My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
OAK
>
110
>
1600 - Food Program
>
PR0547227
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 10:45:18 AM
Creation date
3/23/2022 10:36:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0547227
PE
1626
FACILITY_ID
FA0026806
FACILITY_NAME
THE OXFORD KITCHEN
STREET_NUMBER
110
Direction
W
STREET_NAME
OAK
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
110 W OAK ST
P_LOCATION
02
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHEET TITLE:DRAWING SHEET NO:COPYRIGHT:CHECKED BY:DRAWN BY:DATE:CAD FILE:PROJECT NO:ISSUE:MARKDATEDESCRIPTIONCordell Constructions, Larry Johnson; Phone: 408-221-8126PLUMBING NOTESP000The Oxford Kitchen andGastropub110W OAK STREETLODI, CALIFORNIA,92101. CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE AND VERIFYING ALL EXISTING FIELD CONDITIONS PRIOR TO SUBMISSION OF BlD.2. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WORK WITH THE WORK OF ALL OTHER TRADES AND MAKING ANY NECESSARY MODIFICATIONS TO WORK AT NO ADDITIONAL COST, INCLUDING ALL OFFSETS.3. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATION OF ANY EXISTING MINOR INTERFERENCE'S. INCLUDING CONDUIT, HANGERS, ETC., AT NO ADDITIONAL COST.4. CONTRACTOR SHALL REMOVE EXISTING EQUIPMENT AND MATERIALS PERTAINING TO CONTRACT AS SPECIFIED OR AS REQUIRED WHETHER SHOWN ON THE DRAWINGS OR NOT. TO PREPARE FOR THE NEW WORK.5. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH LOCAL CODES. THESE CODES SHALL BE FOLLOWED AS MINIMUM PROVIDING HIGHER GRADES OF MATERIAL AND WORKMANSHIP WHERE REQUIRED BY THESE DOCUMENTS. PROVIDE ALL TESTS REQUIRED BY LOCAL CODES.6. ALL PERMITS. FEES. LICENSES. APPROVALS AND OTHER ARRANGEMENTS FOR WORK SHALL BE OBTAINED BY THE CONTRACTOR AT HIS OWN EXPENSE.7. SUBMIT ASSEMBLED PRINTED INSTRUCTIONS FOR THE OPERATION AND MAINTENANCE OF EACH ITEM INSTALLED ALONG WITH EQUIPMENT CUTS AND CONTROL WIRING DIAGRAMS.8. SUBMIT COORDINATED SHOP DRAWINGS FOR REVIEW. THE SHOP DRAWINGS SHALL INDICATE WORK OF OTHER TRADES AND MUST BE SUBMITTED PRIOR TO FABRICATION AND INSTALLATION.9. SUBMIT EQUIPMENT SPECIFICATIONS FOR REVIEW BEFORE PURCHASE.10. CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIAL FOR ONE YEAR AFTER COMPLETION AGAINST ALL DEFECTS OF MATERIAL, EQUIPMENT AND WORKMANSHIP.11. PROVIDE COMPETENT OPERATING TECHNICIAN TO INSTRUCT THE OWNER IN THE OPERATION AND MAINTENANCE OF THE INSTALLED EQUIPMENT. 12. PROVIDE ACCESS PANELS FOR ALL VALVES OR ANY PIECE OF EQUIPMENT WHEN NECESSARY TO LOCATE ABOVE NON-ACCESSIBLE CEILINGS. PROVIDE SUBMITTAL DRAWINGS FOR APPROVAL OF THE ARCHITECT. NO EQUIPMENT SHALL BE LOCATED DIRECTLY ABOVE WALLS. 13. PROVIDE ALL HOLES, SLEEVES AND CAULKING FOR INSTALLATION OF THIS WORK. CAULKING TO CONFORM TO FIRE RATING OF WALLS. 14. PIPING SHALL BE ABOVE CEILING AND CLEAR ANY EXISTING PIPING, LIGHTING FIXTURES, DUCTS, ETC. 15. RUN NEW WASTE PIPES AS CLOSE AS POSSIBLE TO UNDERSIDE OF FLOOR SLAB AND VENT PIPING AS CLOSE AS POSSIBLE TO SLAB ABOVE. 