My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 3:27:47 PM
Creation date
2/10/2022 9:06:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0516526
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0012659
FACILITY_NAME
LOVES COUNTRY STORES OF CALIFORNIA #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1553 COLONY RD RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDUIT HOMERUN COUNT JANITORS CLOSET 1"JUNGE COMM. CONDUIT CONTAINS: 1. REMOVE LIQUID CONTROLS POD CIRCUIT BOARDS BEFORE WATER TEST. . <br /> ELECTR/CAL f700/pl 1 -CAT 5 CABLE 2. MOUT JUNGE PANEL IN S/S ENCLOSURE USING WIDE UNISTRUT. <br /> TOTAL 3. NEED SHELF, RECEPTACLE AND NETWORK HUB FOR JUNGE PRINTER TO BE m e <br /> CONDUIT TYPE BIO-DIESEL 20K ELECTRICAL NOTES: 1"JUNGE POWER CONDUIT CONTAINS: MOUNTED NEAR EVO IN STORE (VERIFY LOCATION WITH OWNER). • ; _ on <br /> CONDUIT 4. BOLT METER SUMP TOPS ON SUMP AND BRACE WITH 2"x4"LUMBER TO KEEP _ <br /> TANK <br /> QUANTITY 1. ELECTRICAL CONTRACTOR SHALL 1 - 12 GA BLACK 120 VAC JUNGE POWER SUMP FROM CAVING IN . �-� � s `— <br /> MONITOR VERIFY ELECTRICAL PANEL FUEL 1 - 12 GA WHIT JUNGE NEUTRAL 5. CAT 5 CABLE FROM JUNGE DIRECTLY TO NET WORK HUB (OFFICE OR BACKROOM). ��� mi <br /> s _ s - <br /> CONDUIT 1 1 ISO EXISTING FUEL SITE 1 - 12 GA GREEN GROUND 6. REMOVE ANY BALL FLOAT VENTS VALVES FROM DIESEL TANKS IF PRESENT. <br /> CONNECTIONS,LOAD REQUIREMENT PANEL MONITOR PANELS 1 - 14 GA SWITCHED POWER TO L1 AND RELAY MOD. <br /> POWER CALCULATIONS FOR ALL NEW 1 - 14 GA PI TO EVO CONTROLLER MODULE <br /> CONDUIT <br /> ❑ ❑ 1 - 14 GA 120 VAC INPUT FOR LOW LEVEL BIO TANK <br /> 2. ELECTRICAL CONTRACTOR SHALL 1 - 14 GA 120 VAC INPUT FOR HIGH LEVEL TANK 1 JUNGE WIRING DIAGRAM & Assoc 1 A T E S , LTD <br /> VACUUM 1 1 - 14 GA 120 VAC INPUT FOR HIGH LEVEL TANK 2 LOCATED INSIDE CABINET <br /> SENSOR 1 ROUTE ALL NEW CONDUIT PER NEC 1705 S.Walton Blvd.,Suite 3 <br /> CODE. 1 - 14 GA 120 VAC INPUT FOR HIGH LEVEL TANK 3 <br /> VACUUM EXISTING CONDUITS INTRINSIC Bentonville,Arkansas 72712 <br /> SENSOR M 1 1 3. ELECTRICAL CONTRACTORS SHALL TO SITE MONITORS SECTION t 479.273.7780 <br /> INSTALL NEW ISO PANEL PER MANUFACTURERS INSTRUCTIONS. FUEL INSTALLER SHALL VERIFY WIRE "JUNGE BIO-BLENDER" BOX f 888.520.9685w <br /> JUNGE WITH TOUCH SCREEN Nvw.hfa-ae.com <br /> 2 2 <br /> CABINET QUANTITIES WITH EQUIPMENT <br /> SITE MONITOR INSTALLATION MANUALS <br /> TOTAL TANK GUTTER GUTTER-INTRINSIC SECTION DATA RACK (LOCATED IN STORE �, <br /> FIELD CONDUIT 6 VERIFY UNITS AND LOCATION LL LL w w z= m <br /> FLOW METER DATA WIRES AND HEAT O � 0 w°���z o�m 'a <br /> QUANTITY WITH OWNER) a CONDUIT SEAL-OFFS AND w - ¢ °i z <br /> SENSOR WIRE ROUTED IN THE SAME O cn x s 0 a 0 Q <br /> 1 111111 M <br /> O EXPLOSION PROOF D 2<0-)w s->z w�'w 0 <br /> POWER SECTION CONDUIT FROM DIESEL TANK TO ~o w JUNCTION BOXES REQUIRED ow z=°2 LL w w