Laserfiche WebLink
Compliance Standard <br /> Checked for the presence of water-No water- RX❑Yes F-] No <br /> (SP001 6.10) <br /> Test alarm and equipment Over fill alarm FM <br /> (SP001 7.1.3) IXI Yes R No <br /> AST data plate on tank-Yes- [-X-1 Yes ❑ No <br /> (SP001 7.1.4) <br /> AST checked against applicable standards: Yes Yes F-] No <br /> (SP001 7.1.5) <br /> AST foundation inspection:-Yes- FX]Yes ❑ No <br /> (SP001 7.1.6) Yes F <br /> AST support inspection: -Yes- FX No <br /> (SP001 7.1.7) <br /> Secondary containment and spill control:-Concrete- FX-j Yes ❑ No <br /> (SP001 7.1.8) <br /> General conditions around ASTOKFX-1 Yes ❑ No <br /> (SP001 7.1.8.1) <br /> Foreign materials around ASM-None- FX-j Yes F-] No <br /> (SP001 7.1.8.2) <br /> Pipe supports: _No issues- FX-]Yes F] No <br /> (SP001 7;1.9.1} F <br /> Emergency vents & venting: _Emergency Venting X-1 Yes -1 No <br /> F <br /> (SP001 7.1.9.2) <br /> Primary tank gauge:_MechanicalYes No <br /> (SPOO 1 7.1.9.3) FX r-] <br /> Tank Overfill: Over fill by driver- FX-]Yes F-] No <br /> (SP001 7.1.9.6) Yes FR] No <br /> Bonding &grounding of AST -1-Yes- F <br /> (SP001 7.1.10) -1 No <br /> Inspection for corrosion-No corrosion- Yes F <br /> (SP001 7.1.11) <br /> Inspection of paint coating on tank and supports-Yes- FX-1 Yes F-] No <br /> (SP001 7.1.12) <br /> Original steel thickness of tank: 10 Gauge Steel- FXl Yes [-] No <br /> (SP001 7.2.2) <br /> Check AST tank for UL standards:-UL 142 [-X-] Yes Ej No <br /> (SP001 7.2.3) <br /> UT thickness measurements around tank surface:-Yes- FX-]Yes I-] No <br /> (SP001 7.2.4) <br /> inspect AST shell plate welds:-No defects- 7x Yes ❑ No <br /> (SP001 7.3.1) <br /> Take & record UTT readings:-Yes-0.145"- Fx�Yes ❑ No <br /> (SP001 7.3.1.1) <br /> External corrosion check:-No corrosion- [R] Yes F-] No <br /> (SP001 7.3.1.2) <br /> Inspect shell attachments: No attachments added ® Yes F-] No <br /> (SP001 7.3.2) <br />