Laserfiche WebLink
Pacific Gas and <br />Electric Company„ <br />Attachment 1 — Gas Facilities - <br />There could be gas transmission pipelines in this area which would be considered critical <br />facilities for PG&E and a high priority subsurface installation under California law. Care must be <br />taken to ensure safety and accessibility. -So, please ensure that if PG&E approves work near <br />gas transmission pipelines it is -done in adherence with the below stipulations. Additionally, the <br />following link provides -additional information regarding legal requirements under California <br />excavation laws http://usarrorLh8l l,org/wp-contp-nt/uploads/2017/05/CA-LAW-English.pdf <br />1. Standby Inspection: A PG&E Gas Transmission Standby Inspector mu-st be present <br />during any demolition or construction activity -that -comes within 10 feet of the gas pipeline. This <br />inciudes all grading, trenching, substructure depth verifications (potholes), asphalt or concrete <br />demolition/removal, removal of trees, signs, light poles, etc. This -inspection can be -coordinated <br />through the Under -ground Service Alert (USA) service at 811. A minimum notice of 48 hours -is <br />required. Ensure the USA markings and notifications are maintained throughout the duration of <br />your work. <br />2. Access: At any time, PG&E may need to access, excavate, and perform work on the gas <br />pipeline. Any construction equipment; materials, or spoils may need to be removed upon notice. <br />Any temporary construction fencing -installed within. PG&E's easement would also need to be <br />capable of tieing removed at anytime upon- notice. Any plans to cut temporary slopes <br />exceeding a 1:4 grade within -10 -feet of a gas transmission -pipeline need to be approved by <br />PG&E Pipeline Services in writing PRIOR to performing the work. <br />3. wheel Loads: To prevent damage to the buried gas pipeline, there are weight limits that <br />must be enforced whenever any -equipment gets within 1-0 feet of traversing the pipe - <br />Ensure a list of the axle weights of -all equipment being used is available.for PG&E's -Standby <br />Inspector. -To confirm the depth of -cover, the pipeline may need to be potholed by hand in a -few <br />areas. <br />Due to the complex variability of tracked equipment, vibratory compaction equipment, and <br />cranes, PG&E must -evaluate those items on -a case-by-case basis prior to use over the gas <br />pipeline (provide a list of any proposed equipment of this type noting model num.:bers and <br />specific attachments). <br />No equipment may be set up over the gas pipeline -while operating_ Ensure craneoutriggers are <br />at least 10 feet from the centerline of the gas pipeline. Transport trucks must not be parked over <br />the gas pipeline while -being loaded -or unloaded. <br />4. Grading. PG& -E requires a minimum of 36 inches of cover over gas pipelines (or existing <br />grade if less) and a maximum -of 7 feet of cover at all locations. The graded surface cannot <br />exceed a cross slope of 1:4. <br />5. Excavating: Any digging within 2 feet of a gas pipeline must be dug by hand. Note that <br />while the minimum clearance is only 12 inches, any excavation work within 24 inches of the <br />edge of a pipeline must be done with hand tools. So to avoid having to dig a trench entirely with <br />hand tools, the edge of the trench must be over 24 inches away. (Doing the math for a 24 inch <br />wide trench being dug along a 36 inch pipeline, the centerline of the trench would need to be at <br />least 54 inches [24/2 + 24 + 36/2 = 54] away, or be entirely dug by hand.) <br />PG&E Gas and Electric Facilities Page 2 <br />