Laserfiche WebLink
ELECTRICAL SCOPE OF WORK 6. DISPENSERS CHANGES IN DIRECTION LATERALLY CONDUIT RUNS BELOW GRADE OR SLAB 3. JOINTS, TAPS,AND SPLICES: <br /> SHALL BE MADE WITH LONG RADIUS CONDUIT BENDS. LONG RADIUS BENDS <br /> DOUBLE WALL TANKS RUN CONDUITS AND WIRES WITH GROUND FOR A.C. CIRCUITS (A.C.AND D.C.AS AND OFFSETS SHALL BE NOT LESS THAN TEN TIMES THE NOMINAL DIAMETER JOINTS AND TAPS ON LARGE CABLES, #4 AWG OR LARGER, SHALL BE MADE <br /> REQUIRED)TO FUELING ISLANDS AND CONNECT DISPENSERS IF NEW OR OF THE CONDUIT. CONDUIT BENDS 1"OR LARGER OF NOT MORE THAN 45- WITH T& B, OR BURNDY SOLDER LESS LUGS AND CONDUCTORS OR EQUAL. <br /> INSTALLATION-REPLACEMENT AND MISCELLANEOUS REPLACE EXISTING CIRCUITS TO EXISTING DISPENSERS AS SHOWN IN THE G.A. DEGREE DEFLECTION MAY BE MADE WITH A BENDING MACHINE(NOT A HICKEY) JOINTS IN BRANCH CIRCUIT WIRING SHALL BE MADE MECHANICALLY AND <br /> PLAN OR AS INDICATED BY THE OWNER REPRESENTATIVE. VERIFY ON THE JOB; 90-DEGREE BENDS SHALL BE LONG RADIUS FACTORY BENT. ELECTRICALLY SECURE. <br /> I. GENERAL REQUIREMENTS PRIOR TO SUBMITTING THE BID QUOTATION. STANDARD RADIUS ELBOWS MAY BE USED TO BRING UNDERGROUND CONDUITS <br /> ABOVE GROUND. UNLESS PROPERLY INSULATED BY THE CONNECTOR,ALL JOINTS SHALL BE <br /> THIS SECTION COVERS THE REQUIREMENTS FOR THE COMPLETE INSTALLATION TAPED WITH SCOTCH ELECTRICAL TAPE#33 AND COVERED BY ONE LAYER OF <br /> AND TESTING OF THE ELECTRICAL DISTRIBUTION OF POWER, CONTROLS AND 3. HAZARDOUS AREA: FRICTION TAPE IN A MANNER WHICH SHALL MAKE THE INSULATION OF THE HARRISON FRENCH <br /> DEVICES SHOWN IN THESE CONSTRUCTION DOCUMENTS NECESSARY TO INSTALL III. MATERIALS JOINT EQUAL TO THAT OF THE CONDUCTOR. & ASSOCIATES , LTD <br /> NEW OR REPLACE THE EXISTING UNDERGROUND STORAGE TANKS AND RELATED CONSTRUCTION SHALL BE OF THE EXPLOSION-PROOF TYPE. THIS SHALL INCLUDE THE <br /> EQUIPMENT AT THE SITE REFERRED TO IN THE CONTRACT DOCUMENTS AND 1. GENERAL: INSTALLATION OF UNDERWRITERS' LABORATORIES, INC.APPROVED HOT DIPPED RIGID CARE SHALL BE EXERCISED WHEN MAKING JOINTS AT CONDOLE TYPE FITTINGS 1705 S.Walton Blvd.,Suite 3 <br /> THE DRAWINGS FURNISHED BY OWNER. UNLESS NOTED OTHERWISE ON THE DRAWINGS,AND LISTED STEEL CONDUITS, CAST METAL BODY(FERROUS METAL)FITTINGS, GASKETED COVERS SO THAT JOINTS WILL NOT BE FORCED INTO THE CONDUITS IN A MANNER Bentonville,Arkansas 72712 <br /> 1. CODES: BY UNDERWRITERS' LABORATORIES, INC.,WHEREVER STANDARDS HAVE BEEN AND SEAL-OFFS WITH SEALING COMPOUND. CONDUIT SEALS SHALL BE ACCESSIBLE. WHICH MIGHT INJURE THE JOINT OR BREAK THE INSULATION OF THE WIRES. t 479.273.7780 <br /> ESTABLISHED AND LABEL SERVICE IS REGULARLY