE MAX MAXIMUM `�� ROY SC
<br /> PERFORMANCE TESTING BY STARBUCKS CXA; 3)CORRECT DEFICIENCIES DISCLOSED BY `t" �y 'yti Fti
<br /> THE MECHANICAL CONTRACTOR SHALL THOROUGHLY EXAMINE ALL AREAS WHERE ADJ ADJUSTABLE
<br /> FUNCTIONAL PERFORMANCE TESTING AND SUBMIT REPORTS. CONTRACTOR SHALL PERFORM MEP MECHANICAL,
<br /> DIFFUSERS, GRILLES AND REGISTERS EQUIPMENT, DUCTWORK,AND PIPING WILL BE INSTALLED AND WILL REPORT ANY AND PROVIDE THE FOLLOWING: AFF ABOVE FINISHED FLOOR ELECTRICAL,AND m z
<br /> CONDITION THAT, IN HIS OPINION, PREVENTS THE PROPER INSTALLATION OF THE AFF ABOVE FINISHED FLOOR PLUMBING" " No M332
<br /> MECHANICAL WORK. A.SYSTEMS SUBJECT TO COMMISSIONING MAY INCLUDE, BUT ARE NOT LIMITED TO, DOMESTIC AMP AMPERE MFR MANUFACTURER
<br /> MARK SERVICE LOCATION CEILING TYPE MOUNTING TYPE MANUFACTURER MODEL NUMBER REMARKS STANDARDS HOT WATER GENERATION, HVAC SYSTEMS, ROOFTOP UNITS, EXHAUST FANS, HVAC CONTROLS, ARCH ARCHITECT
<br /> EQUIPMENT AND MATERIALS SHALL CONFORM WITH THE APPROPRIATE PROVISIONS OF LIGHTING CONTROLS,AIR CURTAINS, BUILT-IN REFRIGERATION EQUIPMENT,AND RENEWABLE B N IN MINIMUM m� MFCHAN�CP�
<br /> D-1 SUPPLY CEILING AC TILE LAY-IN TITUS TDC X 18x18 24x24 3 26 4 1,2 CSA, ULC,ARL,ASME,ASTM, UL, NEMA,ANSI,SMACNA,ASHRAE, NFPA,AS APPLICABLE TO ENERGY SYSTEMS. BOH BACK OF HOUSE NIC NOT IN CONTRACT TF OF CA10F0
<br /> EACH INDIVIDUAL UNIT OR ASSEMBLY. R
<br /> D-2 SUPPLY CEILING GYP. BOARD LAY-IN TITUS OMNI X 24x24 26 D-75 1-3 B.CONTRACTOR SHALL INCLUDE COMMISSIONING ACTIVITIES IN PROJECT SCHEDULE AND SHOW C NL NIGHT LIGHT
<br /> D-3 SUPPLY CEILING GYP. BOARD SURFACE TITUS TDC X 6x6 12x12 3 26 4 D-75 1,2 CODES INTERVALS FOR PERFORMANCE OF WORK FOR WHICH CONTRACTOR IS RESPONSIBLE AND CAB CABINET NTS NOT TO SCALE Date. 02/23/2021
<br /> CONTRACTOR SHALL SHOW
<br /> D-4 SUPPLY CEILING AC TILE LAY-IN TITUS FL10 2 XX 3 / FBPI 10 2 10" 1,4 ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL APPLICABLE INTERVALS FOR WORK PERFORMED BY STARBUCKS CXA. CL CENTER LINE 0
<br /> G-1 RETURN CEILING GYP. BOARD LAY-IN TITUS 350RL XX 3 26 1-3 PROVINCIAL AND LOCAL CODES AND ORDINANCES. IN CASE OF CONFLICT BETWEEN THE RESOURCES FOR PERFORMING ALL WORK RELATED TO COMMISSIONING ACTIVITIES ON A LINE CLG CEILING ITEM IN THE SCHEDULE OF VALUES. OC ON CENTER
<br /> G-2 EXHAUST CEILING GYP. BOARD SURFACE TITUS 350RL XX 1 26 AG-15 1,2 DRAWINGS AND SPECIFICATIONS AND THE CODES AND ORDINANCES,THE HIGHEST CM CONSTRUCTION OD OUTSIDE DIAMETER
<br /> STANDARD SHALL APPLY.THE MECHANICAL CONTRACTOR SHALL SATISFY CODE
<br /> G-3 RETURN CEILING AC TILE LAY-IN TITUS 350RL XX 3 26 1,2 REQUIREMENTS AS A MINIMUM STANDARD WITHOUT ANY EXTRA COST TO STARBUCKS. C.CONTRACTOR SHALL INSTALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S MANAGER OF/CI OWNER
<br /> REQUIREMENTS AND ALL CONTRACT DOCUMENTS. ENSURE THAT ALL EQUIPMENT IS INSTALLED CTR CENTER FURNISHED/CONTRACTO
<br /> REMARKS: TOTALLY COMPLETE,AND ACCESSIBLE TO STARBUCKS CXA FOR INSTALLATION VERIFICATION AND R INSTALLED
