Laserfiche WebLink
  <br />  <br />SP 6  <br />  <br />The Contractor shall transmit each submittal to the Engineer for review and approval with the  <br />submittal form approved by the Engineer.   <br />All submittals shall be submitted within 30 calendar days from the date of the fully executed  <br />contract.  <br />Any incomplete submittals will be returned for resubmittal.  When revised for resubmission,  <br />identify all changes made since previous submission.  <br />Except as may otherwise be indicated herein, the Engineer will return prints of each submittal  <br />to the Contractor with comments noted on the submittal. The Contractor shall make complete  <br />and acceptable submittals to the Engineer by the second submission of a submittal item. The  <br />County reserves the right to withhold monies due to the Contractor to cover additional costs of  <br />the Engineer’s review beyond the second submittal.  <br />If a submittal is returned to the Contractor marked “NO EXCEPTIONS TAKEN,” formal revision  <br />and resubmission of said submittal will not be required.  <br />If a submittal is returned to the Contractor marked “MAKE CORRECTIONS NOTED,” formal  <br />revision and resubmission of said submittal will not be required.  <br />Full compensation for conforming to the provisions in this section shall be considered as  <br />included in the prices paid for the various contract items of work involved, and no additional  <br />compensation will be allowed, therefore.  <br />5‐1.03 RECORDS  <br />The Contractor’s attention is directed to Sections 5‐1.27, “Records,” of the Caltrans  <br />Specifications.  <br />The cost accounting records for the contract shall be maintained separately from other  <br />contracts, during the life of the contract, and for a period of not less than 3 years after the date  <br />of acceptance of the contract. If the Contractor intends to file claims against the Department,  <br />the Contractor shall keep the cost accounting records specified above until complete resolution  <br />of all claims has been reached.  <br />Full compensation for conforming to the provisions in this section shall be considered as  <br />included in the prices paid for the various contract items of work involved, and no additional  <br />compensation will be allowed, therefore.  <br />5‐1.04 JOB SITE APPERANCE  <br />The Contractor shall maintain a neat appearance to the work.  <br />Debris developed during construction shall be disposed of concurrently with its generation.   <br />The Contractor shall pay to the County of San Joaquin the sum of Two Hundred Fifty Dollars  <br />($250) for every calendar day where debris has remained on the job site overnight.  <br />Full compensation for conforming to the provisions in this section shall be considered as  <br />included in the prices paid for the various contract items of work and no additional  <br />compensation will be allowed, therefore.