Laserfiche WebLink
i <br /> 1 including reduction and interpretation of all data and <br /> 2 information generated and/or compiled during the Feasibility <br /> 311 Study. The Feasibility Study Report shall cover the following, <br /> 4 subjects relating to the Site: <br /> 5 A. Description of Current Situation <br /> 6I (1) Site Background Information <br /> 7 (2) Nature and Extent of Release <br /> 8 (3) Objective of Remedial Action(s) <br /> 9 B. Screening of Remedial Action Technologies <br /> 10 (1) Technical Criteria <br /> 11 (2) Remedial Action Alternatives Developed <br /> 12 (3) Environmental and Public Health Criteria <br /> I <br /> 13 (4) Other Screening Criteria <br /> 14 (5) Cost Criteria <br /> 15 (6) Institutional Criteria <br /> 16 C. Analysis of Remedial Action Alternatives <br /> 17 (1) Technical Feasibility <br /> 18 (2) Environmental Evaluation <br /> 19 (3) Institutional Requirements <br /> 20 (4) Public Health Evaluation <br /> 21 (5) Cost Analysis <br /> 22 D. Ranking and Selection of Remedial Action Alternative <br /> 23 5. 3 . 6Commixnity_Relations Plan <br /> i <br /> 24 The Community Relations Plan revision shall be submitted to <br /> 25 the Department for review and approval by April 1, 1988. The <br /> 26 Community Relations Plan should be based on EPA's ,Community <br /> 27 <br /> -28- <br /> PO%JRT PAPER <br /> 15TATt or CALIFOMM1A <br /> :{TO. 113 tR[v. 0•72) <br /> 95 :34754 <br />