My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014580
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14720
>
2600 - Land Use Program
>
S-81-11
>
SU0014580
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 2:01:51 PM
Creation date
2/24/2022 1:38:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014580
PE
2600
FACILITY_NAME
S-81-11
STREET_NUMBER
14720
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
APN
05516031
ENTERED_DATE
12/9/2021 12:00:00 AM
SITE_LOCATION
14720 N THORNTON RD
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO. 92-060 <br />SAN JOAQUIN SERVICE AREA 31 <br />AMADOR CORPORATION <br />CALIFORNIA STOP WASTEWATER FACILITY <br />SAN JOAQUIN COUNTY <br />-5- <br />If the Discharger monitors any pollutant at the locations designated herein more <br />frequently than is required by this Order, the results of such monitoring shall <br />be included in the calculation and reporting of the values required in the <br />discharge monitoring report form. Such increased frequency shall be indicated <br />on the discharge monitoring report form. <br />By 30 January of each year, the Discharger shall submit a written report to the <br />Executive Officer containing the following: <br />The names, certificate grades, and general responsibilities of all persons <br />employed at the WWTP (Standard Provision A.5). <br />The names and telephone numbers of persons to contact regarding the plant <br />for emergency and routine situations. <br />A statement certifying when the flow meter and other monitoring instruments <br />and devices were last calibrated,. including identification of who performed <br />the calibration (Standard Provision C.6). <br />A statement certifying whether the current operation and maintenance manual, <br />and contingency plan, reflect the wastewater treatment plant as currently <br />constructed and operated, and the dates when these documents were last <br />revised and last reviewed for adequacy. <br />The Discharger may also be requested to submit an annual report to the Board with <br />both tabular and graphical summaries of the monitoring data obtained during the <br />previous year. Any such request shall be made in writing. The report shall <br />discuss the compliance record. If violations have occurred, the report shall <br />also discuss the corrective actions taken and planned to bring the discharge into <br />full compliance with the waste discharge requirements. <br />All reports submitted in response to this Order shall comply with the signatory <br />requirements of Standard Provision D.6. <br />The Discharger shall implement the above monitoring program on the first day of <br />the month following effective date of this Order. <br />Ordered by (')&— a � L4 <br />WILLIAM H. CROOKS, Executive Officer <br />7 April 1992 <br />(Date) <br />PHL <br />2/19/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.