Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer N Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ® Vacuum ❑ Hydrostatic <br /> Test Equipment Used: 0-30inHg. 4" Vacuum Gauges w/0.05 graduations <br /> Tank ID 91 / Diesel /91 <br /> Tank Manufacturer Trusco <br /> Tank Capacity 3k/4k/5k <br /> Test Start Time 9:OOam <br /> Initial Reading -10.0 inHg <br /> Test End Time 10:OOam <br /> Final Reading -10.0 inHg <br /> Change in Reading 0.0 inHg <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by M Manufacturer M Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Dual 0-15psi 4" Pressure Gauges w/0.05 graduations <br /> Pipe Run ID 91 South 91 North <br /> Pipe Manufacturer Ameron Ameron <br /> Test Start Time 9:OOam 9:OOam <br /> Initial Reading 5.Opsi 5.Opsi <br /> Test End Time 10:OOam 10:00am <br /> Final Reading 5.Opsi 5.Opsi <br /> Change in Reading O.Opsi O.Opsi <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results N Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />