Laserfiche WebLink
SAN J O A Q U I N Environmental Health Department <br /> COUNTY <br /> 5 . Provide written notification to ust@sjgov . org to arrange the following inspection appointments . <br /> All appointments must be scheduled 48 hours in advance . <br /> PRIOR TO BACKFILL <br /> a) Inspection for brine leaks prior to tank placement in excavation . All tank pre-installation tests shall be <br /> performed according to tank manufacturer instructions . <br /> b) Verification of tank set , anchorage , appropriate backfill , and appropriate additional corrosion protection <br /> of tank anchors (turnbuckles , eye bolts , etc . ) . Additional corrosion protection is required on all exposed <br /> metal prior to covering . <br /> c) Primary tank test , according to manufacturer' s specifications . <br /> d ) Primary piping soap test of all piping and penetrations ( product, vapor recovery , and vent) : One - hour <br /> pneumatic pressure test at 110 % of operating pressure , or 40 psi , whichever is greater, in accordance <br /> with manufacturer installation instructions . <br /> e ) Verification of secondary piping slope at 1 /8 inch per foot or greater, to a containment sump with an <br /> audible/visual alarm . <br /> f) Secondary piping soap test of all piping and penetrations ( product, vapor recovery , and vent) : One- <br /> hour pressure test at the manufacturer' s recommended specification . <br /> g ) Verification of all pipe setbacks , cross-overs , and burial depth according to the manufacturer' s <br /> installation instructions and verification of appropriate piping backfill . <br /> h ) Integrity testing of all sumps per the manufacturer' s installation instructions . <br /> i ) Verification of brine type and witnessing of brine addition . <br /> PRIOR TO FIRST FUEL DELIVERY <br /> j ) Verification of leak monitoring communication for all installed vacuum , pressure , or hydrostatic (VPH ) <br /> components including piping , sumps , under dispenser containment sumps ( UDCs) , and all chase lines . <br /> Communication at end points of each vacuum zone and each vacuum monitored sump must be <br /> verified independently in operating condition . <br /> k) Verification of the dispenser footprints contained by the UDCs . Any potential leaks from piping and <br /> fuel filters must drain directly into UDCs . <br /> 1 ) Enhanced Leak Detection ( ELD ) testing , after facility is in operating condition . Appropriate test <br /> notification , tester certifications , and test method disclosure is required . Passing ELD test results must <br /> be received prior to receiving fuel . <br /> m ) Verification of VPH components installation (shroud boots and band clamps for spill containers , <br /> appropriate rubber-type gasket or clamps on lids on all fill , vent and STP sumps , etc . ) . <br /> n ) Verification of overfill prevention : Measurement of drop tubes to verify 95 % tank volume shut off and /or <br /> verification that external audible/visual alarm activates when tank is 90 % full . <br /> o) Spill bucket test: Verify minimum 5-gallon capacity and pass a one hour hydrostatic test (or equivalent) . <br /> Proper drainage method must be verified . <br /> p) Monitoring system functionality : Functionality of the monitoring system must be verified to ensure it <br /> meets the requirements of California Code of Regulations ( CCR) Title 23 and California Health & <br /> Safety Code ( HSC ) Chapter 6 . 7 . <br /> PRIOR TO FINAL APPROVAL <br /> q ) Leak detector test, after first fuel delivery : Leak detector must be tested to confirm that the device can <br /> detect a leak of 3 gallons per hour at 10 psi . Leak detector monitored line volumes shall be appropriate <br /> for the make and model of the installed leak detectors , and shall be verified at the time of installation . <br /> r) PRIOR TO FINAL APPROVAL : Monitoring system functionality , after first fuel delivery , in operating <br /> condition : Functionality of the monitoring system must be verified to ensure it meets the requirements <br /> of CCR Title 23 and HSC Chapter 6 . 7 . <br /> 2 of 4 <br />