My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014807
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14320
>
2600 - Land Use Program
>
PA-2200032
>
SU0014807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2022 3:20:31 PM
Creation date
3/16/2022 7:50:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014807
PE
2691
FACILITY_NAME
PA-2200032
STREET_NUMBER
14320
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20925010, -37, 20924036, -37
ENTERED_DATE
3/14/2022 12:00:00 AM
SITE_LOCATION
14320 W SCHULTE RD
RECEIVED_DATE
8/9/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADWAYS AND UTILITIES <br /> INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN * PHASE 2 <br /> 6 . 1 INTRODUCTION 6 . 2 STREET NETWORK <br /> Chapter 6 presents the major roadway and utility The main highway access to the Project Area are <br /> infrastructure and phasing required to support Interstate 205 to the north and Interstate 580 to <br /> the development of the Project. It also describes the south. The existing street network consists of <br /> certain "shared" improvements that will benefit International Parkway, providing access between <br /> the entire Project Area and will be funded and the two interstate freeways; Schulte Road at the <br /> maintained by property owners. It also provides mid-portion of the Project Area boundary; and <br /> information for construction and financing of Pavilion Parkway at the western boundary of the <br /> major infrastructure improvements. Development project, and Promontory Parkway at the northern <br /> of the Project Area will require the construction boundary of the Project. <br /> and installation of new infrastructure and public <br /> road improvements with the extension of existing Development of the Project Area will require <br /> roadways. The Project has been designed to improvements to the existing road network to <br /> implement and conform and extend the same include the extension of Pavilion and Promontory <br /> level of quality development and standards Parkway and improvements to existing Schulte <br /> established by the Cordes Ranch Specific Plan Road. Promontory Parkway and Schulte Road <br /> within the City of Tracy and adjacent to the both extend west and connect at International <br /> project site. Parkway to provide access to the freeways. <br /> International Parkway/ 11th Street/I-205 <br /> I-205 Interchange On/Off Ramp <br /> dMIUM <br /> 11th street <br /> ---- To Downmwn rm� <br /> Existing/Proposed <br /> Roads Capital Parks Drive <br /> 3 <br /> Westside <br /> Specific Plan <br /> Promontory Parkway <br /> Cordes Ranch <br /> (IPC Phase 1) 3 1 <br /> 1 <br /> iii i <br /> o <br /> IPCSP2 �'•, E <br /> Schulte Road <br /> 1 <br /> ! 1 SSD ads/ <br /> International) gra P j <br /> Parkway/1-580 <br /> a <br /> Interchange 99P dad/ <br /> r ..i <br /> Figure 6.1, Existing Roadways <br /> CHAPTER 6 <br /> 6-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.