FURNISHED BY THAT NO SPLICES OF ANY KIND WILL BE PERMITTED IN SEALING FITTINGS. f 888.520.9685 <br /> ALL WORK DONE UNDER THIS SPECIFICATION SHALL COMPLY WITH THE AGENCY. NO SUBSTITUTIONS SHALL BE MADE FOR MATERIALS SHOWN OR THREADED COVERS AND GROUND JOINTS OF ALL EXPLOSION--PROOF FITTINGS Nvww.hfa-ae.com <br /> MOST RIGID REQUIREMENTS OF THE LATEST EDITIONS OF THE NATIONAL SPECIFIED BY MANUFACTURERS' NAMES OR CATALOG NUMBERS WITHOUT PRIOR SHALL BE GREASED WITH U/L APPROVED COMPOUND BEFORE FINAL ASSEMBLY. CONDUCTORS SHALL BE CONTINUOUS FROM OUTLET TO OUTLET AND NO SPLICES <br /> ELECTRICAL CODE, AND ALL APPLICABLE STATE, COUNTY,AND CITY WRITTEN APPROVALS OF OWNER. OR JOINTS WILL BE PERMITTED IN EITHER FEEDERS OR BRANCHES EXCEPT <br /> CODES, LAWS AND REGULATIONS. SEALING FITTINGS SHALL BE INSTALLED AND SEALED IN ACCORDANCE WITH AT OUTLETS OR ACCESSIBLE JUNCTION BOXES. w z w w <br /> THE MANUFACTURER'S SPECIFICATIONS. cn w J�3:= a <br /> WHERE THE WORDS"OF EQUAL", "APPROVED", OR WORDS OF SIMILAR MEANING w iZa 0�z o z w } <br /> ALL JOINTS AND SPLICES IN CABLE SHALL BE MADE IN ACCORDANCE WITH 0o a a= <br /> NOTHING IN THESE SPECIFICATIONS SHALL RELIEVE THE CONTRACTOR ARE USED, THEY SHALL BE INTERPRETED AS MEANING EQUAL IN THE OWNER'SD °a W v z w w°z <br /> FROM FULL COMPLIANCE WITH THE APPLICABLE PORTIONS OF THE OPINION. APPROVAL SHALL BE OBTAINED IN WRITING BEFORE A SUBSTITUTION THE CABLE MANUFACTURERS SPECIFICATION. w z <br /> ABOVE REGULATIONS, NOR ANY OTHER PROVISIONS, CODES, OR 4. CONDUIT SUPPORTS: a O�_W a o a w=oo a w <br /> IS MADE. sad-� <br /> REGULATIONS HAVING JURISDICTION PERTAINING TO WORK BEING O o w�w=a N o o� <br /> INSTALLED UNDER THIS SECTION. APPROPRIATE CLAMPS, HANGERS, U-BOLTS, STRAPS AND SPACERS SHALL BE 4. WIRE SIZES AND TYPES: N W Q w w w o g <br /> 2. CONDUITS: Z a t=o o w n w <br /> USED ON STEEL STRUCTURES. ALL CONDUITS SHALL RIGIDLY SECURED IN _O �U w N- cwi w W w a <br /> 2. DRAWINGS: POSITION WITH MINIMUM CODE SPACING OR SUPPORTS. ALL WIRE AND CABLE SIZES AND TYPES SHALL COMPLY WITH THE NATIONAL z 0 N a W W w g w o°z <br /> CONDUITS SHALL BE DELIVERED TO THE JOB SITE LABELED AND IN ORIGINAL BUNDLES. ELECTRICAL CODE. REFER TO THE CONSTRUCTION DRAWINGS AND FOLLOW J U a o O�w of J K u-LA K <br /> ALL CONDUIT SHALL BE PVC EXCEPT @CLASSIFIED AREAS. PROVIDE THREADED RIGID 5. STORAGE AREA CONDUITS; THE BEST TRADE PRACTICE. a o w o awi a w W w w z W <br /> THE DRAWINGS MAY OR MAY NOT BE COMPLETE AS TO DETAILS,AND W w a? <br /> METAL CONDUITS AT CLASSIFIED AREAS, 10'-0"MINIMUM, IN EARTH TRENCH EACH ENDS a z�w a fro o 3 a 0z <br /> SHALL BE USED IN CONJUNCTION WITH THESE SPECIFICATIONS,AS OF RUNS WITH PVC CONDUITS IN BETWEEN. PROVIDE GROUNDING CONDUITS PER mc)o a O o�x z w w o <br /> � HOU�wOLLaawGaU <br /> INDICATIVE OF THE SCOPE OF WORK SHOWING THE LOCATION AND CODE. PROVIDE METAL COATED CONDUITS AT CORROSIVE SOIL LOCATIONS. UNDERGROUND RUNS SHALL BE SUFFICIENTLY BELOW GRADE(24" MINIMUM) VI. GROUNDING <br /> GENERAL INSTALLATION DETAILS OF ALL ELECTRICAL SYSTEMS. CONTRACTOR TO REFER TO GEO TECHNICAL REPORT SI OWNER'S SPECIFICATION BOOK TO GUARD AGAINST INJURY DURING BACKFILL, ETC. . . .AND BE SO <br /> ARRANGED AS TO AVOID INTERFERENCE WITH OTHER UNDERGROUND LINES OR 1. GROUNDING WILL BE PROVIDE IN ACCORDANCE WITH ALL APPLICABLE <br /> 3. DESIGN: FOR SOILS RESISTIVELY. <br /> FOUNDATIONS. REGULATORY CODES. <br /> THE ENTIRE RUN OF CONDUITS SERVING THE HAZARDOUS AREAS SHALL BE RIGID AND 2. THE FOLLOWING SHALL BE GROUNDED: NON-CURRENT CARRYING METAL PARTS N <br /> ALL SCALED AND FIGURED DIMENSIONS ARE APPROXIMATE AND ARE SHALL MEET THE GROUNDING AND BONDING REQUIREMENTS OF NEC 250.100. PVC c <br /> GIVEN FOR ESTIMATION PURPOSES ONLY. BEFORE PROCEEDING WITHCONDUIT WILL ONLY BE ALLOWED FOR UNDERGROUND PORTIONS IF ALL PROVISIONS 6. PULL AND JUNCTION BOXES: OF ELECTRICAL APPARATUS AND INSTRUMENTS, METALLIC CONDUIT, MACHINERY, 00 <br /> ANY WORK,THE CONTRACTOR SHALL CAREFULLY CHECK AND VERIFY ALL OF NEC 514.8 EXCEPTION 2 ARE MET. MECHANICAL EQUIPMENT, MOTORS, STRUCTURAL STEEL,AND ENCLOSURE FENCES. N <br /> LOCATIONS, DIMENSIONS, SIZES, ETC.,AND SHALL BE RESPONSIBLE IN LONG RUNS OF CONDUIT, SUFFICIENT PULL BOXES SHALL BE USED TO c <br /> . <br /> FOR THE FITTINGS OF HIS MATERIALS AND EQUIPMENT TO THE FACILITATE PULLING WIRES AND CABLESALL PULL BOXES SHALL BE OF 3. CONNECTIONS: C7 <br /> EQUIPMENT OF OTHER CRAFTS AND THE STRUCTURES. AMPLE DIMENSIONS AND SHALL BE ACCESSIBLE WHEN THE WORK IS COMPLETED. N v LU <br /> 3. CONDUCTORS, WIRE SIZE AND CABLES: GROUNDING CONDUCTORS SHALL TERMINATE ON APPROVED GROUND LUGS. Q CV w <br /> WHERE PULL BOXES ARE INSTALLED IN EXPOSED LOCATIONS, LOCATIONm <br /> 4. SHOP DRAWINGS: <br /> GROUND CONNECTIONS SHALL BE MADE WITH EVERDUR BOLTS, NUTS,AND U � <br /> SHALL BE APPROVED BY THE OWNER REPRESENTATIVE. <br /> ALL WIRE AND CABLE FURNISHED BY CONTRACTORS SHALL BE NEW, BEAR THE LOCK WASHERS. UNDERGROUND SPLICES AND INACCESSIBLE CONNECTIONS TO <br /> SHOP DRAWINGS BY AN OUTSIDE VENDOR, SHALL BE CHECKED AND LABEL OF THE UNDERWRITERS' LABORATORIES, INC.,AND BROUGHT TO THE GROUND SHALL BE MADE ONLY BY THE CADWELD PROCESS. Z W J U <br /> BUILDING SITE IN UNBROKEN PACKAGES OR REELS. 7. MOISTURE AND CONDENSATION: 0 W <br /> APPROVED BY THE CONTRACTOR TO COMPLY WITH THE CONSTRUCTION O O w <br /> DRAWINGS AND THESE SPECIFICATIONS. 4. CONDUCTORS: 0 <br /> POWER,AND CONTROL CONDUCTORS FURNISHED BY THE CONTRACTOR AT LOCATIONS WHERE EXCESSIVE MOISTURE IS PRESENT OR CONDENSATION <br /> SHALL BE COPPER 600 VOLT, CLASS THWN INSULATED, UNLESS OTHERWISE IS LIKELY TO TAKE PLACE, I.E., PLANTER AREAS, PROVISIONS SHALL BE a <br /> 5. GENERAL REQUIREMENTS SPECIFIED. MADE FOR THE DRAINAGE OF THE CONDUIT SYSTEM BY THE INSTALLATION OF ALL UNDERGROUND GROUNDING CONDUCTORS SHALL BE INSULATED COPPER. <br /> DRAIN TYPE FITTINGS AND BREATHERS IN CONDUITS,JUNCTION BOXES, OR ALL CONDUCTOR SHALL BE PROTECTED FROM MECHANICAL INJURY AND BE <br /> A. ELECTRICAL SYSTEM LAYOUTS INDICATED THE LOCATIONS OF THE DRAWINGS NO WIRE SMALLER THAN NO. 12 AWG WILL BE USED FOR POWER CIRCUITS OTHER LOW POINTS. RIGIDLY SUPPORTED ON STRUCTURES. <br /> ARE GENERALLY DIAGRAMMATIC AND Ty <br /> OUTLETS AND EQUIPMENT ARE APPROXIMATE. EXACT ROUTING 600 VOLT AND BELOW, UNLESS SPECIFIED. CONTROL WIRES SHALL BE NO. <br /> OF CONDUITS, WIRING,AND THE PLACEMENT OR EQUIPMENT <br /> 16 AWG AND SIGNAL/DATA/INTRINSICALLY SPECIFIED BY THE EQUIPMENT 8. MISCELLANEOUS: 5. CONDUIT: M <br /> ('� w <br /> SHALL BE GOVERNED BY THE LOCATION OF OBSTRUCTIONS SUPPLIER. CONDUCTORS#10 AWG AND SMALLER SHALL BE SOLID AND ALL <br /> AND THE STRUCTURAL CONDITIONS. WIRING FOR EQUIPMENT CONDUCTORS#8 AND LARGER SHALL BE STRANDED. ALL CONDUITS SHALL BE PERMANENTLY BONDED TO THE SYSTEM GROUND <br /> REQUIRING MAINTENANCE OR INSPECTION SHALL BE READILY CONDUIT SHALL BE CUT SQUARE AND ALL ENDS SHALL BE REAMED. ALL BY LOCKNUTS&ALREADY HAVE GROUND WIRE. 10' RIGID MIN. EA. END Q <br /> ACCESSIBLE. 4. CONDUIT FITTINGS,AND OUTLETS: CONDUIT ENDS SHALL BE THREADED WITH A MINIMUM OF FIVE FULL THREADS. WITH PVC AT CENTER. 0 <br /> NO RUNNING THREADS SHALL BE PERMITTED. JOINTS SHALL BE MAKE UP VII. TESTS <br /> B. THE CONTRACTOR SHALL FABRICATE, ERECT, INSTALL, ALL FITTINGS IN CLASS I, DIVISION I, SHALL BE EXPLOSION-PROOF WITH RED OR WHITE LEAD. <br /> CONNECT,AND TEST ALL ELECTRICAL INSTALLATIONS, TYPE, U/L APPROVED FOR CLASS I, GROUP D, DIVISION I SERVICE. 1. ALL LABOR, MATERIALS, INSTRUMENTS,AND TOOLS FOR THE VARIOUS TESTS <br /> SYSTEMS,AND EQUIPMENT AS SHOWN ON THE DRAWINGS. ALL TEMPORARY ENDS OF CONDUIT SHALL BE PLUGGED DURING CONSTRUCTION. SHALL BE FURNISHED BY CONTRACTOR. <br /> ALL UNUSED TAPS IN CONDUITS, FITTINGS, ETC. . ., SHALL BE EQUIPPED <br /> C. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL RACKS, 5. MISCELLANEOUS: WITH RECESSED HEAD GALVANIZED CONDUIT PLUGS. 