Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for DIAMOND GAS AND FOOD MART as of August 24, 2022. <br /> Open violations from June 14, 2022 inspection <br /> Violation#115-Failure to submit"Monitoring System Certification Form"within 30 days of completion of <br /> the test. <br /> OBSERVATION:A monitoring system certification, leak detector testing, and spill container testing were performed <br /> on 06/03/2021. A test report has not been submitted to the EHD or the California Environmental Reporting System <br /> (CERS). <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the test. <br /> CORRECTIVE ACTION: Immediately provide this report to the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#116-Failure to submit the"Spill Container Testing Report Form"within 30 days. <br /> Observation:The spill container testing were performed on 06/03/2021. A test report has not been submitted to the <br /> EHD or the California Environmental Reporting System (CERS). <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the test. <br /> CORRECTIVE ACTION: Immediately provide this report to the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#122-Failure to implement corrections and submit written response within 30 days of receiving <br /> the report. <br /> OBSERVATION:An inspection was last done on 06/03/2021 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 07/03/2021. This information has not been received resulting in a non-compliant status for this facility. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> Page 2 of 5 <br />