Laserfiche WebLink
d. Rule 3135 (Dust Control Plan Fee): The applicant shall submit a fee in addition to the Dust Control <br /> Plan. <br /> e. Rule 2201 (New and Modified Stationary Source Review Rule, Amended December 15, 2005): <br /> This rule applies to all new stationary sources and all modifications of existing stationary sources <br /> that are subject to the District's permit requirements and after construction emit or may emit one or <br /> more affected pollutant. The applicant must contact the District's Small Business Assistance Office <br /> at(209) 557-6446. <br /> 6. CALIFORNIA REGIONAL WATER QUALITY (Contact: [916]464-4683) <br /> a. Waste Discharge Requirements: Because wastewater will be generated and treated, stored, or <br /> disposed on the site at the processing facility, WDRs are required. The project proponent shall <br /> submit a Report of Waste Discharge (RWD). <br /> b. The property owner shall obtain permit coverage under the NPDES General Permit No. <br /> CAS000002 for Discharges of Storm Water Associated With Construction Activity. Before <br /> construction begins,the proponent must submit an NOI to comply with the permit to the State Water <br /> Resources Control Board, and a Stormwater Pollution Prevention Plan (SWPPP) must be <br /> prepared. <br /> c. Prior to increasing washwater discharges at the Vernalis Central facility beyond what is currently <br /> allowed in the current Waste Discharge Requirements (WDRs) for that facility, the applicant shall <br /> amend the existing WDRs issued by the Central Valley Regional Water Quality Control Board <br /> (CVRWQCB)for the Vernalis Central facility to accommodate the proposed increase in washwater <br /> discharge associated with the proposed project. <br /> d. Prior to discharging thickened washwater to the Phase A mining area, the applicant shall apply for <br /> and obtain WDRs from the CVRWQCB for the discharge of thickened washwater to the Phase A <br /> mining area. <br /> 7. CALTRANS— DISTRICT 10 (Contact: [209] 941-1921) <br /> a. TRAFFIC OPERATIONS: Traffic Operations concurs as a project condition, stated in the"Vernalis <br /> West and Vernalis East Traffic and Circulation Analysis," that Teichert would not increase their <br /> production over the currently permitted 4.0 million tons per year until the SR 132/Bird Road <br /> interchange and associated highway improvements are constructed. Teichert Aggregates will <br /> contribute their fair share to these improvements. <br /> PA-0500847—Conditions of Approval and Monitoring and Mitigation Reporting Plan 8 <br />