Laserfiche WebLink
Item No. 1 <br /> PC : 5-17-84 <br /> S-84-5 <br /> Page 5 <br /> does not relieve the developer (or his engineer ) of the <br /> responsibility of providing an adequate drainage system. <br /> f . A County Service Area shall be formed prior to the accep- <br /> tance of the Map to provide for the operation, main- <br /> tenance, and improvement of the Storm Drainage System. <br /> g . The subdivider should agree to and shall pay service fees <br /> for the utility services from the time the improvements <br /> are accepted by the County to the end of the Fiscal Year, <br /> or up to a one ( 1) year period, as the case may be. <br />