<br /> 1. TITUS IS THE BASE OF DESIGN. KRUEGER, PRICE, NAILOR, CARNES ARE EQUAL. NO EXCEPTIONS. PERMITS AND FEES CX COMMISSIONING
<br /> 2. SEE PLAN FOR NECK SIZE. THE MECHANICAL CONTRACTOR SHALL PROCURE AND PAY FOR ALL PERMITS, FEES,AND FUNCTIONAL PERFORMANCE TESTING PRIOR TO THE SCHEDULED START OF INSTALLATION CXA COMMISSIONING AGENT OF/01 OWNER •
<br /> 3. PROVIDE WITH MODEL TRIM FRAME. INSPECTIONS NECESSARY TO COMPLETE THE MECHANICAL WORK. VERIFICATION. FURNISHED/OWNER Q
<br /> 4. SEE PLAN FOR LENGTH. PROVIDE INSULATED PLENUM BOX AS INDICATED IN SCHEDULE. D INSTALLED
<br /> WARRANTY D. INSTALLATION VERIFICATION SHALL BE PERFORMED BY STARBUCKS CXA.CONTRACTOR SHALL DEG DEGREE P
<br /> THE MECHANICAL CONTRACTOR SHALL UNCONDITIONALLY WARRANT ALL WORK TO BE SUPPORT STARBUCKS CXA INSTALLATION VERIFICATION EFFORTS AS NECESSARY. PROVIDE ALL
<br /> ACCESS AND EQUIPMENT NECESSARY FOR STARBUCKS STAFF TO VERIFY THAT THE EQUIPMENT DET DETAIL PD PRODUCTION DESIGNER rrw N
<br /> FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE(1)YEAR IS INSTALLED CORRECTLY. DIA DIAMETER PLC PLACE V
<br /> FROM THE DATE OF FINAL ACCEPTANCE BY STARBUCKS AND WILL REPAIR OR REPLACE DIM DIMENSION 06
<br /> ANY DEFECTIVE WORK PROMPTLY AND WITHOUT CHARGE AND RESTORE ANY OTHER PM PROJECT MANAGER Q N
<br /> E.CONTRACTOR SHALL BE READILY AVAILABLE DURING INSTALLATION VERIFICATION TO DM DESIGN MANAGER Lo
<br /> EXISTING WORK DAMAGED IN THE COURSE OF REPAIRING DEFECTIVE MATERIALS AND CORRECT ANY DEFICIENCIES OR DEFECTS DISCLOSED BY THE INSTALLATION VERIFICATION R Z 0)
<br /> WORKMANSHIP. PROCESS. CORRECTIONS SHALL BE MADE IN A TIMELY MANNER WITHOUT DISRUPTION OF THE EN DOWN R RADIUS co
<br /> LEED CONSTRUCTION SCHEDULE. EA EACH RCM RENOVATIONS U) O Q
<br /> GENERAL 2019 CGREEN CONSTRUCTION . . w � U
<br /> ALL WORK, MATERIALS AND EQUIPMENT SHALL MEET LEED REQUIREMENTS&CODE. IN F.ALL HVAC, EXHAUST FAN,AND AIR CURTAIN EQUIPMENT SHALL BE TESTED,ADJUSTED AND EL ELEVATION MANAGER LJJ � LL
<br /> CASE OF CONFLICT,THE HIGHER STANDARD SHALL APPLY. Q 0
<br /> BALANCED BY THE CONTRACTOR'S TESTING,ADJUSTING AND BALANCE AGENT(SEE TESTING, EQ EQUAL REF REFERENCE
<br /> BUILDING NOTES: ADJUSTING AND BALANCING)AFTER THE SYSTEM IS VERIFIED TO BE COMPLETE AND CORRECT BY EXIST EXISTING REQ `D REQUIRED Z Q
<br /> STARBUCKS CXA, IN ACCORDANCE WITH THE REQUIREMENTS OF THESE DOCUMENTS.ALL HVAC REQ('D) REQUIRE(D) Q
<br /> A. TESTING AND ADJUSTING OF SYSTEMS SHALL BE REQUIRED PER SECTION 5.410.4 FOR BUILDINGS CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT CONTROL DEVICES,COMPONENTS, EXT EXTERIOR REV REVISION U = U O
<br /> WITH FLOOR AREA LESS THAN 10,000 SQUARE FEET. EQUIPMENT AND SYSTEMS ARE CALIBRATED,ADJUSTED AND OPERATE IN ACCORDANCE WITH F RND ROUND W 0 W 00
<br /> 9
<br /> GENERAL MECHANICAL NOTES THESE PLANS AND SPECIFICATIONS.SEQUENCES OF OPERATION SHALL BE TESTED TO ENSURE FF&E "FURNITURE, FIXTURE, S O 0 O
