Laserfiche WebLink
f <br /> 1 The final closure plan shall conform to RCRA surface I <br /> 2 impoundment closure requirements, as applicable. <br /> 3 '" Implementation of the closure plan shall be performed <br /> 4 � subsequent to the completion of pond corrective measures <br /> 5 �; specified in the Remedial Action Plan (RAP) . Should the <br /> 6i approved closure plan contain more stringent measures than <br /> 7I those actions mandated by the RAP, the requirements of the <br /> g closure plan shall apply. After implementation of the closure <br /> 9 plan and corrective measures specified in the RAP, Respondent <br /> 10 shall obtain a post-closure permit for the surface <br /> 11 impoundment. <br /> 12 <br /> 13 <br /> 14 <br /> 15 <br /> 16 <br /> 17 <br /> 1s <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br /> 24 <br /> 25 <br /> 26 <br /> 27 <br /> D-4 <br /> COURT PAPER <br /> STATt OF CALIFORNIA <br /> STC). 113 III[V. 8•731 <br /> 66 34769 <br />