Laserfiche WebLink
  <br />  <br />SP 11  <br />  <br />SECTION 7 – PAYMENT  <br />7‐1.01 GENERAL  <br />Attention is directed to Section 9 of the Standard Specifications, Section 9, “Payment,” of the  <br />Caltrans Specifications, and these Special Provisions. All measurements and payments for this  <br />work shall conform to all applicable provisions on Section 9 of the Caltrans Specifications.  <br />All materials designated to be removed shall become the property of the Contractor, unless  <br />otherwise noted, and shall be disposed in accordance with local, state, and federal laws and  <br />ordinances.  <br />Full compensation for performing the work in these specifications shall be included in the prices  <br />paid for the various contract items of work and no additional compensation will be allowed,  <br />therefore.  <br />7‐1.02 PAYMENTS  <br />Attention is directed to Sections 9‐1.16, "Progress Payments,” and 9‐1.17, "Payment After  <br />Contract Acceptance,” of the Caltrans Specifications, and Sections 9‐1.06, "Partial Payments,”  <br />and 9‐1.07B, "Final Payment and Claims,” of the Standard Specifications. No partial payment  <br />will be made for any materials that are furnished on hand, but not yet installed or incorporated  <br />in the work.  <br />Full compensation for all labor, equipment, tools, materials, services, travel, and incidentals and  <br />for doing all the work and all other items required to complete the work in conformity with the  <br />Contract Documents will be included in the prices paid for the various contract items of work  <br />and no additional work compensation will be allowed therefore.  No other compensation will  <br />be made except for the items listed in the Bid Proposal.  Work for which no separate payment  <br />has been provided will be considered as a subsidiary obligation of the Contract.    <br />Schedule of Measurement and Payment:  <br />1. Mobilization, Demobilization, Bonds, Permits, Inspections, and Insurance on all work: By  <br />lump sum. Includes preparatory work and operations, including but not limited to, those  <br />necessary for the movement of personnel, equipment, supplies and incidentals to the  <br />project site; for the establishment of all offices, buildings and other facilities necessary for  <br />work on the project; for the marshaling of equipment; and for all other work and  <br />operations which must be performed or costs incurred prior to beginning work on the  <br />various contract items on the project site, including obtaining the bonds, insurance  <br />policies, and permits required by the Contract Documents for this Project.  <br />2. Sheeting, Shoring, Sloping, Bracing, or Equivalent Method Conforming to Applicable  <br />Safety Standards: By lump sum.   <br />3. Sewer/Leach Line & Sewer Structure Removal: By the lump sum. Includes providing all  <br />labor, materials, tools, equipment, and incidentals for excavating, removing waste  <br />materials from the site, and removing the existing sewer/leach line & structures as  <br />indicated on the plans. Includes furnishing, constructing, and removing sheeting, shoring,  <br />sloping, bracing, or equivalent trench support structures and according to the County of  <br />San Joaquin Standards and Specifications.