2. THE ENTIRE ELECTRICAL INSTALLATION SHALL BE FREE FROM SHORT CIRCUITS <br /> BRACKETS, SUPPORTS, PUSHBUTTON SUPPORTS, HANGERS, AND IMPROPER GROUNDS. ALL CIRCUITS SHALL BE MEGGERED BEFORE BEING o <br /> AND BRACING INCLUDING CONCRETE PEDESTALS, FOUNDATIONS, CONTRACTOR SHALL FURNISH STRUCTURAL STEEL SECTIONS AND ANGLE BARS, ANY SPARE CONDUITS SHALL BE TERMINATED WITH A COUPLING AND A ENERGIZED AND CHECKED FOR PROPER OPERATION BEFORE BEING CONNECTED <br /> STRUCTURES,AND ANCHOR BOLTS, NEEDED TO SUPPORT ALL UNISTRUT SECTIONS, CONDUIT, CONDUIT BENDS, CONDUIT FITTINGS, GALVANIZED CONDUIT PLUG WITH A NYLON PULL WIRE. TO THEIR RESPECTIVE LOADS. O <br /> ELECTRICAL EQUIPMENT, MATERIAL, FIXTURES AND ELECTRIC WIRE, SWITCHES, RECEPTACLES, BOXES,AND ALL OTHER MATERIALS <br /> INSTRUMENTS TO ASSURE A STABLE AND WORKMANLIKE JOB NECESSARY FOR SYSTEM OPERATION. THE ENTIRE CONDUIT WORK SHALL BE FISHED, SNAKED,AND CLEANED 3. THE CONTROL SYSTEM SHALL BE TESTED AND PUT INTO OPERATING CONDITION <br /> WHETHER OR NOT SHOWN IN DETAIL ON THE DRAWINGS,AND BEFORE PULLING IN WIRES OR CABLES. AND SHALL BE SET AND ADJUSTED AS TO GIVE PROPER CONTROL AND <br /> SHALL MOUNT ALL ELECTRICAL EQUIPMENT, FIXTURES AND CONTRACTOR SHALL FURNISH ALL OTHER MATERIALS INCIDENTAL TO THE INDICATION OF MECHANICAL EQUIPMENT IN OPERATING SERVICE, TO THE <br /> INSTRUMENTS AS SPECIFIED OR SHOWN ON THE DRAWINGS. WORK WHETHER OR NOT SHOWN ON THE DRAWINGS, INCLUDING BUT NOT V. CONDUCTOR INSTALLATION SATISFACTION OF THE OWNER REPRESENTATIVE. <br /> LIMITED TO: ELECTRICAL TAPE AND TAPING MATERIALS, SOLDER, FLUX, <br /> D. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN A COMPLETE RED LEAD, GLYPTOL OR OTHER INSULATING ENAMELS,WIRE IDENTIFICATION VIII. ACCEPTANCE AND CLEAN-UP <br /> SET OF CONTRACT DOCUMENTS,ADDENDA, DRAWINGS AND SPECIFICATIONS. TAGS, SEALING MATERIALS FOR FITTINGS,ALL FASTENING DEVICES SUCH 1. WIRE CARE DURING INSTALLATION <br /> HE SHALL CHECK THE DRAWINGS OF THE OTHER TRADES AND SHALL AS CLIPS, BOLTS, NUTS, WASHERS, SCREWS, CONDUIT STRAPS, HANGERS, <br /> CAREFULLY READ THE ENTIRE SPECIFICATIONS AND DETERMINE HIS CONDUIT PLUGS CAPS AND GASKETS. NO WIRE SHALL BE DRAWN INTO ANY CONDUIT OR DUCT UNTIL ALL WORK OF THE CONTRACTOR SHALL MAINTAIN ALL ELECTRICAL SYSTEMS AND EQUIPMENT <br /> INSTALLED BY HIM UNTIL FINAL ACCEPTANCE OF THE WORK. IN ADDITION <br /> RESPONSIBILITIES. FAILURE TO DO SO SHALL NOT RELEASE THE <br /> ANY NATURE THAT MAY CAUSE INJURY TO WIRE OR ITS INSULATION IS TO THE GUARANTEES INCLUDED IN THE GENERAL CONDITIONS HEREOF, THE <br /> CONTRACTOR FROM DOING THE WORK IN COMPLETE ACCORDANCE WITH COMPLETED. CONTRACTOR SHALL ALSO REPAIR OR REPLACE,TO THE SATISFACTION OF THE Q?,OFESS/O <br /> THE DRAWINGS