My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
UAR/PROP 65
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRADITION
>
1158
>
1600 - Food Program
>
PR0547409
>
UAR/PROP 65
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 10:18:47 AM
Creation date
3/23/2022 10:15:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
UAR/PROP 65
RECORD_ID
PR0547409
PE
1624
FACILITY_ID
FA0026951
FACILITY_NAME
THUB CAFE
STREET_NUMBER
1158
Direction
S
STREET_NAME
TRADITION
STREET_TYPE
ST
City
MOUNTAIN HOUSE
Zip
95391
CURRENT_STATUS
01
SITE_LOCATION
1158 S TRADITION ST
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CORDES VILLAGE PLAZARAJA SALEEM & SANDYA SALEEM, OWNERSTHuB TEA & CAKESREVISIONS DATE <br />DATEAPPROVAL <br />JOB: <br />DATE: <br />SHEET TITLE: <br />SHEET NO. <br />4/9/2020 <br />ADESNECILRCHITECTCW.NHOJ OWE <br />E <br />, <br />J <br />R. <br />NO. C-9199 <br />F <br />-1.N <br />E <br />R <br />3 1 -2 1O <br />ETATS <br />C A L IF O RNIAJohnWCowee,Jr.MOUNTAIN HOUSE, CAwww.architectural-concepts.net <br />johncowee06@gmail.com <br />ARCHITECTURAL <br />INTERIORS PLANNING <br />509 RAMONA AVE. <br />ALBANY, CA 94706-1431 <br />T/F 510-525-9630 <br />CONCEPTS <br />ARCHITECTURE <br />REVISION 0 <br />STAMP:1140 SOUTH TRADITION STREETSK-MH-C1TENAANT IMPROVEMENT DETAILS <br />A6.1 <br />1620 <br />7 3 <br />6 2 <br />5 1 <br />8 4 <br />9 <br />1519 <br />1418 <br />1317 <br />12 <br />11 <br />10 <br />ABCDEFG <br />DOOR SILL @ ENTRY <br />3" = 1'-0"MH-0002 <br />JAMB @ ENTRY DOOR <br />3" = 1'-0"MH-0009 <br />3-COAT STUCCO OVER BUILDING PAPER <br />BATT INSULATION PER TITLE-24 <br />WALL OR BRICK W.O., SEE ELEVATION <br />ALUMINUM FRAME <br />DOOR AS SCHEDULED <br />METAL TRIM OR STUCCO MOLD <br />5/8" GYP. BD. INTERIOR FINISH <br />1/4" WOOD SHIM W/ SEALANT EA. SIDE <br />6" STUDS @ 16" O.C. <br />1-1/4" WOOD SHIMS <br />ATTIC ACCESS DETAIL <br />3" = 1'-0"MH-00011 <br />ROOF RAFTER <br />CEILING JOISTS <br />3/8" PARTICLE BOARD <br />INTERIOR FINISH <br />MILCOR EDGE 4 SIDES <br />OPENING <br />22" X 30" MIN. <br />FOAM TRIM BAND DETAIL <br />3" = 1'-0"MH-0013 <br />(SEE TITLE 24)WALL INSULATION <br />STUCCO FINISH <br />FOAM TRIM w/ <br />1"1"1" <br />SEE SECTION ELEV. FOR MORE INFO. <br />GYP. BD. @ INTERIOR FINISH <br />2x STUD WALL @ 16" O.C. <br />(SEE SHEAR WAKK SCH.) <br />7/8" STUCCO <br />1/2" PLYWOOD <br />JOIST OR RAFTER WHERE <br />OCCURS SEE PLANS FOR <br />MORE INFO. <br />ARCHED OPENING <br />3" = 1'-0"MH-0014 <br />FLOOR LINE <br />ARCH OPENING <br />4" OPENING TO 4'-0" <br />6" OPENING OVER 4'-0" <br />ARCHED OPENING-TYPE 2 <br />3" = 1'-0"MH-0015 <br />FLOOR LINE <br />ARCHED OPENING <br />1/2 OPENING WIDTH <br />OPENING WIDTH AS SCHEDULED <br />ONE HOUR RATED INTR. WALL <br />3" = 1'-0" CBC TABLE 722 13-1.1.2 MH-0018 <br />2x STUD WALL @ 16" O.C. <br />WALL INSULATION-WHEREVER <br />SHEAR PLYWOOD <br />(SEE SHEAR WALL SCH., <br />APPLICABLE; (SEE TITLE 24) <br />WHEREVER APPLICABLE) <br />5/8" GYP. BD. <br />BOTTOM CHORD <br />ROOF TRUSS 5/8" GYPSUM BOARD <br />(TYPE "X" @ LOBBY 1-HOUR <br />FINISH FLOORFINISH FLOOR <br />ROOF FRAMING PER <br />STRUCTURAL PLANS <br />WALLS) <br />5/8" GYPSUM BOARD <br />(TYPE "X" @ LOBBY 1-HOUR <br />WALLS) <br />(TYPE "X" @ LOBBY <br />1-HOUR WALLS) <br />NON-RATED INTERIOR WALL <br />3" = 1'-0"MH-0019 <br />2x STUD WALL @ 16" O.C. <br />WALL INSULATION <br />SHEAR PLYWOOD <br />(SEE SHEAR WALL SCH., <br />(SEE TITLE 24) <br />WHEREVER APPLICABLE) <br />5/8" GYP. BD. <br />BOTTOM CHORD <br />ROOF TRUSS 5/8" GYPSUM BOARD <br />(TYPE "X" @ LOBBY 1-HOUR <br />FINISH FLOORFINISH FLOOR <br />ROOF FRAMING PER <br />STRUCTURAL PLANS <br />WALLS) <br />5/8" GYPSUM BOARD <br />(WP. GYP. BD. @ WET AREAS <br />USE CEMENT BACKER BD. <br />UNDER TILE) <br />1- HR RATED INTERIOR WALL <br />3" = 1'-0"MH-0020 <br />6" METAL STUD WALL @ 16" O.C. <br />3" SOUND INSULATION AS NOTED <br />1/2" PLYWOOD <br />(SEE SHEAR WALL SCH. <br />ON PLANS <br />5/8" GYPSUM BOARD <br />TYPE "X" (USE CEMENT BACKER <br />5/8" GYPSUM BOARD <br />TYPE "X" <br />FOR LOCATIONS) <br />BOARD UNDER TILE & WP. GYP. <br />BD. AT WET AREAS) <br />1- HR RATED EXTERIOR WALL <br />3" = 1'-0"MH-0020 <br />7/8" STUCCO <br />6" METAL STUD WALL @ 16" O.C. <br />WALL INSULATION <br />(SEE TITLE 24) <br />5/8" GYPSUM BOARD <br />(TYPE "X" @ 1-HOUR <br />WALLS) <br />3-COAT O/ LATH <br />& BLDG. PAPER <br />1/2" PLYWOOD <br />(SEE SHEAR WALL SCH.) <br />DOOR HEAD <br />3" = 1'-0"MH-0001 <br />3-COATS STUCCO OVER BLDG PAPER <br />4 "METAL STUDS @ 16" O.C. - SEE STR. <br />METAL FRAMING HEADER - SEE STR. <br />WALL OR BRICK W.O., SEE ELEVATION <br />ALUMINUM DOOR FRAME <br />DOOR AS SCHEDULED <br />METAL TRIM OR STUCCO MOLD W/ <br />BATT INSULATION PER TITLE-24 <br />1/4" WOOD SHIM <br />1/2" CDX SHEAR PLYWOOD - SEE STR. <br />5/8" GYP. BD. INTERIOR FINISH <br />ALUMINUM HEAD FLASHING <br />JAMB @ EXTERIOR DOOR <br />3" = 1'-0"MH-00010 <br />STUCCO OVER BUILDING PAPER <br />6" METAL STUD @ 16" O.C. <br />BATT INSULATION PER TITLE-24 <br />EXTERIOR DOOR AS SCHEDULED <br />5/8" GYP. BD. INTERIOR FINISH <br />1/2" CDX SHEAR PLYWOOD - SEE SCHED. <br />HOLLOW MTL. FRAME W/ 3-ANCHORS MIN <br />HEAD @ EXTERIOR DOOR <br />3" = 1'-0"MH-00010A <br />3-COAT STUCCO OVER BUILDING PAPER <br />6" METAL STUD @ 16" O.C. <br />HEADER - SEE STR. <br />EXTERIOR DOOR AS SCHEDULED <br />5/8" GYP. BD. INTERIOR FINISH <br />1/2" CDX SHEAR PLYWOOD - SEE SCHED. <br />BATT INSULATION PER TITLE-24 <br />HOLLOW MTL. FRAME W/ 2-ANCHORS MIN <br />GSM HEAD FLASHING <br />JAMB @ INTERIOR DOOR <br />3" = 1'-0"MH-00010 <br />6" METAL STUD @ 16" O.C. <br />3" BATT SOUND ATTENUATION INSUL. <br />EXTERIOR DOOR AS SCHEDULED <br />5/8" GYP. BD. INTERIOR FINISH <br />HOLLOW MTL. FRAME W/ 3-ANCHORS MIN <br />5/8" GYP. BD. INTERIOR FINISH <br />HEAD @ INTERIOR DOOR <br />3" = 1'-0"MH-00010A <br />3-COAT STUCCO OVER BUILDING PAPER <br />6" METAL STUD @ 16" O.C. <br />HEADER - SEE STR. <br />EXTERIOR DOOR AS SCHEDULED <br />5/8" GYP. BD. INTERIOR FINISH <br />1/2" CDX SHEAR PLYWOOD - SEE SCHED. <br />BATT INSULATION PER TITLE-24 <br />HOLLOW MTL. FRAME W/ 2-ANCHORS MIN <br />GSM HEAD FLASHING <br />SEALANT EACH SIDE <br />WINDOW MULLION <br />3" = 1'-0"MH-0009A <br />WALL OR BRICK W.O., SEE ELEVATION <br />ALUMINUM WINDOW BEYOND <br />GLAZING AS SCHEDULED <br />GLAZING AS SCHEDULED <br />ALUMINUM WINDOW FRAME <br />WINDOW/DOOR MULLION <br />3" = 1'-0"MH-0009A <br />ALUMINUM DOOR FRAME <br />DOORS AS SCHEDULED <br />GLAZING AS SCHEDULED <br />ALUMINUM WINDOW FRAME <br />WINDOW SILL <br />3" = 1'-0"MH-0007A <br />BATT INSULATION PER TITLE-24 <br />7/8' 3-COAT STUCCO O/ PAPER & LATH <br />SLIDE WINDOW, FIX GLAZE SIMILAR <br />5/8" GUYP. BD.INTERIOR FINISH <br />6" METAL STUDS @ 16" O.C. <br />SILL @ STOREFRONT WINDOW <br />3" = 1'-0"MH-0004A
The URL can be used to link to this page
Your browser does not support the video tag.