My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014807
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14320
>
2600 - Land Use Program
>
PA-2200032
>
SU0014807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2022 3:20:31 PM
Creation date
3/16/2022 7:50:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014807
PE
2691
FACILITY_NAME
PA-2200032
STREET_NUMBER
14320
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20925010, -37, 20924036, -37
ENTERED_DATE
3/14/2022 12:00:00 AM
SITE_LOCATION
14320 W SCHULTE RD
RECEIVED_DATE
8/9/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN•PHASE 2 JUNE 24, 2022 <br /> Utility services required for development of <br /> the site will include ground wells, an on-site <br /> public water treatment facility, an on-site public <br /> wastewater treatment facility, a dedicated fire <br /> system and fire storage facility, and bio-treatment <br /> and detention basins to provide for the treatment <br /> 5 and storage of storm water. Water generated by <br /> the treatment of the wastewater facility will be <br /> recycled for the on-site irrigation of the landscape. <br /> Chapter 6 provides a complete description of <br /> 1 '� .. the public and private utilities necessary for the <br /> phased development of the project. <br /> d. Goals <br /> The IPCSP2 will ensure that future development <br /> creates an identity of its own with a commitment <br /> to sustainability, efficient site design, and well- <br /> designed buildings. The following goals have been <br /> established for the Project. <br /> • Accommodate a variety of light industrial <br /> # and warehouse and fulfillment center <br /> facilities to foster the growth of research <br /> and development and manufacturing and <br /> distribution uses. <br /> • Capitalize on the existing transportation <br /> corridors of Interstates 580 and 20S to meet <br /> the increased demand for distribution to the <br /> Bay Area and throughout California. <br /> • Create opportunities to generate jobs and <br /> contribute to a vibrant workplace in the San <br /> Joaquin Valley. <br /> .a I <br /> - :r Implement a range of sustainability measures <br /> aimed at conserving resources, decreasing <br /> f " energy and water consumption, and reducing <br /> air and water pollutants. <br /> Provide pedestrian and bicycle continuity to <br /> the established network crafted in the Cordes <br /> Ranch Specific Plan, see figures 1.4 and 1.5. <br /> CHAPTER 1 <br /> 1-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.