Laserfiche WebLink
  <br />  <br />SP 13  <br />  <br />13. Install 36” Diameter Seepage Pit: By each. Includes providing all labor, materials, tools,  <br />equipment, and incidentals for excavating, removing waste materials from the site, and  <br />installing the proposed seepage pit as indicated on the plans and according to County of  <br />San Joaquin Standards and Specifications.  <br />14. Install Sewer WYE Connection and Sewer Lateral Connection to Sewer Cleanout: By  <br />each. Includes providing all labor, materials, tools, equipment, and incidentals for  <br />excavating, removing waste materials from the site, and installing the proposed sanitary  <br />sewer WYE fitting and sewer lateral connection to sanitary sewer cleanout as indicated on  <br />the plans and according to County of San Joaquin Standards and Specifications.  <br />15. Backfill Trench, Compact, and Match Existing Pavement/Concrete Section: By the square  <br />foot. Includes all labor, materials, and incidentals, and for doing all of the work involved in  <br />matching and compacting existing pavement sections to 95% relative compaction on all  <br />work performed and according to County of San Joaquin Standards and Specifications.  <br />16. Record Drawings: By lump sum. Includes all labor, materials, and incidentals, and for  <br />doing all of the work involved in preparing as‐built drawings on all work performed and  <br />according to County of San Joaquin Standards and Specifications.   <br />17. Tree Protection: By lump sum. Includes providing all labor, materials, tools, equipment,  <br />and incidentals for tree protection as indicated on the plans and according to County of  <br />San Joaquin Standards and Specifications.  <br />18. Restore Work Area: By lump sum.   <br />19. Duplex Pump Panel: By each. Includes providing all labor, materials, tools, equipment,  <br />and incidentals for installing a duplex pump panel as indicated on the plans and according  <br />to County of San Joaquin Standards and Specifications.  <br />20. Terminal, Fuse, GFCI: By each. Includes providing all labor, materials, tools, equipment,  <br />and incidentals for installing terminal, fuse, and GFCI as indicated on the plans and  <br />according to County of San Joaquin Standards and Specifications.  <br />21. 1.5” EMT: By linear feet. Includes providing all labor, materials, tools, equipment, and  <br />incidentals for installing 1.5” EMT as indicated on the plans and according to County of  <br />San Joaquin Standards and Specifications.  <br />22. 1.5” PVC‐40: By linear feet. Includes providing all labor, materials, tools, equipment, and  <br />incidentals for installing 1.5” PVC‐40 as indicated on the plans and according to County of  <br />San Joaquin Standards and Specifications.  <br />23. #4Cu USE‐2/RHW‐2 90 Deg C: By linear feet. Includes providing all labor, materials, tools,  <br />equipment, and incidentals for installing #4CU USE‐2/RHW‐2 Deg C as indicated on the  <br />plans and according to County of San Joaquin Standards and Specifications.  <br />24. Cable Terminations: By lump sum.  <br />25. Unistrut Stand: By lump sum.  <br />26. Grounding, Tests, Prep: By lump sum.