  <br />  <br />SP 7  <br />  <br />5‐1.05 PROPERTY PRESERVATION/EXISTING FACILITIES  <br />The Contractor’s attention is directed to Sections 5‐1.36, “Property and Facility Preservation,”  <br />and Section 15, “Existing Facilities,” of the Caltrans Specifications.  <br />The Contractor's attention is directed to the existence of certain underground facilities that  <br />may require special precautions be taken by the Contractor to protect the health, safety, and  <br />welfare of workers and of the public. Facilities requiring special precautions include, but are not  <br />limited to, conductors of petroleum products, oxygen, chlorine, and toxic or flammable gases,  <br />natural gas in pipelines six (6) inches or greater in diameter, or pipelines operating at pressures  <br />greater than 415 KPa (60 psi) (gage); underground electric supply system conductors or cables  <br />with potential to ground of more than 300 V, either directly buried or in duct or conduit, which  <br />do not have concentric grounded or other effectively grounded metal shields on sheaths.  <br />Immediately upon encountering unknown existing facilities, the Contractor shall notify the  <br />Engineer in writing of the situation and request coverage of the work as extra work. Failure to  <br />do so may result in forfeiture of any rights to receive extra work compensation under Section 8‐ <br />1.07, “Delays,” of the Caltrans Specifications. Should the Contractor stop work, no  <br />compensation will be made for any "down time" prior to written notifications being received by  <br />the Engineer or his representative.  <br />Delays due to encountering unexpected facilities shall be determined and compensated in  <br />accordance with the provisions of Section 8‐1.07, “Delays,” of the Caltrans Specifications, and  <br />as herein modified.  <br />Payment for complying with this Special Provision shall be included in the various items of  <br />work, and no additional compensation will be allowed, therefore.  <br />5‐1.06 REQUEST FOR INFORMATION  <br />The Contractor’s attention is directed to Sections 5‐1.42, “Request for Information” of the  <br />Caltrans Specifications.  <br />Contractor shall submit a request for information upon recognition of any event or question of  <br />fact arising under the contract.  The Engineer shall respond to the request for information  <br />within 5 working days.  <br />Payment for complying with this Special Provision shall be included in the various items of  <br />work, and no additional compensation will be allowed, therefore.  <br />5‐1.07 NOTICE OF POTENTIAL CLAIM  <br />The Contractor shall not be entitled to the payment of any additional compensation for any  <br />cause, or for the happening of any event, thing or occurrence, including any act or failure to act,  <br />by the Engineer, unless he has given the Engineer due written notice of potential claim as  <br />herein specified, provided, however, that compliance with this section shall not be a  <br />prerequisite for matters within the scope of the protest provisions under “Changes” or “Time of  <br />Completion” or within the notice provisions in “Liquidated Damages” not to any claim which is  <br />based on differences in measurements of errors of computation as to Contract quantities. The  <br />written notice of potential claim shall set forth the items and reasons which the Contractor  <br />believes to be eligible for additional compensation, the description of work, the nature of the