Laserfiche WebLink
<br />Spill Prevention, Control, and Countermeasure Plan NES, Inc. <br />Stockton Police Department ii Project Number 495.EC4496.00 <br />22 East Market Street, Stockton, CA 95202 June 2021 <br />7.17 Security [40 CFR 112.7(g)] .............................................................................................. 28 <br />7.18 Facility Tank Car & Tank Truck Loading/Unloading Rack [40 CFR 112.7(h)] .............. 29 <br />7.19 Field-Constructed Aboveground Storage Tanks [40 CFR 112.7(i)] ................................ 29 <br />7.20 Conformance with State Requirements [40 CFR 112.7(j)] .............................................. 29 <br />7.21 Qualified Oil-Filled Operational Equipment [40 CFR 112.7(k)] ..................................... 29 <br />Section 8: Requirements for Onshore Non-Production Facilities [40 CFR 112.8] ............... 30 <br />8.1 Facility Drainage [40 CFR 112.8(b)] ............................................................................... 30 <br />8.1.1 Diked Oil Storage Areas [40 CFR 112.8(b)(1-2)] ............................................... 30 <br />8.1.2 Drainage of Undiked Areas [40 CFR 112.8(b)(3-4)] ........................................... 30 <br />8.1.3 Multiple Drainage Treatment Units [40 CFR 112.8(b)(5)] .................................. 30 <br />8.2 Bulk Storage Containers [40 CFR 112.8(c)] .................................................................... 30 <br />8.2.1 Container Material & Construction [40 CFR 112.8(c)(1)] .................................. 30 <br />8.2.2 Secondary Containment [40 CFR 112.8(c)(2)] .................................................... 30 <br />8.2.3 Drainage of Diked Areas [40 CFR 112.8(c)(3)] .................................................. 31 <br />8.2.4 Buried or Partially Buried Tanks [40 CFR 112.8(c)(4-5)] ................................... 31 <br />8.2.5 Integrity Testing/Inspection [40 CFR 112.8(c)(6)] .............................................. 31 <br />8.2.6 Internal Heating Coils [40 CFR 112.8(c)(7)] ....................................................... 35 <br />8.2.7 Overfill Prevention [40 CFR 112.8(c)(8)] ........................................................... 35 <br />8.2.8 Correction of Visible Discharges [40 CFR 112.8(c)(10)] .................................... 37 <br />8.2.9 Mobile or Portable Containers [40 CFR 112.8(c)(11)] ........................................ 37 <br />8.3 Facility Transfer Operations, Pumping & Facility Process [40 CFR 112.8(d)] ............... 37 <br />8.3.1 Buried Oil Piping [40 CFR 112.8(d)(1)] .............................................................. 37 <br />8.3.2 Transfer Point Terminal Connections [40 CFR 112.8(d)(2)] .............................. 37 <br />8.3.3 Aboveground Pipe Supports [40 CFR 112.8(d)(3)] ............................................. 37 <br />8.3.4 Inspection of Aboveground Oil Piping, Valves & Appurtenances [40 CFR <br />112.8(d)(4)] .......................................................................................................... 37 <br />8.3.5 Vehicle Warnings for Aboveground Oil Piping [40 CFR 112.8(d)(5)] ............... 37 <br />Section 9: Facility Response Plans [40 CFR 112.20] ................................................................ 38 <br />9.1 Applicability of Substantial Harm Criteria [40 CFR 112.20(e)] ...................................... 38 <br />9.2 Certification of the Applicability of the Substantial Harm Criteria [Attachment C-II, <br />Appendix C to Part 112] ................................................................................................... 39 <br /> <br /> <br /> <br />