My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014580_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14720
>
1600 - Food Program
>
S-81-11
>
SU0014580_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 1:40:59 PM
Creation date
2/24/2022 1:39:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
SU0014580
PE
2600
FACILITY_NAME
S-81-11
STREET_NUMBER
14720
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
APN
05516031
ENTERED_DATE
12/9/2021 12:00:00 AM
SITE_LOCATION
14720 N THORNTON RD
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tam Walke: -2- May 1,'1487 <br />Comments on Development <br />2. Access to State Highway 12 and Thornton Road is restricted. <br />The use of Paddock Place for access from Thornton Road is <br />acceptable at this time but provision shall be made to <br />cul-de-sac it and take access from the interior collector <br />street in the event the event there is a conflict with the <br />construction of the grade separation at Thornton Road and <br />State Highway 12. Any access to Highway 12 will rea_uire <br />resciding of restriction. by Caltrans. <br />3. The following are the recommended tentative map conditions <br />based on the tentative map SU -87-17 application: <br />a. Construct frontage improvements along Thornton Road. <br />(100 -foot right of way), including pavement widening <br />concrete and curb, gutter and sidewalk <br />b. Construct full frontage improvements along DeBroggi Road <br />(100 -foot and 80 -foot rights of way), including 60 -foot <br />pavement and concrete curb, gutter and sidewalk on the <br />subdivided side in accordance with Public Works Standards <br />for an 84 -foot right-of-way urban street. <br />C. Construct full street improvements for the north -south <br />major collector street between State Highway 12 and <br />DeBroggi Road including 60 feet of pavement and concrete <br />curbs, gutters and sidewalks in accordance with Public <br />Works Standards for an 84 -foot right-of-way urban street. <br />The connection of this road with State -Route 12 is sub- <br />ject to Caltrans written approval. <br />d. Construct full street improvements for the collector <br />between DeBroggi Road.and the north -south major collector <br />including 40 feet of pavement. Concrete curbs, gutters <br />and sidewalk in accordance with Public Works Standards, <br />for a 60 -foot right of way urban street. <br />e. Access to parcels shall be off the interior streets. <br />f. Provide street lighting throughout subdivision and along <br />Thornton Road and DeBroggi Road frontages. <br />g. Provide public domestic water, sanitary sewer, and storm <br />drainage systems throughout the subdivision. <br />(1) Terminal drainage is required. (any retention pond <br />used for metering storm drainage runoff shall be <br />dedicated to the County) <br />
The URL can be used to link to this page
Your browser does not support the video tag.