<br /> B. DEVELOP A WRITTEN PLAN OF PROCEDURES FOR TESTING AND ADJUSTING SYSTEMS. SYSTEMS TO THAT THEY OPERATE IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS. DELIVERABLES: AND EQUIPMENT" SB STARBUCKS CC
<br /> BE INCLUDED FOR TESTING AND ADJUSTING SHALL INCLUDE,AS APPLICABLE TO THE PROJECT,THE PRELIMINARY,WRITTEN TESTING AND AIR BALANCE REPORT CONFORMING TO THE FIO FURNISHED AND 0l W 0-
<br /> Scope
<br /> l O G
<br /> SYSTEMS LISTED IN SECTION 5.410.4.2. Sco a REQUIREMENTS SPECIFIED HEREIN, DOCUMENTING THE INFORMATION SPECIFIED, ETC.TO THE SC SOLID CORE
<br /> p INSTALLED BY OWNER SF SQUARE FEET
<br /> C. PERFORM TESTING AND ADJUSTING PROCEDURES IN ACCORDANCE WITH INDUSTRY BEST The intent of the Specifications and the Drawings is to provide a complete and fully operational STARBUCKS CXA IMMEDIATELY UPON COMPLETION OF THE WORK. FLR FLOOR
<br /> mechanical system. The Mechanical Contractor shall furnish all labor,material,and equipment SHT SHEET STORE #: 65246
<br /> PRACTICES AND APPLICABLE NATIONAL STANDARDS ON EACH SYSTEM. necessary to complete the mechanical work. G.CONTRACTOR SHALL INFORM STARBUCKS CXA WHEN EQUIPMENT IS READY FOR FUNCTIONAL FOH FRONT OF HOUSE SIM SIMILAR
<br /> D. BEFORE A NEW SPACE-CONDITIONING SYSTEM SERVING A BUILDING OR SPACE IS OPERATED FOR Site Examination PERFORMANCE TESTING.ALL EQUIPMENT SHALL BE READY FOR FUNCTIONAL PERFORMANCE FT FOOT/FEET SPEC SPECIFICATION PROJECT#: 88584-001
<br /> The Mechanical Contractor shall thoroughly examine all areas where equipment,ductwork,and TESTING PRIOR TO STARTING TESTING.CONTRACTOR SHALL OPERATE EQUIPMENT FOR
<br /> NORMAL USE,THE SYSTEM SHOULD BE BALANCED IN ACCORDANCE WITH THE PROCEDURES DEFINED 9 YG SQ SQUARE PROFILE TYPE: CORE
<br /> piping will be installed and will report any condition that, in his opinion, prevents the proper STARBUCKS CXA AND VERIFY BY DEMONSTRATION THE CORRECT OPERATION OF EQUIPMENT, GC GENERAL CONTRACTOR
<br /> BY NATIONAL STANDARDS LISTED IN SECTION 5.410.4.3.1. installation of the mechanical work. RESPONSE OF SENSORS,AND PROPER EXECUTION OF HVAC CONTROL AND LIGHTING T ISSUE DATE:
<br /> H
<br /> SEQUENCES; INCLUDING BUT NOT LIMITED TO,AIR MOVEMENT,TEMPERATURE,SOUND,AND TEMP TEMPORARY PROGRAM MANAGER:
<br /> E. AFTER COMPLETION OF TESTING,ADJUSTING,AND BALANCING, PROVIDE A FINAL REPORT OF Standards CONTROL RESPONSE. PROVIDE ANY SECURITY ACCESS, HARDWARE,SOFTWARE,OR OTHER HC HOLLOW CORE TYP TYPICAL STORE DESIGNER: J. RAMOS
<br /> TESTING SIGNED BY THE INDIVIDUAL RESPONSIBLE FOR PERFORMING THESE SERVICES. Equipment and materials shall conform with the appropriate provisions of CSA, ULC,ARL,ASME, SUPPORT AS NEEDED FOR THE STARBUCKS CXA TO EFFICIENTLY WITNESS AND DOCUMENT ALL HDW HARDWARE
<br /> ASTM, UL, NEMA,ANSI, SMACNA,ASHRAE, NFPA,as applicable to each individual unit or EQUIPMENT TESTING.STARBUCKS CXA WILL RECORD THE EQUIPMENT OPERATION AND U LEEDO AP: N/A
<br /> F. PROVIDE THE BUILDING OWNER WITH DETAILED OPERATING AND MAINTENANCE INSTRUCTIONS AND assembly. HM HOLLOW METAL LION UNLESS OTHERWISE
