Laserfiche WebLink
3/22/22 <br />Re: Inspection done on 2/22/22 <br />To Whom it May Concern: kbD4�p_q <br />1� This statement pertains to our inspection on 2/22/22. Since the last inspection in 2018 there has <br />rr� been a lot of employees left and many hired. In all respect these employees were not properly trained in <br />r all aspects of the company's responsibilities of all the reporting, inspections, and hazmat control. Upon <br />this inspection we have ordered products, made phone calls, in the effort of getting back in compliance. <br />#103 — We have contacted a testing facility and they will be out to perform necessary test. Estimated <br />time of completion by 5/15/22. <br />#105 — We have ordered the labels for "Permanently Closed" <br />#106 - Please see the reason above. <br />#605 — We have contacted our engineer to get the SPCC Plan updated with the requested information <br />added. Estimated time of completion 5/15/22. <br />#610 - We have contacted our engineer to get the SPCC Plan updated with the requested information <br />added. Estimated time of completion 5/15/22. <br />#624 - We have contacted our engineer to get the SPCC Plan updated with the requested information <br />added. Estimated time of completion 5/15/22. <br />#712 —This procedure has now been put in place. <br />#718 — We have fixed the leak. Cleaned the up the area. See Photos. <br />#719 —The barrel has been removed. See Photo <br />