Laserfiche WebLink
! Schools Accumulative impact of this and Developer pay recently adopted <br /> other proposals is beyond the impaction fees and investigate <br /> physical capability of the school the feasibility of reserving a <br /> district to handle such growth. school site. Since this will <br /> only- partially mitigate the impacts, <br /> a Statement of Overriding Considera- <br /> tions is required. <br /> Storm Drainage Increased runoff, present system Developer-financed drainage system <br /> inadequate to handle existing for the project, including new <br /> development. pumping facility because of lack <br /> of sufficient capacity in existing <br /> system. <br /> j B. LESS THAN SIGNIFICANT IMPACTS <br /> i <br /> Growth Inducement Potentially make land lying north None. The land is zoned and <br /> of Eighth Street attractive for planned for urban use. <br /> development. <br /> Soils Some moderate to highly expansive Provide suitable design measures <br /> soils exist on site. for congtruction. <br /> + Water Supply A site for water storage may be Provide site for facility if <br /> i necessary to maintain adequate study determines need. <br /> supply and fire protection pressures. <br /> j Telephone Service Inadequate facilities to handle Developer should notify utility <br /> added load, need to budget for as to when service would be <br /> increase 2 - 3 years ahead. needed and enter agreement per <br /> P.U.C. rules. <br /> r <br /> Recreation Community park facilities near Pay in lieu fees as established. <br /> project need to be upgraded. Grant fee title to Lot A to the <br /> City, subject to reservation of <br /> specified easement rights. <br /> Sanitary Sewer The project will have a cumula- The City's Municipal Utilities <br /> tive adverse effect on the capacity Department has indicated that there <br /> of the City's regional wastewater is adequate capacity within the treat- <br /> treatment facility and on existing ment plant and sewer line to accom- <br /> line capacities. modate the project without significant <br /> adverse effects. <br />