AND SPECIFICATIONS. IV. CONDUIT INSTALLATION OWNER REPRESENTATIVE, ALL DEFECTIVE WORKMANSHIP OR MATERIALS HO& <br /> CARE SHALL BE TAKEN IN PULLING IN WIRES TO PREVENT DAMAGE TO THE FURNISHED BY HIM THAT MAY BECOME APPARENT DURING TESTING, RUN-IN, <br /> II. WORK DESCRIPTION 1. CONDUIT RUNS: INSULATION OR WIRES DURING THE PULLING OPERATION. AND ACCEPTANCE TESTS OF THE CONTRACTOR'S WORK BY OWNER. w <br /> cr <br /> THE ELECTRICAL INSTALLATIONS CONSIST OF THE FOLLOWING AREAS OF WORK. ALL EXPOSED CONDUIT SHALL BE INSTALLED STRAIGHT AND TRUE WITH 2. TAGGING AND IDENTIFICATION THE CONTRACTOR SHALL AT ALL TIMES KEEP THE PREMISES CLEAN AND FREE <br /> E16993 <br /> VERIFY ADDITIONAL SPECIFIC REQUIREMENTS WITH THE OWNER\ REFERENCE TO THE ADJACENT WORK. WHEN A NUMBER OF ADJACENT CONDUITS FROM ACCUMULATION OF WASTE MATERIALS AND DEBRIS. ALL EXPOSED WORK <br /> REPRESENTATIVE. RUN IN THE SAME DIRECTION,THEY SHALL RUN PARALLEL. ALL FEEDERS, MAINS, AND SPECIAL CIRCUITS SHALL BE TAGGED IN PULL <br /> BOXES OR PANEL IN WHICH THEY CONNECT. SHALL BE THOROUGHLY CLEANED. THE CONTRACTOR SHALL CLEAN ALL � \G � <br /> CONDUIT AND ELECTRICAL EQUIPMENT DURING THE PROGRESS OF THE WORK T CTR <br /> O <br /> 1. POWER DISTRIBUTION PANEL ALL CONDUIT RUNS SHALL BE INSTALLED SO AS TO AVOID PIPING. CONDUITS AND UPON COMPLETION,THE CONTRACTOR SHALL REMOVE ALL DEBRIS AND OF CAL\F <br /> SHALL BE INSTALLED SO THAT THERE SHALL NOT BE LESS THAN 12"CLEARANCE ALL TERMINAL BLOCKS REQUIRING NUMBERS SHALL BE NUMBERED BY CONTRACTOR LEAVE THE EQUIPMENT AND PREMISES IN A CLEAN CONDITION. <br /> INSTALLATION OF NEW POWER DISTRIBUTION( PANELS: LP-2, FP1,AND FP2). TO PIPING EXCEPT AT CROSSING WHERE THE SPACE WILL BE AS GREAT AS THE WITH PERMANENT TYPE PAINT, NOT PENCIL OR INK. <br /> SWITCHGEAR AND PANELS TO BE FURNISHED BY OWNER AND INSTALLED BY CONSTRUCTION WILL PERMIT. CONDUITS MUST BE WRAPPED WHEN WITHIN 12" <br /> GC'S ELECTRICAL CONTRACTOR. FUEL CONTRACTOR SHALL COORDINATE. OF COPPER PIPING. ALL CONDUCTORS IN PANELS, STARTERS, PUSH BUTTONS, MOTORS, JUNCTION <br /> ALL CONDUITS FORM BUILDING TO BE STUBBED OUT BY G.C. F.C.TO BOXES, LIGHTING, BRANCH CIRCUITS, CONTROL MAIN FEEDERS, 2020.05.2014:48:55-05'00' <br /> COORDINATE EXACT NUMBER AND LOCATION REFER TO CONSTRUCTION DRAWINGS FOR MINIMUM SIZE OF CONDUITS. INSTRUMENTATION, AND SPECIAL CIRCUITS SHALL BE IDENTIFIED BY <br /> OTHERWISE MINIMUM SIZE SHALL BE 1" DIA. FOR LONG RUNS AND FOR TAGGING WITH SELF-ADHESIVE BRAND OR T&B VINYL LABELS, OR EQUAL. <br /> SHORTER RUNS WITH LESS CONTENT SHALL BE 3/4" DIA.VERIFY WITH <br /> 2. SUBMERSIBLE TURBINE PUMPS LOVE'S CONSTRUCTION ON CONDUIT SIZES. CONTRACTOR SHALL INSTALL ALL TAGGING IN SUCH A MANNER AS TO BE <br /> CLEARLY VISIBLE. <br /> INSTALL POWER AND CONTROL CIRCUITS. RUN CONDUITS AND WIRES WITH GROUND ISOLATE FEP VSP/STP's IN SEPARATE CONDUITS. <br /> WIRE FROM POWER PANEL TO PUMP RELAY CONTROL BOX, DISPENSERS AND IN CONNECTING WIRES TO SWITCHES OR CONTROLLERS, THE PHASES SHALL <br /> U SUBMERSIBLE PUMPS AT THE UNDERGROUND STORAGE TANKS. 2. BENDS, DIAMETER,AND RADIUS: BE IDENTIFIED BY THE LOCATION OF THE TERMINAL,WHICH SHALL BE THE <br /> LU SAME FOR ALL EQUIPMENT OF THIS TYPE. <br /> 0- <br /> c() STANDARD BENDS MAY BE USED ABOVE GROUND AND ALL BENDS AND OFFSETS ISSUE BLOCK <br /> Q SHALL BE OF AS LARGE A RADIUS AS THE CONSTRUCTION WILL PERMIT BUT IN <br /> U 3. ANNULAR SPACE SENSORS NO CASE SHALL THE INSIDE RADIUS BE LESS THAN 5-INCH OR SIX TIMES THE NOTE: <br /> NOMINAL DIAMETER OF THE CONDUIT, WHICHEVER IS GREATER. FUEL CONTRACTOR SHALL INSTALL EMERGENCY PUMP SHUT-OFF SWITCH PER UNIFORM FIRE CODE <br /> LU SENSORS MAY BE PART OF THE MONITOR SENSOR SYSTEM. WIRING FOR SENSORS DIV IX AND NATIONAL ELECTRICAL CODE ART. 514. ALSO TO INSTALL ACKNOWLEDGMENT SWITCH <br /> w IS INTRINSICALLY SAFE. DEDICATE ONE CONDUIT TO THIS CIRCUIT AND LOOP TO &OVERFILL ALARM WITH FLASHING RED LIGHT&AUDIBLE HORN. LOCATION SHALL BE INSTALLED OUTSIDE <br /> ALL UNDERGROUND TANKS. CLASSIFIED AREA OF CLASS I DIV. 2, GROUP D, &WITHIN SIGHT OF U.G TANK STORAGE FILL <br /> w BY THE LOCAL AUTHORITY OR THE STATE. <br /> 4. SUMP SENSORS <br /> p SENSORS MAY BE PART OF THE MONITOR SENSOR SYSTEM. WIRING FOR SENSORS <br /> IS INTRINSICALLY SAFE. DEDICATE ONE CONDUIT TO THIS CIRCUIT AND LOOP TO GENERAL NOTES: <br /> U_ ALL UNDERGROUND TANKS. <br /> m 1 THE INSTALLATION MUST CONFORM TO THE REQUIREMENTS OF ARTICLE 501, NATIONAL 8. ALL CONDUIT AND WIRES SHALL BE LABEL-IDENTIFIED AS SHOWN HEREIN. <br /> ELECTRICAL CODE (ANSI/NPFA 70)AND ALL OTHER LOCAL OR APPLICABLE CODES. FURNISH AND <br /> 5. TANK GAUGING SYSTEM STORE N0. 223 <br /> a) INSTALL CONDUIT SEALS PER LATEST N.E.0 ARTICLES 510&514. 9. THE TANK MONITORING SYSTEM SHALL BE LOCATED WHERE SHOWN IN THE SITE ELECTRICAL <br /> INSTALLATION OF THE TANK GAUGING CONTROL PANEL AS SHOWN IN THE PLAN OR WHERE DESIGNATED BY THE SITE ENGINEER. THE GENERAL CONTRACTOR SHALL <br /> 2. THE ELECTRICAL DEVICES SHALL BE LOCATED WHERE SHOWN IN THE SITE ELECTRICAL PLAN OR WHERE DOCUMENT DATE: 04.15.20 <br /> DRAWINGS OR AS INDICATED BY THE OWNER REPRESENTATIVE. PROVIDE POWER RUN POWER AND PROBE CONDUITS TO THE SELECTED LOCATION. <br /> AND REQUIRED GROUNDING CIRCUITS TO NEW PANEL AND CONNECT PANEL TO ALL DESIGNATED BY SITE ENGINEER. THE GENERAL CONTRACTOR SHALL RUN POWER, CONTROLS AND CHECKED BY: BKH <br /> rn PROBES INSTALLED IN THE TANKS. CONTRACTOR SHALL STRICTLY FOLLOW THE COMMUNICATIONS CONDUITS TO THE SELECTED LOCATION. 