My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 4:00:04 PM
Creation date
2/10/2022 9:06:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0516526
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0012659
FACILITY_NAME
LOVES COUNTRY STORES OF CALIFORNIA #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1553 COLONY RD RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WESTERN PUMP <br /> Petroleum & Lubrication Equipment Specialists <br /> 3. If self-rescue or partner assisted rescue is not possible a boom lift or other <br /> machinery shall be used to access the fallen worker from the ground level . If <br /> machinery cannot reach the worker and no other rescue method will work <br /> emergency medical responders are to be notified immediately . <br /> 4. Workers are to be rescued in a safe and quick manner. Once a worker has been <br /> rescued they will be required to see a physician for an examination to ensure that <br /> no damage has been done . <br /> 5. Any incident involving a rescue must be immediately reported to the Safety <br /> Manager, at which time an incident investigation will take place . <br /> Training <br /> A Competent Person shall provide training to Company workers under the following <br /> circumstances : <br /> 1 . When a worker is first hired . <br /> 2 . When new or different equipment is purchased or utilized . <br /> 3 . When a worker shows signs that they do not understand the fall hazards of theirjob . <br /> 4. Annually for all workers <br /> Fall Protection Project Hazard Assessment Checklist <br /> Completed by (Competent Person): Date: <br /> Company: Project name: <br /> A. Identify the type of hazard (s) , by placing a check in the appropriate box, below. Include the <br /> approximate fall distance. <br /> Hazard Description Fall Distance (ft) <br /> Roof <br /> Leading edge <br /> Sky light <br /> Balcony <br /> Elevator shaft <br /> Floor opening (greater than 12") <br /> Wall opening (greater than 18") <br /> Excavation <br /> Utility (vault, man hole, etc.) <br /> Other (describe) : <br /> 3235 "F" Street, San Diego, CA 92102-3315 * 619-239-9988 Fax 619-239-9925 <br /> NmJw.westernpump . com <br /> California Contractor's License #673853 <br /> California Certified Small Business #33547 <br />
The URL can be used to link to this page
Your browser does not support the video tag.