z o 0 <br /> ONLY AUTO CANOPY AND TANK CONDUITS SHOWNIN JUNGE CABINET cn INSIDE JUNGE CABINET Q o~w m o m w=o z w <br /> I I I I I I I W s~�Ew wxF<�z= <br /> 1 NOTE: O w�>-z�X=a�oo� <br /> BDT-P1 - I TO JUNGE I I I I I SITE MONITOR AND SENSOR z Q,o a 2 oo W n.0>>w <br /> CABINET I I I I I EQUIPMENT PROVIDED AND <br /> BDT-VP1 f-------------------J INSTALLED BY FUEL CONTRACTOR. o KUo4zQww}�o°� <br /> L. <br /> I FLOW METER DATA <br /> L< 'n <br /> I I JUNGE COMM. a n �w �Wazgw� <br /> I I =z0a0�owxz�wo <br /> I I I HEATSENSOR TO STORE ELECTRICAL co �o 0 0 w 0 LL a a w 0 a 0 <br /> 120V ACTUATOR JUNGE POWER ROOM <br /> I VALVE <br /> UNL-C1 �-------------------------------� I I I <br /> I ILOW MESETER DATA 2-1"CONDUIT <br /> DT-C1 --------------------------------- I TO DIESEL FILL SUMP H EATo <br /> I 120V ACTUATOR <br /> BDT-C1 I VALVE 6 3/4"CONDUIT 00 <br /> 0 <br /> TO BIO-DIESEL -------------------------------� j FLOW METER DATA o <br /> TANK ------------------- HEATSENSOR ti <br /> BDT-VS1 120V ACTUATOR C� o <br /> IN STORE PANELS VALVE Q N <br /> JUNGE CONDUIT LAYOUT U Z <br /> J <br /> VACUUM MONITOR - SENSOR CONDUITS z Lj ~ <br /> SITE MONITORING CONDUIT AND WIRE SCHEDULE-LIQUID SENSORS AND LEVEL PROBES(INTRINSIC) 0 W U w <br /> * = HOMERUN CONDUIT LU LU <br /> CONDUIT TAG SIZE OFORIGIN TERMINATION QUANTITY OF WIRES - w <br /> ---- ---- CONDUIT CONDUIT TAG SIZE OF QUANTITY OF � U) a <br /> ----]))I <br /> ORIGIN TERMINATION <br /> __ ( ___ _ UNL BIO Ds CONDUIT WIRES <br /> F —� �-]� I I IF FILL FILL FILL JUNCTION BOX ' <br /> IIII GUTTER-INTRINSIC SECTION SEE PANEL MANUFACTURER INFORMATION ANNULAR HYDROSTATIC SENSOR 1 <br /> O O I I I I I I o• * BDT-VS1 1 VACUUM PUMP 1 O 3-COND. BELDEN 88770 <br /> O I i 11 it I O I I OO I VACUUM PUMP 2 ROUTED TO SITE MONITOR FOR CIRCUIT IDENTIFICATION * BDT-C1 1" GUTTER-INTRINSIC SECTION HYDROSTATIC SUMP SENSOR-LIQUID SENSOR- (6)2-COND.BELDEN 88760 y <br /> I I I I I I I I ELLD SENSOR-ATG PROBE <br /> 1 1 1 11 I I 1 1 I J-BOX AT ANNULAR STP SUMP SENSOR J-BOX O <br /> 1 I I 1 I I BDT-C2 1" MANHOLE I <br /> GROUNDING AND BONDING: HYDROSTATIC SUMP SENSOR-LIQUID SENSOR- (3)2-CON D. BELDEN 88760 <br /> O O 4-3/4"coNDulr TO I RF-C1 Q <br /> � � 0 I 1 ELLD SENSOR <br /> JUNGE CABINET 1 1 1 1 1 I 1 1 O <br /> 1 1 1 1 I I I ALL METAL RACEWAYS AND METAL Q J-BOX AT ANNULAR FILL SUMP SENSOR J-BOX <br /> Op I COMPONENTS OF THE CONDUIT SYSTEM BDT-C3 1" MANHOLE HYDROSTATIC SUMP SENSOR-LIQUID SENSOR (2) 1 -COND. BELDEN 88760 <br /> TO ELECTRICAL ROOM f — <br /> WITHIN CLASS 1,DIV 1 AND 2 AREA SHALL <br /> ISO PANEL -a - I I RF-c2 BE GROUNDED AND BONDED TO SYSTEM <br /> ATG MANHOLE <br /> I I I - - - - - - - - o GROUND PER NATIONAL ELECTRICAL CODE. J-BOX AT ANNULAR <br /> RF-C3 BDT-C4 1" ATG PROBE SENSOR 1 <br /> O <br /> O O � I I O � (IF REQUIRED BY CODE) MANHOLE 1 -COND. BELDEN 88760 <br /> I I0 0 0 0 <br /> I 11 I I I I Op I i o <br /> EXISTING OVERFILL ALARM AT 1 1 <br /> EXISTING VENT RACK SHALL BE I I I I I I NOTE: ANNULAR HYDROSTATIC SENSOR (1)3-COND. BELDEN 88770 <br /> WIRED TO BIO-DIESEL TANK FOR 2-1°CONDUIT BACK TO I o CONDUIT HOME-RUNS SHALL BE FROM * DT-C1 1" GUTTER-INTRINSIC SECTION HYDROSTATIC SUMP SENSOR-LIQUID SENSOR- (5)2-COND.BELDEN 88760 O <br /> OVER FILL WARNING. STORE ELECTRICAL <br /> ELLD SENSOR-ATG PROBE <br /> ROOM l I I � THE TANKS OR MORE DIRECT ROUTE <br /> CONTRACTORS SHALL MAINTAIN 1 3/4"TEMP SENSOR FROM THE TANK AREA TO THE BUILDING i <br /> I I J-BOX AT ANNULAR STP SUMP SENSOR J-BOX <br /> OR REUSE ALL EXISTING 1 CONDUIT TO JUNGE TERMINATION POINT.REARRANGE THE DT-C2 1" HYDROSTATIC SUMP SENSOR-LIQUID SENSOR (2)2-COND. BELDEN 88760 <br /> ELECTRIC L CONDUITS AT TANK l I I CONDUITS I.D.TO TO MATCH SPECIFIC MANHOLE <br /> FIELD. l I I CONDITIONS BUT MAINTAIN THE <br /> SEQUENCE SHOWN HEREON. J-BOX AT ANNULAR FILL SUMP SENSOR J-BOX <br /> 1 I I DT-C3 1 MANHOLE HYDROSTATIC SUMP SENSOR-LIQUID SENSOR (2) 1 -COND. BELDEN 88760 <br /> NOTE: <br /> l I <br /> DI SEL STP SU P 1 DI SEL STP SU P I NL STP SUM I PRI( STP S MP J-BOX AT ANNULAR ATG MANHOLE <br /> I 1 I I THE FUEL ELECTRICAL CONTRACTOR SHALL DT-C4 1 MANHOLE ATG PROBE SENSOR (1) 1 -COND. BELDEN 88760 <br /> J 1 L _ _ _ _ _ _ J L _ _ _ _ _ _ J L _ - VERIFY AND ACCOUNT FOR NOT LESS THAN 3% �oQ�OFHOi ' <br /> VOLTAGE DROP BASED ON LENGTH OF WIRE RTp �'Lc <br /> - - - - ------------ ----------------- ---------------------------- ---------------- <br /> - - - I r- � ® - - - - -4 FROM ELECTRICAL ROOM TO TANK FIELD AND <br /> - - - - - - - - - - - - - - - - - - - - - - - - - ANNULAR HYDROSTATIC SENSOR (1)3-CON D. BELDEN 88770 c� m <br /> DISPENSERS CONNECTIONS.THE FUEL L <br /> i * UNL-C1 1" GUTTER-INTRINSIC SECTION HYDROSTATIC SUMP SENSOR-LIQUID SENSOR- (5)2-COND.BELDEN 88760 <br /> ______________ ELECTRICAL CONTRACTOR SHALL ADJUST WIRE ELLD SENSOR-ATG PROBE E16993 <br /> 1 i / UNL-C4 SIZES IF STANDARD WIRE SIZED WILL NOT BE <br /> _____ O i SUFFICIENT ENOUGH TO HANDLE THE LOAD STP SUMP SENSOR J-BOX <br /> \ , J-BOX AT ANNULAR <br /> 1 ; ; BASED ON THE LENGTH OF WIRE. UNL-C2 1 MANHOLE HYDROSTATIC SUMP SENSOR-LIQUID SENSOR (2)2- COND. BELDEN 88760 �T �FCT RSC' Q� <br /> REGULAR UNL UST `FO <br /> NOTE: FILL SUMP SENSOR J-BOX CA <br /> 1 <br /> \ ----- , J-BOX AT ANNULAR <br /> I I UNLEADED TANK LEVEL ATG / , UNL-C3 1 MANHOLE HYDROSTATIC SUMP SENSOR-LIQUID SENSOR (2) 1 -COND. BELDEN 88760 <br /> _j I �� SIPHON SUMP UNL-C3 CONDUIT HOME-RUNS SHALL BE FROM THE <br /> p UNL-C2 ------------------- ————————————— TANKS OR MORE DIRECT ROUTE FROM THE <br /> Lu , , ATG MANHOLE 2020.05.2014:49:34-05'00' <br /> _ <br /> _--------------------- <br /> � --- TANK AREA TO THE BUILDING TERMINATION J-BOX AT ANNULAR <br /> v MANHOLE ATG PROBE SENSOR (1) 1 -COND. BELDEN 88760 <br /> POINT. REARRANGE THE CONDUITS I.D.TO <br /> Drs ) TO MATCH SPECIFIC CONDITIONS BUT <br /> vS _ 1 --_ \ \ MAINTAIN THE SEQUENCE SHOWN HEREON. <br /> < / ___ BDT-C4 NOTE: ROUTED WIRE THROUGH <br /> 3/4" BIO-DIESEL VENT SUMP ELECTRICAL ROOM TO (2)2-COND. BELDEN 88760 <br /> }- BIO-DIESEL UST0 IJ_� <br /> IN SOME SITES THE DIESEL TANKS SITE MONITOR PANEL <br /> WILL BE BURIED IN A SEPARATE <br /> \ LOCATION OR IF IN A FUEL LINE <br /> o a I -B1O-DIESEL 1 TANK LEVEL ATG / TRENCH RUN SEPARATE HOMERUNSz < ROUTED WIRE THROUGH <br /> STP SUMP I BDT-C3 / TO ELECTRICAL CABINET. ( ) ISSUE BLOCK <br /> BDT-C2 ------- ---------------------------� , * RF-C1 3/4" REMOTE FILL SENSOR ELECTRICAL ROOM TO 2 2-COND. BELDEN 88760 <br /> SITE MONITOR PANEL <br /> BDT-VP1 f- NOTE: ROUTED WIRE THROUGH <br /> J � � <br /> W EX <br /> LL n' TANK 2: <br /> F_ 1 `� IF APPLICABLE TANK SHALL BE USED3/4" REMOTE FILL SENSOR ELECTRICAL ROOM TO (2)2-COND. BELDEN 88760 <br /> cn <br /> CO i / �---------------- � i SITE MONITOR PANEL <br /> � DT-C4 � , FOR BIO-DIESEL. INSTALL BIO-DIESEL <br /> N I �\ COMPONENTS PER MANUFACTURE ROUTED WIRE THROUGH <br /> / I \ , INSTALLATION INSTRUCTIONS. VERIFY WITHILL * RF-C3 3/4" REMOTE FILL SENSOR ELECTRICAL ROOM TO (2)2-COND. BELDEN 88760 <br /> - SIPHON DIESEL UST OWNER. <br /> i-� 0I i SITE MONITOR PANEL <br /> 3 i 1 <br /> UNLEADED TANK LATG <br /> SIPHON SUMP CED <br /> a DT-C2 <br /> a) STORE N0. 223 <br /> -------------------------------------------------------- - --- ---------------------� <br /> • VACUUM MONITOR CONDUITS - POWER SUPPLY DOCUMENT DATE: 04.15.20 <br /> En <br /> a) <br /> 0 CONDUIT TAG CSIZE OF ONDUIT CHECKED BY: BKH <br /> ORIGIN TERMINATION QUANTITY OF WIRES <br /> a) DRAWN BY: WWB <br /> En ILL <br /> LEGEND BDT-VP1 1„ JUNCTION BOX-A.C. SITE MONITOR- INCON UNIT SEE PANEL MANUFACTURER INFORMATION PROTO CYCLE: 01.01.20 <br /> E co VACUUM PUMP 1 BY FUEL CONTRACTOR FOR CIRCUIT IDENTIFICATION <br /> N <br /> U BDT(X)C(X —————————— BIO-DIESEL SENSOR AND LEVEL PROBE CONDUITS <br /> o BDT(X)-P(X) —————————— BIO-DIESEL A.C.SUBMERSIBLE PUMP CONDUIT UNDERGROUND <br /> SEE NOTE FOR WIRE <br /> 3 STORAGE TANK <br /> BDT(X)VP(X) ---------- BIO-DIESEL VACUUM PUMP POWER CONDUIT CONDUIT AND WIRE SCHEDULE - POWER SUPPLY SIZE AND LENGTH FIELD CONDUIT <br /> REQUIRMEIVTSID DIAGRAMS, <br /> J BDT(X)VS(X) —————————— BIO-DIESEL VACUUM PUMP SENSOR CONDUIT CONDUIT TAG SIZE OF ORIGIN TERMINATION QUANTITY OF WIRES AND SCHEDULES <br /> C) CONDUIT <br /> .. o <br /> 00 JUNCTION BOX-A.C. NEW ISO FUEL PANEL IN ELECTRICAL ROOM <br /> 3410, 1410 GRD <br /> c'jo N * BDT-P1 1" BIO-DIESEL TANK, ELECTRICAL CONTRACTOR TO VERIFY WITH SEE NOTE FOR VOLTAGE DROP <br /> 0 o SUBPUMP#1-1 CONNECTIONS WITH PATCO SHEET: <br /> � <br /> � FE-2 <br /> z <br />
The URL can be used to link to this page
Your browser does not support the video tag.