Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> Additional copies of this page may be attached. <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ® Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum M Hydrostatic <br /> Test Equipment Used: F.F.S. Incon TS-STS Sump Tester w/ + or—0.002" graduations <br /> Sump/UDC ID 91 South 91 North <br /> Sump Manufacturer Bravo Bravo <br /> Sump Depth (inches) 36" 36" <br /> Sump Bottom to Top of 20" 20" <br /> Highest Pipe Penetration <br /> inches <br /> Test Start Time 9:58am 9:58am <br /> Initial Reading 6.8156" 3.6540" <br /> Test End Time 10:13am 10:13am <br /> Final Reading 6.8154" 3.6537" <br /> Change in Reading -0.0002" -0.0003" <br /> Pass/Fail Criteria + or—0.002" + or— 0.002" + or— 0.002" + or— 0.002" <br /> Tightness Test Results ® Pass ❑ Fail M Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria + or— 0.002" + or— 0.002" + or— 0.002" + or— 0.002" <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />