My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2200 - Hazardous Waste Program
>
PR0513594
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 4:23:59 PM
Creation date
2/14/2022 12:48:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0513594
PE
2229
FACILITY_ID
FA0007670
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
15902010
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 1 5. 4 . 2 Implementation of Final Remedial Action_ Plan <br /> 2 By August 1, 1990 Respondent shall submit to the Department a <br /> i <br /> 3 detailed Remedial Action (RA) Workplan containing technical and <br /> 4 operational plans and engineering designs for implementation of <br /> 5 the approved remedial or removal action alternative, and a <br /> 6 schedule for implementation of each activity. The Workplan <br /> 7 shall also describe the nature and design of the construction <br /> 8 or equipment to be employed, a site specific Hazardous Waste <br /> 9 Transportation Plan ( if necessary) , the identity of any <br /> to contractors, transporters and other persons conducting removal I <br /> i <br /> 11 and remedial activities for the Respondent, post remedial <br /> 12 sampling and monitoring procedures for air, soil, surface water <br /> 13 and groundwater, and shall cover all of the subjects described <br /> 14 in paragraph 5. 3 . 3 .A, subdivisions (1) , (2) , (3) , and (4) as <br /> 15 they pertain to the removal and remedial activities. All <br /> 16 approved removal or remedial actions excluding operation and <br /> I <br /> 17 maintenance shall be completed by June 1, 1991. <br /> 18 A.' Upon Department approval of the RA Workplan, <br /> 19 Respondent shall implement the final RAP. <br /> 20 B. Respondent shall be responsible for operation and <br /> 21 maintenance requirements in accordance with the final <br /> 22 RAP and RA Workplan. <br /> 23 0, During the i.mplementation of the final RAP and RA <br /> 24 Workplan the Department may specify such additions, <br /> 25 modifications and revisions to the RA Workplan as may <br /> 26 be necessary to implement the RAP. <br /> 29 D. Any remedial technology employed in implementation of <br /> -30- <br /> POURT PAPER <br /> 'STA'ff of CALIFORNIA <br /> STD. 113 INEV. 0•721 <br /> 96 34769 <br />
The URL can be used to link to this page
Your browser does not support the video tag.