Laserfiche WebLink
No -traffic Area Installation Procedure Checklist cont. <br />❑ Step 8 continued: <br />Alarm Panel shall be: <br />✓ in a well ventilated area as dry and protected from elements as possible <br />✓ in as close of proximity to FujiMAC air blower as possible <br />✓ wired by licensed electrician <br />✓ in a location that allows unencumbered access for inspection and maintenance activity <br />❑ Step 9: For cold climate installations, please install insulated risers and covers and cover upper half of <br />treatment unit with min. R-8 value insulating material (i.e. foam board) <br />❑ Step 10: Float switch electrical cord should exit riser wall through a male adaptor (caulked watertight to <br />prevent septic gas leakage) or watertight fitting. An interior connection to direct burial cable is also an <br />acceptable option. <br />❑ Step 11: In nearly all cases, the Fuji Clean system will vent properly through the building's septic influent <br />line. In cases where there is an influent pump, or in severe downdraft locations, a separate vent should be <br />considered. If you do choose to install a vent, be sure that the vent slopes toward the tank so that any <br />moisture accumulation drips back down toward the tank. <br />❑ Step 12: During final landscaping, seeding etc., be sure to pitch final grade away from covers to sweep <br />surface water away from treatment tank. <br />❑ Step 13: Complete Warranty Activation Card. <br />❑ Step 14: Finalize Controller Wiring. Please have licensed electrician refer to wiring diagram (in Installer <br />Manual and enclosed separately in alarm/control panel). Upgraded Fuji Clean USA controllers are available <br />if telecommunications, elapsed time meter, data logging or other functions are required. Please contact Fuji <br />Clean USA for details. <br />❑ Step 15: Follow start-up procedure detailed in Installation Manual: <br />❑ 1. Outside Environment Check <br />❑ 2. Blower Box Check <br />❑ 3. Blower Operation and Blower Alarm Check <br />❑ 4. Water Level is at Low Water Level <br />❑ 5. High Water Float Switch Check <br />❑ 6. Set Recirculation Control Valve. (gray) <br />❑ 7. Check Recirculation Flow Rate <br />❑ 8. Check/Set Aeration Balance Control Valve (blue) <br />❑ 9. Check/Set Effluent Airlift Valve (white) <br />❑ 10. Check Effluent Airlift Pipe <br />❑ 11. Add Disinfectant Tablets to Chlorinator (if appropriate) <br />❑ 12. Check Alarm/Control Panel and Air blower <br />❑ 13. Final Site Preparation <br />❑ 14. Owner Communication - Service Provider and Warranty Delivery <br />Fuji Clean USA • 41-2 Greenwood Road • Brunswick Maine 04011 • Tel: 207-406-2927 • Fax: 207-406-2929 • <br />www.fujicleanusa.com <br />43 <br />