10. ALL INTRINSIC WIRING MUST(VEDDER ROOT) BE RUN IN ITS OWN DEDICATED CONDUIT, <br /> E MANUFACTURER'S INSTRUCTIONS FOR NUMBER OF WIRES,WIRE SIZE,WIRE 3. EACH TYPE OF WIRING SYSTEM MUST BE RUN IN ITS OWN DEDICATED CONDUIT. SEPARATE FROM ALL OTHER A.C. OR D.C.WIRING. DRAWN BY: WWB <br /> (n Ui INSULATION, DEDICATION OF CONDUIT(INTRINSICALLY SAFE PROBES CIRCUITRY) A.C., D.C., DATA AND COMMUNICATIONS CIRCUITS MAY NOT BE COMBINED IN ONE CONDUIT UNLESS <br /> a) co AND CONDUIT DIAMETERS. THE MANUFACTURER WILL REFUSE TO START UP THE SPECIFICALLY NOTED IN THE PLANS. 11. ALL CONDUITS RELATED TO THE MONITORING SYSTEM AND POWER SHALL BE RIGID PVC PROTO CYCLE: 01.01.20 <br /> N SYSTEM AND WILL NOT PROVIDE WARRANTIES IF THE INSTALLATION DOES NOT EXCEPT @ CLASSIFIED AREAS 10'-0" MINIMUM FROM SUMPS. CONDUITS IN CLASSIFIED AREAS <br /> c Q <br /> c FULLY COMPLY WITH MANUFACTURER'S INSTRUCTIONS. 4. ALL WIRING MUST BE RESISTANT TO OIL AND GASOLINE.-TYPE THWN OR THHN. SHALL BE RIGID METALLIC PVC COATED CONDUITS. <br /> U <br /> 0 5. ALL CONDUITS RELATED TO THE FUELING SYSTEM SHALL BE A COMBINATION OF RIGID, COATED RIGID,AND 12. ALL INTRINSIC WIRING MUST BE AWG#18 UNLESS OTHERWISE SPECIFIED. ELECTRICAL <br /> 3 .2 PVC. UNDERGROUND CONDUITS SHALL BE PER SCHEDULES ON SHEET FE-2, FE-3, FE-4. STP SHALL BE ALL SPECIFICATIONS <br /> a� PVC COATED RIGID CONDUIT. <br /> > 6. ALL POWER WIRING SHALL BE A MINIMUM AWG#12. ALL CONTROL WIRING SHALL BE AWG#14, UNLESS 13. ALL POWER&CONTROL WIRING, EVEN WHEN CONNECTED THROUGH ANY ISOLATING RELAY, MUST <br /> E OTHERWISE SPECIFIED. DATA SHIELDED CABLES OR OTHER SPECIALTY WIRING SHALL CONFORM TO THE BE AWG#12,AND RUN IN THEIR CONDUIT OR OTHER SHARED A.C. CONDUIT. <br /> Ln N EQUIPMENT MANUFACTURER'S RECOMMENDATIONS OR OWNERS INSTRUCTIONS. <br /> 0 14. FUEL CONTRACTOR SHALL UTILIZE ONLY MANUFACTURER'S AUTHORIZED TECHNICIANS FOR THE <br /> 00 <br /> o INSTALLATION OF THE EQUIPMENT AND THE FINAL TERMINAL CONNECTIONS, POWER UP, CALIBRATION <br /> 0 0 7. THIS IS A STANDARD DRAWING FOR GENERAL REQUIREMENTS ONLY. REFER TO THE GENERAL AND TEST OF THE MONITORING EQUIPMENT. THE GENERAL CONTRACTOR SHALL SUBMIT TO OWNER A <br /> c\1 0 ARRANGEMENT PLAN OR ELECTRICAL SITE PLAN FOR CONDUIT RUNS, NUMBER OF DEVICES COMPLETE REPORT OF THE TESTING, SETTINGS AND CALIBRATION.THE FUEL CONTRACTOR SHALL SHEET: <br /> o REQUIRED AND THE EXACT ORIGIN &TERMINATION OF CONDUITS. INCLUDE IN HIS QUOTATION THE COST OF START UP. FE- 1 <br /> z <br />