16. RUN ALL PIPING OCTAGONAL & PARALLEL TO CLOSEST WALL OR PRIMARY STRUCTURAL ELEMENTS.17. CONTRACTOR SHALL SUBMIT SKETCH TO THE STRUCTURAL ENGINEER FOR APPROVAL, PRIOR TO MAKING REQUIRED BEAM PENETRATIONS. 18. DISRUPTION OF ANY EXISTING SERVICE SHALL BE COORDINATED WITH THE OWNER AND SHALL BE PERFORMED AT A TIME AND MANNER SO AS TO CAUSE THE OWNER A MINIMUM OF INCONVENIENCE. 19. FOR EXACT LOCATION OF PLUMBING FIXTURES, REFER TO ARCHITECTURAL PLANS AND ELEVATIONS.20. INSULATION: DOMESTIC HOT AND COLD WATER PIPING SHALL BE INSULATED WITH 1’’ THICK 4# DENSITY, GLASS FIBER PRE-FORMED, ALL PURPOSE FLAME RETARDANT JACKET WITH BUILT-IN VAPOR BARRIER. PROVIDE INSULATION PIPE HANGERS WHEN NECESSARY, ARMACELL, ARMAFIX IPH OR21. MATERIALS SHALL BE RATED FOR THE OPERATING TEMPERATURE AND PRESSURE OF THE HYDRONIC SYSTEM. MATERIALS SHALL BE SUITABLE FOR THE TYPE OF FLUID IN THE HYDRONIC SYSTEM. 22. PROJECT PREMISES SHALL BE THOROUGHLY CLEANED AND READY FOR OCCUPANCY INCLUDING ALL FINISHES OF EQUIPMENT PROVIDED AS PART OF THE CONTRACTOR'S WORK.23. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF ACCEPTANCE BY THE OWNER AND SHALL REPAIR OR REPLACE AT NO ADDITIONAL COST TO THE OWNER ANY PART THEREOF WHICH MAY BECOME DEFECTIVE DURING THE PERIOD OF GUARANTEE, ORDINARY WEAR AND TEAR EXCEPTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND PAY FOR ANY DAMAGES RESULTING FROM OR CAUSED BY DEFECTS IN HIS/HER WORK.24. PIPING SHOWN IS SCHEMATIC AND DOES NOT INDICATE EVERY OFFSET. ELBOW, UNION, VALVE, TRAP. ACCESS PANEL. ETC., THAT IS REQUIRED FOR A COMPLETE WORKING SYSTEM. PROVIDE ITEMS AND FITTINGS THAT ARE REQUIRED TO INSTALL THE PIPING SYSTEM WITHIN THE SPACE PROVIDED AND THAT ARE REQUIRED FOR A COMPLETE SYSTEM. PIPING SHALL BE PROPERLY SECURED IN ACCORDANCE WITH MSS STANDARD SP-69. 25. MATERIALS SHALL BE RATED FOR THE OPERATING TEMPERATURE AND PRESSURE OF DOMESTIC SYSTEM. MATERIALS SHALL BE SUITABLE FOR THE TYPE OF FLUID IN THE DOMESTIC SYSTEM.26. PIPE SUPPORTS SHALL BE SELECTED AND INSTALLED IN ACCORDANCE WITH THE MSS SP-69 OR LOCAL CODES, WHICHEVER IS MORE STRINGENT. UTILIZE TRAPEZE HANGERS FOR PARALLEL RUNS OR PIPING. OTHER THAN SPRINKLER AND WASTE PIPING. COPPER PIPING SYSTEMS SHALL BE SUPPORTED ON COPPER OR COPPER-PLATED SUPPORTS. HANG PIPE FROM SUBSTANTIAL BUILDING STRUCTURE, PIPING SHALL NOT BE HUNG FROM OTHER PIPING. ALL RIGID HANGERS SHALL PROVIDE A MEANS OF VERTICAL ADJUSTMENT AFTER ERECTION. SHIELD SHALL BE PROVIDED BETWEEN HANGERS AND INSULATION.27. PLUMBING FIXTURES: A. FURNISH AND INSTALL PLUMBING FIXTURES INDICATED. FIXTURES TO BE FIRST QUALITY, CONNECTED, CLEANED AND READY FOR USE. PIPING TO BE PROPERLY SECURED TO WALLS AND STUDS.B. PROVIDE TRAPS AND SUPPLIES WITH STOPS. MAKE ALL FINAL CONNECTION TO EACH FIXTURE. 