<br /> RESPONSE TO TESTING SEQUENCES AND PREPARE A LIST OF ANY DEFICIENCIES DISCLOSED BY HORIZ HORIZONTAL CHECKED BY: GRS
<br /> COPIES OF GUARANTIES/WARRANTIES FOR EACH SYSTEM PRIOR TO FINAL INSPECTION. Codes THE FUNCTIONAL PERFORMANCE TESTS FOR CORRECTION BY THE CONTRACTOR. EQUIPMENT NOTED
<br /> All work shall be performed in strict accordance with all applicable provincial and local codes and INCLUDES, BUT IS NOT LIMITED TO,AIR HANDLING UNITS, ROOFTOP AND SPLIT TYPE,CONDENSING HR HOUR V MCG PROJECT#: 20009
<br /> G. INCLUDE A COPY OF ALL INSPECTION VERIFICATIONS AND REPORTS REQUIRED BY THE ENFORCING ordinances. In case of conflict between the drawings and specifications and the codes and UNITS, EXHAUST FANS, LIGHTING CONTROLS, ETC. DELIVERABLES: PROVIDE COMPLETED COPIES HT HEIGHT VD VENDOR DIRECT MCG PROD. MANAGER: C.LEE
<br /> AGENCY. ordinances,the highest standard shall apply. The Mechanical Contractor shall satisfy code OF ALL START UP REPORTS, FILLED OUT ON THE MANUFACTURERS'FORMS,TO THE STARBUCKS HVAC "HEATING,VENTILATING, VERT VERTICAL MCG PROJ. SPECIALIST: S. PARK
<br /> requirements as a minimum standard without any extra cost to Starbucks. CXA AND AIR CONDITIONING"
<br /> H. HVAC EQUIPMENT USED DURING CONSTRUCTION SHALL USE RETURN AIR FILTERS WITH A MERV 8, VIF VERIFY IN FIELD
<br /> BASED UPON ASHRAE 55.2-1999, OR AN AVERAGE EFFICIENCY OF 30%BASED UPON ASHRAE 52.1-1992. Permits and Fees H.CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ISSUES OR DEFICIENCIES DISCLOSED Revision Schedule
<br /> ALL FILTERS SHALL BE REPLACE PRIOR TO OCCUPANCY. The Mechanical Contractor shall procure and pay for all permits,fees,and inspections necessary to
<br /> complete the mechanical work. DURING THE FUNCTIONAL PERFORMANCE TESTING PROCESS.CORRECTIONS SHOULD BE MADE IN
<br /> I. AT THE TIME OF ROUGH INSTALLATION OR DURING STORAGE ON THE CONSTRUCTION SITE AND UNTIL Warranty A TIMELY MANNER WITHOUT DISRUPTION TO THE SYSTEM AND CONSTRUCTION SCHEDULE. Rev Date By Description
<br /> FINAL STARTUP OF THE HEATING AND COOLING EQUIPMENT,ALL DUCT AND OTHER RELATED AIR The Mechanical Contractor shall unconditionally warrant all work to be free of defects in material I.CONTRACTOR SHALL BE READILY AVAILABLE FOR ANY RE-TESTING OF EQUIPMENT DEEMED
<br /> DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, SHEETMETAL OR and workmanship for a period of one(1)year from the date of final acceptance by Starbucks and NECESSARY BY STARBUCKS CXA DURING INSTALLATION VERIFICATION AND FUNCTIONAL
<br /> OTHER METHODS ACCEPTABLE TO THE ENFORCING AGENCY TO REDUCE THE AMOUNT OF DUST OR will repair or replace any defective work promptly and without charge and restore any other existing PERFORMANCE TESTING.CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ISSUES OR
<br /> DEBRIS WHICH MAY COLLECT IN THE SYSTEM. work damaged in the course of repairing defective materials and workmanship.
