My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084912_LIQUID WASTE PLAN CHECK
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1868
>
4200 – Liquid Waste Program
>
SR0084912_LIQUID WASTE PLAN CHECK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2022 10:08:42 AM
Creation date
3/18/2022 9:42:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
LIQUID WASTE PLAN CHECK
RECORD_ID
SR0084912
PE
4201
FACILITY_NAME
EIJEN CORPORATION
STREET_NUMBER
1868
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
ENTERED_DATE
2/24/2022 12:00:00 AM
SITE_LOCATION
1868 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inspection Checklist for Eljen GSF Systems <br /> Address Inspected By: <br /> (Printed Name) <br /> YES NO N/A <br /> 1. Visually check the high-level Is the high-level alarm <br /> alarm for a visual lit/audible? <br /> warning. Detect if audio alarm is <br /> going off on the system. <br /> 2. Visually check the effluent filter Is the effluent filter being <br /> every 6 months and clean as blocked by debris? <br /> necessary. <br /> 3. It is recommended to remove Does the septic tank need <br /> any solid waste from the septic to be pumped? <br /> tank every 3 to 5 years. <br /> 4. Visually inspect the vent on the Are there any obstructions <br /> system. Ensure that the vent is blocking the flow of air <br /> free from any debris and in <br /> proper working order. through the vent? <br /> s. Visually inspect the distribution Do adjustments need to <br /> box. Adjust flow out of the box be made to the <br /> as needed. distribution box to ensure <br /> equal distribution? <br /> 6. Inspect the field and ensure that Are there any visual signs <br /> there is no vegetation,evidence of failure? <br /> of heavy foot traffic or vehicular <br /> traffic over the system. All flows <br /> from downspouts and any other <br /> runoff should be diverted away <br /> from the field. Ensure there are <br /> no signs of surface ponding. <br /> 7. For pressure distribution and Is there a pump tank <br /> pump to gravity systems,a pump associated with this <br /> tank is required. <br /> system? <br /> s. Verify the following are to code Risers <br /> and found to be in good working Pump <br /> order. <br /> Floats <br /> Alarms <br /> Control Panel <br /> Counter Value <br /> Circle one PASS <br /> FAIL <br /> (Inspector signature and date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.