My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011914
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
ST JORGE
>
464
>
2600 - Land Use Program
>
PA-1800172
>
SU0011914
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2022 2:12:28 PM
Creation date
3/16/2022 2:10:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011914
PE
2690
FACILITY_NAME
PA-1800172
STREET_NUMBER
464
Direction
E
STREET_NAME
ST JORGE
STREET_TYPE
AVE
City
MOUNTAIN HOUSE
Zip
95391-
APN
26229065, -66, -67, -68
ENTERED_DATE
8/27/2018 12:00:00 AM
SITE_LOCATION
464 E ST JORGE AVE
RECEIVED_DATE
8/27/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
标签
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br />Electric Company" <br />August 30, 2018 <br />Frank Girardi <br />San Joaquin County <br />1810 East Hazelton Ave <br />Stockton, CA 95205 <br />Ref: Gas and Electric Transmission and Distribution <br />Dear Mr. Girardi, <br />Plan Review Team PGEPIanReview@pge.com <br />Land Management <br />6111 Bollinger Canyon Road 3370A <br />San Ramon, CA -94583 <br />Thank you for submitting PA -1800172 plans for ourYeview. PG&E will review the- submitted <br />.plans in relationship to any existing Gas and Electric#acil.ities within the project area. If the <br />proposed -project is adjacent/or within PG&E owned property and/or easements, we will be <br />working with you to ensure compatible uses and activities near our facilities. <br />Attached you will find information and requirements as it relates -to Gas facilities (Attachment 1) <br />and Electric facilities (Attachment 2). Please review these in detail, as it is critical to ensure <br />your safety and to protect PG&E's facilities and its- existing rights. <br />Below is additional information for your review: <br />1. This -pian review process does not replace -the application process -for PG&E gas -or <br />electric service your project may require. For these requests, please- continue- to work - <br />with PG&E Service -Planning: https://www.pge.com/en US/business/services/buildno- <br />and-renovation/overview/overview. r;aa e. <br />2. if the project being submitted is part of a larger project, please include the entire scope <br />-of your project, and not just a portion of it. PG&E's facilities are to be incorporated within <br />any CEQA document. PG&E needs to verify -that the CEQA document will identify any <br />required future PG&E services. <br />3. An engineering deposit may be required to review plans for a project depending on the <br />size, scope, and location -of the project and as it relates to a-ny rearrangement or new <br />installation -of PG&E facilities. <br />Any proposed uses within the PG&E fee strip and/or easement, may include a California- Public <br />Utility Commission (CPUC) Section fliflng- This requires the CPUC to -render approval fora - <br />conveyance of rights for specific uses on PG&E's fee strip or easement. PG&E will- advise if the <br />necessity to incorporate a CPUC Section 851filing is required. <br />This letter does not constitute PG&E's consent to use any portion of its easement for any <br />purpose not previously conveyed. PG&E will provide a project specific response as required. <br />Sincerely, <br />Plan Review Team <br />Land Management <br />PG&E Gas and Electric Facilities Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.