Laserfiche WebLink
EXISTING PLUS PROJECT PLUS BUILDOUT <br /> Charter Way and Fresno Avenue Widen all approaches; add signal <br /> phase <br /> Charter Way and Argonaut Street Widen Charter Way approaches; <br /> i signalize (3-phase) <br /> Charter Way and Stockton Street Widen all approaches <br /> Eighth Street and Fresno Avenue Widen Eighth Street approaches <br /> and SB Fresno approach <br /> Eighth Street and Argonaut Street Install 3-way stop signs; widen <br /> Eighth Street approaches <br /> Eighth Street and Stockton Street Install 3-way stop signs; widen <br /> Eighth Street approaches <br /> Eighth Street and Lever Boulevard Install 3-way stop signs; widen <br /> J Eighth Street approaches <br /> Eighth Street and Manthey Road Signalize (3-phase) ; widen all <br /> approaches; alternative - <br /> reroute Manthey to intersect <br /> Lever Boulevard <br /> i Eighth Street and I-5 SB ramps Signalize (3-phase) <br /> Eighth Street and I-5 NB ramps Signalize (3-phase) <br /> PUBLIC SERVICES <br /> Police Insufficient staff and vehicles Suggest that City establish and <br /> to service project collect a fee at building permit <br /> to augment services based upon <br /> $134 per capita. However, since <br /> there is not existing City ordinance <br /> to provide for said fee, no mitiga- <br /> tion measures exist and, therefore, <br /> i a Statement of Overriding Considera- <br /> tions is required. <br />