My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MCHENRY
>
20451
>
2800 - Aboveground Petroleum Storage Program
>
PR0523036
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 1:04:49 PM
Creation date
2/25/2022 9:12:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0523036
PE
2832
FACILITY_ID
FA0010254
FACILITY_NAME
LIONUDAKIS FIREWOOD
STREET_NUMBER
20451
STREET_NAME
MCHENRY
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
24712012
CURRENT_STATUS
01
SITE_LOCATION
20451 MCHENRY AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/22/22 <br />Re: Inspection done on 2/22/22 — Aboveground Petroleum Storage Act <br />To Whom it May Concern: <br />This statement pertains to our inspection on 2/22/22. Since the last inspection in 2018 there has <br />been a lot of employees left and many hired. In all respect these employees were not properly trained in <br />all aspects of the company's responsibilities of all the reporting, inspections, and hazmat control. We <br />are working diligently to bring the facility up to compliance and are making every effort to do so in a <br />timely manner. <br />#103 — We have contacted a testing facility and they will be out to perform necessary test. Estimated <br />time of completion by 5/15/22. <br />#105— We have included photos of the tanks with the label "Permanently Closed". <br />#106 — We acknowledge that the report for the 2018 inspection was not filed until July 2019. <br />#605 —We have contacted our engineer to get the SPCC Plan updated with the requested information <br />added. Estimated time of completion 5/15/22. <br />#610 - We have contacted our engineer to get the SPCC Plan updated with the requested information <br />added. Estimated time of completion 5/15/22. <br />#624 - We have contacted our engineer to get the SPCC Plan updated with the requested information <br />added. Estimated time of completion 5/15/22. <br />#712 —This procedure has now been put in place. <br />#718 —We have fixed the leak. Cleaned the up the area. See Photos. <br />#719 —The barrel has been removed. See Photo <br />
The URL can be used to link to this page
Your browser does not support the video tag.