My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2022 11:51:23 AM
Creation date
3/23/2022 2:57:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />6. TANK SECONDARY CONTAINMENT TEST <br />Test Method Developed by H Manufacturer H Industry Standard ❑ Professional Engineer <br />Test Type ❑ Pressure H Vacuum ❑ Hydrostatic <br />Test Equipment Used: 0-30inHg. 4" Vacuum Gauges w/ 0.05 graduations <br />Tank ID <br />T-1 DSL Product <br />T-2 87 Product <br />T-3 91 Product <br />Tank Manufacturer <br />A.O. Smith <br />A.O. Smith <br />A.O. Smith <br />Tank Capacity <br />9:00am <br />9:00am <br />9:00am <br />Test Start Time <br />5psi <br />5psi <br />5psi <br />Initial Reading <br />10:00am <br />10:00am <br />10:00am <br />Test End Time <br />5psi <br />5psi <br />5psi <br />Final Reading <br />0.00 <br />0.00 <br />0.00 <br />Change in Reading <br />No Loss <br />No Loss <br />No Loss <br />No Loss <br />Pass/Fail Criteria <br />No Loss <br />No Loss <br />No Loss <br />No Loss <br />Tightness Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />7. PIPE SECONDARY CONTAINMENT TEST <br />Test Method Developed by H Manufacturer H Industry Standard ❑ Professional Engineer <br />Test Type H Pressure ❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: Dual 0-15psi 4" Pressure Gauges w/ 0.05 graduations <br />Pipe Run ID <br />T-1 DSL Product <br />T-2 87 Product <br />T-3 91 Product <br />Pipe Manufacturer <br />A.O. Smith <br />A.O. Smith <br />A.O. Smith <br />Test Start Time <br />9:00am <br />9:00am <br />9:00am <br />Initial Reading <br />5psi <br />5psi <br />5psi <br />Test End Time <br />10:00am <br />10:00am <br />10:00am <br />Final Reading <br />5psi <br />5psi <br />5psi <br />Change in Reading <br />0.00 <br />0.00 <br />0.00 <br />Pass/Fail Criteria <br />No Loss <br />No Loss <br />No Loss <br />No Loss <br />Tightness Test Results <br />H Pass ❑ Fail <br />H Pass ❑ Fail <br />H Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />No Loss <br />No Loss <br />No Loss <br />No Loss <br />Tightness Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />All tests marked "Fail' and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 2of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.