Laserfiche WebLink
INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN•PHASE 2 JUNE 24, 2022 <br /> Cold Storage Vehicle Uses <br /> Warehouse Temperature controlled for Vehicle Inspection Center <br /> frozen and perishable products, building P Vehicle Inspection Center is large-scale <br /> construction includes substantial and secure center for the inspection of <br /> insulation in roof and foundation walls used cars. The site will maximize the <br /> amount of parking for vehicles waiting to <br /> Parcel Hub be inspected and for vehicles that have P <br /> Regional and local freight-forwarder been inspected and are awaiting being <br /> facility, time sensitive shipments using purchased. Such uses often contain the <br /> air freight and ground via UPS, FedEx. P different areas for inspecting and <br /> Site development may include truck servicing of vehicles being prepared for <br /> maintenance,vehicle wash, and fueling sale. <br /> facility. Vehicle Auction Center <br /> Last Mile Fullfillment Center Large-scale and secure center for the P <br /> Facility focused on the movement of auction of vehicles. <br /> goods from a transportation hub to the <br /> final delivery destination.The final <br /> delivery destination is typically a <br /> personal residence or a local business. P <br /> The focus of last mile logistics is to <br /> deliver items to the end user as fast as <br /> possible. Such a center often involoves <br /> extensive storage of local delivery <br /> vehicles <br /> Trailer Storage <br /> Includes empty trailers as well as trailers <br /> loaded with finished goods for ultimate <br /> distribution to buisinesess ands <br /> consumers, and trailers containing parts P <br /> or commodities to facilitate just in time <br /> delivery to manufacturers <br /> Table 3.1, Permitted and Conditionally Permitted Uses cont. <br /> CHAPTER 3 <br /> 3-7 <br />