Laserfiche WebLink
INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN•PHASE 2 JUNE 24, 2022 <br /> 0 0 � <br /> Detention Basin <br /> i <br /> J � <br /> Water Treatment �8~ Building <br /> Facility 8 E 8 9 <br /> International Park <br /> of Commerce Sewer Treatment <br /> 0 Facility F <br /> Detention Basin <br /> 0 0 00 � off, <br /> Building 1 <br /> e i <br /> Detention Basin <br /> Building 3 <br /> 0 � D IIIA a4 aaa���a�s <br /> Detention Bas n <br /> ail Possible Drive ay <br /> Building 4 <br /> i <br /> Treatment Basin <br /> J <br /> Building 5 <br /> Potential Substation <br /> Location , <br /> Figure 1.3, Concept Site Plan <br /> CHAPTER 1 <br /> 1-4 <br />