Laserfiche WebLink
INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN•PHASE 2 JUNE 24, 2022 <br /> Utility services required for development of <br /> the site will include ground wells, an on-site <br /> public water treatment facility, an on-site public <br /> wastewater treatment facility, a dedicated fire <br /> system and fire storage facility, and bio-treatment <br /> and detention basins to provide for the treatment <br /> 5 and storage of storm water. Water generated by <br /> the treatment of the wastewater facility will be <br /> recycled for the on-site irrigation of the landscape. <br /> Chapter 6 provides a complete description of <br /> 1 '� .. the public and private utilities necessary for the <br /> phased development of the project. <br /> d. Goals <br /> The IPCSP2 will ensure that future development <br /> creates an identity of its own with a commitment <br /> to sustainability, efficient site design, and well- <br /> designed buildings. The following goals have been <br /> established for the Project. <br /> • Accommodate a variety of light industrial <br /> # and warehouse and fulfillment center <br /> facilities to foster the growth of research <br /> and development and manufacturing and <br /> distribution uses. <br /> • Capitalize on the existing transportation <br /> corridors of Interstates 580 and 20S to meet <br /> the increased demand for distribution to the <br /> Bay Area and throughout California. <br /> • Create opportunities to generate jobs and <br /> contribute to a vibrant workplace in the San <br /> Joaquin Valley. <br /> .a I <br /> - :r Implement a range of sustainability measures <br /> aimed at conserving resources, decreasing <br /> f " energy and water consumption, and reducing <br /> air and water pollutants. <br /> Provide pedestrian and bicycle continuity to <br /> the established network crafted in the Cordes <br /> Ranch Specific Plan, see figures 1.4 and 1.5. <br /> CHAPTER 1 <br /> 1-5 <br />