Laserfiche WebLink
  <br />  <br />SP 4  <br />  <br />SECTION 4 – SCOPE OF WORK  <br />4‐1.01 EXTRA WORK  <br />See Changes and Extra Work of the Caltrans Specifications.  <br />“If, in the opinion of the Engineer, such work cannot reasonably be performed  <br />concurrently with other items of work, and if a controlling item of work is delayed  <br />thereby, an adjustment of contract time will be made.”  <br />4‐1.02 CLEANUP  <br />The Contractor’s attention is directed to the Caltrans Specifications.  <br />The Contractor shall conduct and cause all working forces at the site to maintain the site in a  <br />neat orderly manner throughout the construction operations. The work shall be conducted in a  <br />manner that will control the dust. When ordered to provide dust control, the Contractor shall  <br />use water to reduce the dusty conditions all to the satisfaction of the Engineer. During  <br />construction, the Contractor shall remove all rubbish and debris as it is generated. Upon  <br />completion of the work, the Contractor shall remove all equipment, debris, and shall leave the  <br />site in a neat, clean condition all to the satisfaction of the Engineer.  <br />  <br />