28. HANGERS: A. PIPE HANGERS ON HOT PIPING TO BE ON INSIDE OF INSULATION. PROVIDE WITH SADDLES AND/OR SHIELDS AS REQUIRED.B. PIPE HANGERS ON COLD PIPING TO BE ON OUTSIDE OF INSULATION. PROVIDE WITH SADDLES AND/OR SHIELDS AS REQUIRED.29. PROVIDE ANY AND ALL ITEMS NECESSARY TO COMPLETE THE PLUMBING SYSTEM. THE PLUMBING DRAWINGS ARE DIAGRAMMATIC AND DO NOT NECESSARILY SHOW ALL VALVES, FITTINGS, TRAPS, CONTROL DEVICE METHODS.30. INSTALL ALL ADA FIXTURES IN AN ADA COMPLIANT MANNER.31. INSTALL SKAL + GARD #SC-100B ON SINKS SUPPLIES AND TRAPS FOR HANDICAPPED USE. GENERAL NOTES:THE DRAWINGS PREPARED FOR THIS PROJECT ARE AN OUTLINE TO SHOW WHERE PIPES, DUCTS AND APPARATUSES MUST GO IN ORDER TO HARMONIZE WITH THE BUILDING AND INSTALLATION OF THE VARIOUS TRADES. WORK MUST BE INSTALLED IN ACCORDANCE WITH THE DRAWINGS AS MUCH AS POSSIBLE. DRAWINGS SHALL BE CAREFULLY CHECKED DURING THE COURSE OF BIDDING AND CONSTRUCTION. IF DISCREPANCIES, ERRORS OR OMISSIONS ARE DISCOVERED PRIOR TO OR DURING CONSTRUCTION PHASE, NOTIFY THE ENGINEER IMMEDIATELY FOR INTERPRETATION OR CORRECTION. TAKE NECESSARY MEASUREMENTS AND RESPONSIBLE FOR SAME, INCLUDING CLEARANCES FOR EQUIPMENT THAT ARE TO BE FURNISHED. THE ARCHITECT /ENGINEER RESERVE THE RIGHT TO MAKE MINOR LOCATION CHANGES OF PIPING AND EQUIPMENT WHERE SUCH ADJUSTMENTS ARE DEEMED DESIRABLE FROM AN APPEARANCE OR OPERATIONAL STANDPOINT. SUCH CHANGES WILL BE ANTICIPATED SUFFICIENTLY IN ADVANCE OR AVOID EXTRA WORK OR DELAY THE PROGRESS OF THE PROJECT.EXAMINATION OF EXISTING CONDITIONS:32. VISIT AND CAREFULLY EXAMINE THOSE PORTIONS OF THE SHE AND/OR PRESENT BUILDINGS AFFECTED BY THIS WORK SO AS TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND DIFFICULTIES THAT WILL ATTEND THE EXECUTION Of THE WORK BEFORE SUBMITTING PROPOSALS. 33. SUBMISSION OF A PROPOSAL WILL BE CONSTRUCTED AS EVIDENCE THAT SUCH EXAMINATION HAS BEEN MADE AND LATER CLAIMS FOR LABOR, EQUIPMENT OR MATERIALS REQUIRED BECAUSE DIFFICULTIES ENCOUNTERED. WHICH COULD HAVE BEEN FORESEEN HAD SUCH AN EXAMINATION HAD BEEN MADE, WILL NOT BE RECOGNIZED. CONNECTIONS TO EXISTING WORK:34. PLAN INSTALLATION OF NEW WORK AND CONNECTIONS TO EXISTING WORK TO INSURE MINIMUM INTERFERENCE WITH REGULAR OPERATION OF EXISTING FACILITIES.35. PROJECT PREMISES SHALL BE THOROUGHLY CLEANED AND READY FOR OCCUPANCY INCLUDING ALL FINISHES OF EQUIPMENT PROVIDED AS PART OF THE CONTRACTOR'S WORK AT PROJECT CLOSEOUT. APBFPC.O.PCWDWEX.HWLAVOSDTPVTVS.A.SKVVTRWWCGATE VALVETRAP SEAL PRIMER VALVEACCESS PANELBACKFLOW PREVENTERCLEAN OUT PLUGCOLD WATERDISHWASHER MACHINEEXISTINGHOT WATERLAVATORYOPEN SITE DRAINTRAP PRIMER VALVETEMPERING VALVESHOCK ABSORBER (WATER HAMMER)SINKVENTVENT THROUGH ROOFWASTEWATER CLOSETPONT OF CONNECTION OF NEW WORK TO EXISTING WORKEND OF DEMOLITIONCROSS HATCH DEMOLITIONDEMOLITION KEYED NOTESNEW WORK EQUIPMENT/FIXTURE TAG NUMBERREFERENCE WATER RISER TAG NUMBERCLEANOUTNEW WORK KEYED NOTESFLOOR CLEANOUTFLOOR DRAINEQUIPMENT NUMBERNEW VENTNEW SANITARYNEW HOT WATERNEW COLD WATERREMOTE MANUAL PULL STATION227W24'' CO7FCOFCOWH1DISREGARD SYMBOLS WHICH ARE NOT APPLICABLE TO THIS PROJECTPLUMBING SYMBOL LISTNEW GRAY WATER SANITARYBLACK/GRAY WATER VALUEV
The URL can be used to link to this page
Your browser does not support the video tag.