<br /> DEFICIENCIES FOUND IN THE SYSTEM DURING ANY AND ALL RE-TESTING. CORRECTIONS SHOULD
<br /> BE MADE IN A TIMELY MANNER WITHOUT DISRUPTION TO THE SYSTEM AND CONSTRUCTION
<br /> J. IN MECHANICALLY VENTILATED BUILDINGS, PROIDE REGULARLY OCCUPIED AREAS OF THE BUILDING SCHEDULE. DELIVERABLES: FINAL BALANCE REPORT, DEFICIENCIES LIST NOTING CORRECTIVE _
<br /> WITH AIR FILTRATION MEDIA FOR OUTSIDE AND RETURN AIR PRIOR TO OCCUPANCY THAT PROVIDES AT ACTIONS PERFORMED BY CONTRACTOR IN RESPONSE TO INSTALLATION VERIFICATION AND SHEET TITLE:
<br /> LEAST A MERV OF 11. FUNCTIONAL PERFORMANCE TEST RESULTS.
<br /> K. INSTALLATIONS OF HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT SHALL COMPLY TESTI N G,ADJ U ST I N G,BALAN C I N G. J.CONSTRUCTION AND POST CONSTRUCTION TESTING:ADDITIONAL TESTING MAY BE REQUIRED HVAC SCHEDULES AN
<br /> WITH SECTIONS 5.508.1.1 AND 5.508.1.2. BY LEED AND OTHER PROCESSES THAT MAY OCCUR OUT OF SEQUENCE WITH COMMISSIONING
<br /> �F ,FICATIONS
<br /> Mechanical Contractor or an Independent Air balance Contractor shall accuratelybalance the air SERVICE. CONTRACTOR SHALL CONDUCT, DOCUMENT,SUPPORT AND SCHEDULE THIS TESTING °°°°°°°°°= SCAL S
<br /> L. INSTALL HVAC AND REFRIGERATION EQUIPMENT THAT DOES NOT CONTAIN CFCS. and hydronic(where applicable)systems to provide air and water quantities(whre applicable) AS DIRECTED BY STARBUCKS CXA.
<br /> M. INSTALL FIRE SUPPRESSION EQUIPMENT THAT DOES NOT CONTAIN HALONS. indicated on the drawings and in this specification. Operate automatic controls system and verify Schnackel SHEET NUMBER:
<br /> set points.A NEBB or AABC Certified Supervisor shall be in charge of work.Submit two(2)copies K.CONTRACTOR TO ENSURE DUCT SMOKE DETECTORS ARE INSTALLED UNDER THE SUPERVISION engineers,
<br /> of the balance report to the Engineer for approval. Include a copy of the balance report as OF BUILDING FIRE DETECTION OR ALARM SYSTEM WHEN THE BUILDING IS EQUIPPED WITH SUCH BOO-581-0963
<br /> approved by the Engineer with application for final contract payment. SYSTEM. wWWAChrM-0001
<br /> BE JOBM 200472
<br />
|