Laserfiche WebLink
  <br />  <br />SP 5  <br />  <br />SECTION 5 – CONTROL OF WORK   <br />5‐1.01 PERMITS  <br />The Contractor’s attention is directed to Sections 5‐1.20B, “Permits, Licenses, Agreements, and  <br />Certifications,” of the Caltrans Specifications.  <br />The following is not an all‐inclusive list of the required permits and/or licenses, if applicable:   <br />•  Contractor’s License. A valid California Class A Contractor License.   <br />•  Business License. Contractor shall possess prior to the execution of the contract and  <br />maintain throughout the duration of the contract, a valid County of San Joaquin business  <br />license.   <br />•  County of San Joaquin Encroachment Permit (no fee)   <br />•  Construction Notification, dust control – The Contractor is responsible for the preparation  <br />and submittal of the San Joaquin Valley Air Pollution Control District Construction  <br />Notification Form.  More information can be found at the following web site:  <br />http://www.valleyair.org.  <br />•  Construction Water – The Contractor is responsible for obtaining a permit for water from  <br />California Water Service or County of San Joaquin, as applicable, for construction water  <br />obtained from a County hydrant.  This permit shall be approved by the County of San  <br />Joaquin Fire Department.  <br />•  State Water Resources Control Board Stormwater Construction General Permit  <br />•  Notice of Intent  <br />•  Notice of Termination  <br />  <br />Full compensation for conforming to the provisions in this section including applicable permit  <br />fees, shall be considered as included in the prices paid for in the contract prices for  <br />“Mobilization, Demobilization, Bonds, Permits, Inspections and Insurance on all work”, and no  <br />additional compensation will be allowed therefore.  <br />5‐1.02 SUBMITTALS  <br />The following is a list of anticipated submittals for the project.  The list is provided to aid the  <br />Contractor in determining the scope of work, but is not intended to be all inclusive and  <br />additional submittals may be required:   <br /> DAS‐140   <br /> Shop Drawings  <br /> Material Submittal   <br /> Emergency Contacts/Authorized Representatives  <br /> Manufacturer’s Instructions/Field Reports  <br /> Project Schedule  <br /> Construction and Demolition Debris Recycling Report.  <br /> Bypass Pumping Plan  <br /> All Subcontracts  <br />