My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084912_LIQUID WASTE PLAN CHECK
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1868
>
4200 – Liquid Waste Program
>
SR0084912_LIQUID WASTE PLAN CHECK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2022 10:08:42 AM
Creation date
3/18/2022 9:42:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
LIQUID WASTE PLAN CHECK
RECORD_ID
SR0084912
PE
4201
FACILITY_NAME
EIJEN CORPORATION
STREET_NUMBER
1868
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
ENTERED_DATE
2/24/2022 12:00:00 AM
SITE_LOCATION
1868 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For All Systems <br /> The items in the list below must be checked during the final inspection of the Eljen GSF System: <br /> 1) Verify each line or row of modules is level. <br /> 2) Ensure that the painted white stripes on the module are facing up. <br /> 3) Verify the correct amount of ASTM C-33 sand is underneath the <br /> module. (Minimum of 6") <br /> 4) Based on the system design, verify the appropriate amount of <br /> specified sand is installed between module rows in bed systems <br /> and along the 4-foot module length in trench systems. <br /> 5) Verify there is 6 inches of specified sand at the beginning and end <br /> of the module in a row or a trench configuration. <br /> 6) Verify the 4-inch perforated pipe on top of the modules must meet <br /> SCH 40 requirements. <br /> 7) Verify the 4-inch perforated pipe has orifices at 4 and 8 o'clock over <br /> the modules. <br /> 8) Verify one wire clamp per module is installed over the 4-inch <br /> distribution pipe. <br /> 9) Verify the cover fabric is placed over the 4-inch perforated <br /> distribution pipe and draped over the sides of each module before <br /> specified sand is placed around the modules. The cover fabric must <br /> NOT be pulled tightly away from the 4-inch perforated pipe, <br /> because this causes tenting. <br /> CORPORATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.