Laserfiche WebLink
<br />Spill Prevention, Control, and Countermeasure Plan NES, Inc. <br />Stockton Police Department i Project Number 495.EC4496.00 <br />22 East Market Street, Stockton, CA 95202 June 2021 <br />TABLE OF CONTENTS <br /> <br />Section 1: Emergency Telephone Numbers ................................................................................ 1 <br />Section 2: Facility Name & Location .......................................................................................... 2 <br />Section 3: General Applicability & Requirement to Prepare & Implement a SPCC Plan [40 <br />CFR 112.1 & 112.3] ....................................................................................................................... 3 <br />3.1 Applicability [40 CFR 112.1 & 112.3] ............................................................................... 3 <br />3.2 SPCC Plan Availability [40 CFR 112.3(e)] ........................................................................ 3 <br />3.3 Qualified Facility Criteria [40 CFR 112.3(g)] .................................................................... 4 <br />3.4 Engineer’s Statement and Certification [40 CFR 112.3(d)] ............................................... 5 <br />Section 4: Information Disclosure After Certain Discharges [40 CFR 112.4] ........................ 6 <br />4.1 U.S. EPA Reporting [40 CFR 112.4] ................................................................................. 6 <br />4.2 Facility Oil Spill History .................................................................................................... 7 <br />Section 5: SPCC Plan Amendment by Owner or Operator [40 CFR 112.5] ........................... 8 <br />5.1 SPCC Plan Amendments [40 CFR 112.5(a)] ..................................................................... 8 <br />5.2 SPCC Plan Review [40 CFR 112.5(b)] .............................................................................. 8 <br />5.3 SPCC Plan Revisions to Previous SPCC Plan .................................................................... 9 <br />Section 6: Qualified Facilities Plan Requirements [40 CFR 112.6] ........................................ 10 <br />Section 7: General Requirements for SPCC Plans [40 CFR 112.7] ....................................... 11 <br />7.1 Management Approval [40 CFR 112.7] ........................................................................... 11 <br />7.2 Facility Description & Diagram [40 CFR 112.7(a)(3)] .................................................... 12 <br />7.3 Description of Oil Storage [40 CFR 112.7(a)(3)(i)]......................................................... 13 <br />7.4 Discharge Prevention Measures [40 CFR 112.7(a)(3)(ii)] ............................................... 17 <br />7.5 Discharge or Drainage Controls [40 CFR 112.7(a)(3)(iii)] .............................................. 19 <br />7.6 Countermeasures for Discharge Discovery, Response & Cleanup [40 CFR <br />112.7(a)(3)(iv)] ................................................................................................................. 20 <br />7.7 Disposal of Recovered Materials [40 CFR 112.7(a)(3)(v)] .............................................. 20 <br />7.8 Contact List [40 CFR 112.7(a)(3)(vi)].............................................................................. 21 <br />7.9 Discharge Reporting Information & Procedures [40 CFR 112.7(a)(4)] .......................... 21 <br />7.10 Emergency Response Procedures [40 CFR 112.7(a)(5)] .................................................. 22 <br />7.11 Predicted Oil Discharge Directions, Volumes & Rates [40 CFR 112.7(b)] .................... 24 <br />7.12 Secondary Containment & Diversion Measures [40 CFR 112.7(c)] ............................... 26 <br />7.13 Demonstration of Practicability [40 CFR 112.7(d)] ......................................................... 26 <br />7.14 Inspections, Tests & Records [40 CFR 112.7(e)] ............................................................ 26 <br />7.15 Personnel Training & Discharge Prevention Briefings [40 CFR 112.7(f)(1) & (f)(3)] ... 28 <br />7.16 Plan Designated Person [40 CFR 112.7(f)(2)] ................................................................. 28