My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2200 - Hazardous Waste Program
>
PR0513594
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 4:23:59 PM
Creation date
2/14/2022 12:48:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0513594
PE
2229
FACILITY_ID
FA0007670
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
15902010
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 F. Surface Water Investigation <br /> 2 ( 1) Surface Water <br /> 3 ( i) Documentation of on-site and off-site <br /> i <br /> 4 contamination. 1 <br /> 5 (2) Sediments i <br /> 6 (i) Documentation of on-site and off-site <br /> 7 contamination. � <br /> 8 (3) Flood Potential <br /> 9 (4) Drainage <br /> 10 G. Air Investigation <br /> 11 H. Biota Investigation <br /> 12 (1) Flora <br /> i <br /> 13 (2) Fauna <br /> 14 I . Bench and Pilot Tests <br /> 15 ( 1) Description of any past remedial actions. <br /> i <br /> 16 (2) A summary of all air, soil, surface water and <br /> 17 groundwater assessment work completed to date, <br /> 18 including data reduction and interpretation of <br /> 19 the data. <br /> 20 J. Public Health and Environmental Concerns <br /> 21 (1) Potential Receptors <br /> i <br /> 22 (2) Public Health Impacts <br /> 23 (3) Environmental Impacts <br /> 24 5. 3 . 5 Feasibility Study Report <br /> 25 The Feasibility Study Report shall be submitted to the <br /> 26 Department for review and approval. The Feasibility Study <br /> 27 Report shall summarize the results of the Feasibility Study <br /> -27- <br /> COURT PAPIR j <br /> f7n7NOW CALIFORNIA <br /> Sr;. 113 IIKv. 6•711 <br /> 85 3474 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.